Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site screening”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Metrics of Balance Control for Use in Screening Tests of Vestibular Function

Decrements in balance control have been documented in astronauts after space flight. Reliable measures of balance control are needed for use in postflight field tests at remote landing sites. Diffusion analysis (DA) is a statistical mechanical tool that shows the average difference of the dependent variable on varying time scales. These techniques have been shown to measure differences in open-loop and closed-loop postural control in astronauts and elderly subjects. The goal of this study was to investigate the reliability of these measures of balance control. Eleven subjects were tested using the Clinical Test of Sensory Interaction on Balance: the subject stood with feet together and arms crossed on a stable or compliant surface, with eyes open or closed and with or without head movements in the pitch or yaw plane. Subjects were instrumented with inertial motion sensors attached to their trunk segment. The DA curves for linear acceleration measures were characterized by linear fits measuring open- (Ds) and closed-loop (Dl) control, and their intersection point (X-int, Y-int). Ds and Y-int showed significant differences between the test conditions. Additionally, Ds was correlated with the root mean square (RMS) of the signal, indicating that RMS was dominated by open-loop events (< 0.5 seconds). The Y-int was found to be correlated with the average linear velocity of trunk movements. Thus DA measures could be applied to derive reliable metrics of balance stability during field tests.

Fiedler, Matthew↗

AI-accelerated protein-ligand docking for SARS-CoV-2 is 100-fold faster with no significant change in detection

Protein-ligand docking is a computational method for identifying drug leads. The method is capable of narrowing a vast library of compounds down to a tractable size for downstream simulation or experimental testing and is widely used in drug discovery. While there has been progress in accelerating scoring of compounds with artificial intelligence, few works have bridged these successes back to the virtual screening community in terms of utility and forward-looking development. We demonstrate the power of high-speed ML models by scoring 1 billion molecules in under a day (50 k predictions per GPU seconds). We showcase a workflow for docking utilizing surrogate AI-based models as a pre-filter to a standard docking workflow. Our workflow is ten times faster at screening a library of compounds than the standard technique, with an error rate less than 0.01% of detecting the underlying best scoring 0.1% of compounds. Our analysis of the speedup explains that another order of magnitude speedup must come from model accuracy rather than computing speed. In order to drive another order of magnitude of acceleration, we share a benchmark dataset consisting of 200 million 3D complex structures and 2D structure scores across a consistent set of 13 million “in-stock” molecules over 15 receptors, or binding sites, across the SARS-CoV-2 proteome. We believe this is strong evidence for the community to begin focusing on improving the accuracy of surrogate models to improve the ability to screen massive compound libraries 100 × or even 1000 × faster than current techniques and reduce missing top hits. The technique outlined aims to be a fast drop-in replacement for docking for screening billion-scale molecular libraries.

59 BASIC BIOLOGICAL SCIENCES↗

Data-driven design of novel halide perovskite alloys

The great tunability of the properties of halide perovskites presents new opportunities for optoelectronic applications as well as significant challenges associated with exploring combinatorial chemical spaces. Here, in this work, we develop a framework powered by high-throughput computations and machine learning for the design and prediction of mixed cation halide perovskite alloys. In a chemical space of ABX 3 perovskites with a selected set of options for A, B, and X species, pseudo-cubic structures with B-site mixing are simulated using density functional theory (DFT) and several properties are computed, including stability, lattice constant, band gap, vacancy formation energy, refractive index, and optical absorption spectrum, using both semi-local and hybrid functionals. Neural networks (NN) are used to train predictive models for every property using tabulated elemental properties of A, B, and X site species as descriptors. Starting from a DFT dataset of 229 points, we use the trained NN models to predict the structural, energetic, electronic, and optical properties of an extensive dataset of 17955 compounds, and perform high-throughput screening in terms of stability, band gap, and defect tolerance, to obtain 392 promising compounds that are ranked as potential absorbers according to their photovoltaic figure of merit. Compositional trends in the screened set of attractive mixed cation halide perovskites are revealed and additional computations are performed on selected compounds. The data-driven design framework developed here is promising for designing novel mixed compositions and can be extended to a wider perovskite chemical space in terms of A, B, and X species, different kinds of mixing at the A, B, or X sites, non-cubic phases, and other properties of interest.

36 MATERIALS SCIENCE↗

STK Integrated Message Production List Editor (SIMPLE) for CEO Operations

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.

Trenchard, Mike↗

Ground state energy of electrons in a static point-ion lattice

The ground state energy of a neutral collection of protons and electrons was investigated under the assumption that in the ground state configuration, static protons occupy the sites of a rigid Bravais lattice. The Wigner-Seitz method was used in conjunction with three postulated potentials: bare Coulomb, Thomas-Fermi screening, and screening by a uniform bare background charge. Within these approximations, the exact band-minimum energy and wave functions are derived. For each of the three potentials, the approximate minimum ground state energy per proton (relative to isolated electrons and protons) is, respectively, -1.078 Ry, -1.038 Ry, and -1.052 Ry. These three minima all fall at a density of about 0.60 gm/cu cm, which is thus an approximate lower bound on the density of metallic hydrogen at its transition pressure.

