Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability & Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

DEReliction: A Cybersecurity Vulnerability Assessment Methodology for Distributed Energy Resources

With the increasing integration of Distributed Energy Resources (DER) into the electric grid, maintaining grid reliability and resilience requires that these devices remain secure. This paper discusses a cybersecurity vulnerability assessment methodology that incorporates best practices from Sandia National Laboratories, SANS Institute, OWASP Foundation, and other web and Internet of Things (IoT) penetration testing (“pen testing”) programs, courses, and frameworks for assessing the security posture of devices. The methodology involves five sequential steps: (1) Collect Public Information, (2) Extract Hardware Details, (3) Inventory Software Components, (4) Identify Vulnerabilities, and (5) Test Vulnerabilities. Each step uncovers potential weaknesses in both hardware and software components of DER devices, considering adversary tactics, techniques, and procedures (TTPs), and potential attack vectors along the way. The results from the execution of this method on multiple residential- and small commercial-scale photovoltaic (PV) inverters reveled hardware and software vulnerabilities, which highlight the benefit of taking a methodical approach to discover vulnerabilities. While the specific vulnerability details are not shared here, a generalized overview of findings underscore the importance of robust security assessments for DER devices. Adoption of an assessment framework of this kind will identify and mitigate cybersecurity threats and bolster the resilience of DER-integrated electric grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forecasting EV Charging Demand on the Distribution System

The U.S. transportation and electricity sectors have historically operated independently, but the growth of electric vehicles (EVs) is driving their convergence. After decades of stagnant demand, utilities must prepare for rising load growth, driven in part by transportation electrification. Utilities must anticipate when and where these new loads will materialize to effectively manage EV growth and maintain grid reliability. This presentation outlines NREL's approach to developing high-resolution EV load datasets for distribution planning, with insights from the Multi-State Transportation Electrification Impact Study on EV and load forecasting, infrastructure requirements, and managed charging strategies.

25 ENERGY STORAGE↗

Enhancing Power Resilience for Remote Communities: A Comprehensive Renewable Energy Solution for Itbayat Island

The island of Itbayat, Philippines, faces significant challenges in maintaining a reliable and resilient power supply due to its current reliance on a vulnerable power distribution system managed by a local electric cooperative. The existing infrastructure, which includes diesel generators and a radial network configuration with some above-ground lines, is highly susceptible to frequent typhoons and adverse weather conditions. These factors, combined with inadequate staffing and high operational costs, result in frequent power outages that disrupt daily life and hinder economic development. This white paper proposes a comprehensive solution to enhance the resilience and reliability of Itbayat's power system by integrating renewable energy sources, specifically solar photovoltaic (PV) systems, battery storage, and a microgrid controller. The proposed solution aims to reduce dependency on diesel fuel, optimize energy use, and provide a sustainable and robust power supply for the island. Key components of the solution include: 1. Solar PV Installation: Deploying solar PV panels to harness abundant solar energy, reducing reliance on diesel fuel. 2. Battery Storage Systems: Installing battery storage to store excess solar energy and ensure a continuous power supply during low solar generation periods. 3. Microgrid Controller: Implementing a microgrid controller to manage and optimize the integration of solar PV, battery storage, and existing diesel generators. The proposed solution addresses several critical issues, including system vulnerability, generator dependency, and operational inefficiencies. By adopting this innovative approach, Itbayat Island can achieve a more resilient, efficient, and sustainable energy infrastructure, ensuring a stable power supply for its residents and enhancing overall energy security.

14 SOLAR ENERGY↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Monitoring the readout temperature in the ICARUS TPC (2023 Italian Students Program Final Report)

Being a Liquid Argon Time Projection Chamber (LAr-TPC) detector, ICARUS exploits a series of three parallel wire planes to measure and collect the ionization charge coming from an event inside the active volume. The wires are read out by A2795 custom boards, arranged in crates located on top of the two liquid Argon vessels. Each board is provided with two temperature sensors that allow temperature monitoring while the experiment is running: this is key in order to ensure data reliability and maintain hardware in safe conditions. Moreover, temperature-related problems may force unplanned shutdowns that result in losing valuable time for the experiment to run. In this work we are discussing the characterization of the ICARUS TPC board temperatures and the system we implemented in order to monitor them effectively. Among the tools used, Grafana results in a valid application for both displaying temperature data and sending alerts to the shifters whenever a pathological situation occurs.

42 ENGINEERING↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Solar Energy CommUnity Resiliency (Final Technical Report)

Final Technical Report for DE-EE0009336 Solar Energy CommUnity Resiliency (SECURE) The Solar Energy CommUnity Resiliency (SECURE) project aimed to support development of resilient community microgrids to improve grid reliability and maintain power during times of crisis. The SECURE project approached this objective by addressing key technical and business challenges impeding implementation of resilient community microgrids. To achieve the goals of this project, we pursued several specific objectives through comprehensive design and requirements development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Security Constrained Economic Optimization of Photovoltaic and Other Distributed Assets

The rapid growth of distributed energy resources (DERs), especially photovoltaic (PV) systems, has introduced new complexities in maintaining grid reliability, stability, and cost-effective operation. This project addresses these challenges by developing and demonstrating a scalable GridOS Distributed Energy Resource Management System (DERMS) that enables secure, real-time optimization and control of DERs at the distribution feeder level.