Styer, D. F.↗

New applications for phosphoric acid fuel cells

New applications for phosphoric acid fuel cells were identified and evaluated. Candidates considered included all possibilities except grid connected electric utility applications, on site total energy systems, industrial cogeneration, opportunistic use of waste hydrogen, space and military applications, and applications smaller than 10 kW. Applications identified were screened, with the most promising subjected to technical and economic evaluation using a fuel cell and conventional power system data base developed in the study. The most promising applications appear to be the underground mine locomotive and the railroad locomotive. Also interesting are power for robotic submersibles and Arctic villages. The mine locomotive is particularly attractive since it is expected that the fuel cell could command a very high price and still be competitive with the conventionally used battery system. The railroad locomotive's attractiveness results from the (smaller) premium price which the fuel cell could command over the conventional diesel electric system based on its superior fuel efficiency, and on the large size of this market and the accompanying opportunities for manufacturing economy.

Stickles, R. P.↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Building 843 Corp Yard Redesign Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 843 (B843) Corp Yard Redesign project (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows the criteria established in Lawrence Livermore National Laboratory’s (LLNL’s) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on the B843 Corp Yard Redesign drawing set dated December 3, 2021.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Soil Study Institutional Review Board #1081 Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) to collect soil quality data at an area located at Lawrence Livermore National Laboratory’s (LLNL’s) Experimental Test Site, Site 300 (Site 300) (project) (Figures 1 and 2). The purpose of the project is to determine the chemical and radiological quality of soil in the project area to support feasibility and design of future improvements. This SAP identifies chemicals of concern and describes the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine the reuse potential of shallow soil at the project area. This SAP follows the criteria established in LLNL’s Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 817 Complex (project). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was developed in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

Transcriptional Regulatory Networks Involved in C3–C4 Alcohol Stress Response and Tolerance in Yeast

Alcohol toxicity significantly impacts the titer and productivity of industrially produced biofuels. To overcome this limitation, we must find and use strategies to improve stress tolerance in production strains. Previously, we developed a multiplex navigation of a global regulatory network (MINR) library that targeted 25 regulatory genes that are predicted to modify global regulation in yeast under different stress conditions. Herein, we expanded this concept to target the active sites of 47 transcriptional regulators using a saturation mutagenesis library. The 47 targeted regulators interact with more than half of all yeast genes. We then screened and selected for C3–C4 alcohol tolerance. We identified specific mutants that have resistance to isopropanol and isobutanol. Notably, the WAR1_K110N variant improved tolerance to both isopropanol and isobutanol. In addition, we investigated the mechanisms for improvement of isopropanol and isobutanol stress tolerance and found that genes related to glycolysis play a role in tolerance to isobutanol, while changes in ATP synthesis and mitochondrial respiration play a role in tolerance to both isobutanol and isopropanol. Overall, this work sheds light on basic mechanisms for isopropanol and isobutanol toxicity and demonstrates a promising strategy to improve tolerance to C3–C4 alcohols by perturbing the transcriptional regulatory network.

09 BIOMASS FUELS↗

Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Crystallographic Fragment Screening of a Bifunctional Proline Catabolic Enzyme Reveals New Inhibitor Templates for Proline Dehydrogenase and L-Glutamate-γ-semialdehyde Dehydrogenase

The proline catabolic pathway consisting of proline dehydrogenase (PRODH) and L-glutamate-γ-semialdehyde (GSAL) dehydrogenase (GSALDH) catalyzes the four-electron oxidation of L-proline to L-glutamate. Chemical probes to these enzymes are of interest for their role in cancer and inherited metabolic disease. Here, we report the results of a crystallographic fragment-screening campaign targeting both enzymes. A unique aspect of our approach is the screening of both enzymes simultaneously using crystals of the bifunctional PRODH-GSALDH enzyme, proline utilization A (PutA). A 288-fragment library from Zenobia was screened in crystallo in cocktails of six fragments. Validation X-ray crystallography with individual fragments identified seven crystal hits distributed in the PRODH active site, GSALDH aldehyde substrate-binding site, and GSALDH NAD+ adenine-binding site. The fragment bound in the PRODH active site, 4-methoxybenzyl alcohol, is structurally distinct from all known PRODH inhibitors as it lacks an anionic anchor and stabilizes open conformations of the active site, motivating the study of eighteen analogs. In total, thirteen crystal structures with resolutions ranging from 1.32 Å to 1.80 Å were determined, resolving the poses and interactions of seven fragments from the Zenobia library and five analogs of 4-methoxybenzyl alcohol. These results expand the chemical space of probes targeting proline catabolic enzymes and provide new structural information for further inhibitor development.

Biochemistry & Molecular Biology↗