14 SOLAR ENERGY↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Gaussian Process Regression for Aggregate Baseline Load Forecasting

Demand response (DR) is one of the most effective ways to maintain the reliability and improve the flexibility of power systems. Accurate forecasts of baseline loads are essential for DR programs. In the era of big data, machine learning-based approaches present a unique opportunity for baseline load forecasting. Thus, this paper presents a machine learning-based approach using a relatively less explored algorithm, Gaussian process regression (GPR), to forecast aggregate baseline loads. As such, a dataset was generated using a set of EnergyPlus simulations. Using the generated dataset, a GPR-based forecasting model was developed. In addition, support vector regression (SVR)-, artificial neural network (ANN)-, and averaging-based models were developed as baseline models for comparison. These models were compared in terms of accuracy, simplicity, and integrity. The prediction performance of the models showed that the GPR-based model is more accurate and reliable than the others. Such high performance shows the potential of the GPR in baseline load forecasting. GPR, therefore, can be used for DR applications.

Amasyali, Kadir↗

Hybrid renewable energy systems: the value of storage as a function of PV-wind variability

As shares of variable renewable energy (VRE) on the electric grid increase, sources of grid flexibility will become increasingly important for maintaining the reliability and affordability of electricity supply. Lithium-ion battery energy storage has been identified as an important and cost-effective source of flexibility, both by itself and when coupled with VRE technologies like solar photovoltaics (PV) and wind. In this study, we explored the current and future value of utility-scale hybrid energy systems comprising PV, wind, and lithium-ion battery technologies (PV-wind-battery systems). Using a price-taker model with simulated hourly energy and capacity prices, we simulated the revenue-maximizing dispatch of a range of PV-wind-battery configurations across Texas, from the present through 2050. Holding PV capacity and point-of-interconnection capacity constant, we modeled configurations with varying wind-to-PV capacity ratios and battery-to-PV capacity ratios. We found that coupling PV, wind, and battery technologies allows for more effective utilization of interconnection capacity by increasing capacity factors to 60%–80%+ and capacity credits to close to 100%, depending on battery capacity. We also compared the energy and capacity values of PV-wind and PV-wind-battery systems to the corresponding stability coefficient metric, which describes the location-and configuration-specific complementarity of PV and wind resources. Our results show that the stability coefficient effectively predicts the configuration-location combinations in which a smaller battery component can provide comparable economic performance in a PV-wind-battery system (compared to a PV-battery system). These PV-wind-battery hybrids can help integrate more VRE by providing smoother, more predictable generation and greater flexibility.

14 SOLAR ENERGY↗

Dynamic Modeling of a Kaplan Hydroturbine Using Optimal Parametric Tuning and Real Plant Operational Data

To address grid variability caused by renewable energy integration and to maintain grid reliability and resilience, hydropower must quickly adjust its power generation over short time periods. This changing energy generation landscape requires advance technology integration and adaptive parameter optimization for hydropower systems via digital twin effort. However, this is difficult owing to the lack of characterization and modeling for the nonlinear nature of hydroturbines. To solve this issue, this paper first formulates a six-coefficient Kaplan hydroturbine model and then proposes a parametric optimization tuning framework based on the Nelder–Mead algorithm for adaptive dynamic learning of the six-coefficients so as to build models that describe the turbine. To assess the performance of the proposed optimal parametric tuning technique, operational data from a real-world Kaplan hydroturbine unit are collected and used to model the relationship between the gate opening and the generated power production. The findings show that the proposed technique can effectively and adaptively learn the unknown dynamics of the Kaplan hydroturbine while optimally tune the unknown coefficients to match the generated power output from the real hydroturbine unit with an inaccuracy of less than 5%. The method can be used to provides optimal tuning of parameters critical for controller design, operational optimization and daily maintenance for hydroturbines in general.

13 HYDRO ENERGY↗

Application of Condition-Based Monitoring Techniques for Remote Monitoring of a Simulated Gas Centrifuge Enrichment Plant

This paper presents research into the adaptation of monitoring techniques from maintainability and reliability (M&R) engineering for remote unattended monitoring of gas centrifuge enrichment plants (GCEPs) for international safeguards. Two categories of techniques are discussed: the sequential probability ratio test (SPRT) for diagnostic monitoring, and sequential Monte Carlo (SMC or, more commonly, particle filtering ) for prognostic monitoring. Development and testing of the application of condition-based monitoring (CBM) techniques was performed on the Oak Ridge Mock Feed and Withdrawal (F&W) facility as a proof of principle. CBM techniques have been extensively developed for M&R assessment of physical processes, such as manufacturing and power plants. These techniques are normally used to locate and diagnose the effects of mechanical degradation of equipment to aid in planning of maintenance and repair cycles. In a safeguards environment, however, the goal is not to identify mechanical deterioration, but to detect and diagnose (and potentially predict) attempts to circumvent normal, declared facility operations, such as through protracted diversion of enriched material. The CBM techniques are first explained from the traditional perspective of maintenance and reliability engineering. The adaptation of CBM techniques to inspector monitoring is then discussed, focusing on the unique challenges of decision-based effects rather than equipment degradation effects. These techniques are then applied to the Oak Ridge Mock F&W facility a water-based physical simulation of a material feed and withdrawal process used at enrichment plants that is used to develop and test online monitoring techniques for fully information-driven safeguards of GCEPs. Advantages and limitations of the CBM approach to online monitoring are discussed, as well as the potential challenges of adapting CBM concepts to safeguards applications.

Condition-Based Monitoring↗