Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Comparison of an Inductance In-Line Oil Debris Sensor and Magnetic Plug Oil Debris Sensor

The objective of this research was to compare the performance of an inductance in-line oil debris sensor and magnetic plug oil debris sensor when detecting transmission component health in the same system under the same operating conditions. Both sensors were installed in series in the NASA Glenn Spiral Bevel Gear Fatigue Rig during tests performed on 5 gear sets (pinion/gear) when different levels of damage occurred on the gear teeth. Results of this analysis found both the inductance in-line oil debris sensor and magnetic plug oil debris sensor have benefits and limitations when detecting gearbox component damage.

Dempsey, Paula J.↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Evaluating Impacts of the Inflation Reduction Act and Bipartisan Infrastructure Law on the U.S. Power System

The Inflation Reduction Act of 2022 (IRA) and the Infrastructure Investment and Jobs Act of 2021, commonly referred to as the 'Bipartisan Infrastructure Law (BIL),' collectively represent the largest commitment of the U.S. Federal Government to invest in the modernization and decarbonization of the U.S. energy system. The Congressional Budget Office (CBO) estimates that total support for the broad range of climate and clean energy programs, tax credits, and other incentives authorized through the two laws will exceed $430 billion from 2022 through 2031 (CRS 2022; CBO 2021, 2022). While the climate and clean energy provisions are numerous and have the potential to impact all aspects of the U.S. energy system from fuel and electricity production to final consumption in industry, transportation, and buildings, the provisions relevant to the electricity sector - in particular the suite of tax credits for clean generation, storage, and carbon dioxide ( CO 2 ) capture and storage - are expected to be some of the most consequential in terms of emissions reduction and clean energy deployment (Larsen et al. 2022; Jenkins, Mayfield, et al. 2022; Mahajan et al. 2022; Zhao et al. 2022). In this report, we detail the methods and results of a study estimating the potential impacts of key provisions of IRA and BIL on the contiguous U.S. power sector from present day through 2030. The analysis employs an advanced power system planning model, the Regional Energy Deployment System (ReEDS), to evaluate how major provisions from both laws impact investment in and operation of utility-scale generation, storage, and transmission, and, in turn, how those changes impact power system costs, emissions, and climate and health damages. While not exhaustive in capturing every provision, the analysis estimates the possible scale of power-sector impacts that could result from the modeled provisions in IRA and BIL. The study is structured around two scenarios to evaluate the potential impacts of both laws on the power sector: 1) No New Policy: A counter-factual scenario that reflects all Federal and state policies enacted as of September 2022, with exception to IRA and BIL, and assumes load growth consistent with the Energy Information Administration's Annual Energy Outlook 2022 (AEO22) Reference case (EIA 2022a); 2) IRA-BIL: A scenario reflecting all Federal and state policies enacted as of September 2022, including key IRA and BIL provisions, most notably the investment and production tax credits for zero-carbon emitting electricity generation and storage (ITC and PTC), the tax credit for CO 2 capture and storage (45Q), and the tax credit for existing nuclear plants (described further in Section 2.3). To account for the impacts of IRA and BIL on electrification, assumes increased load growth consistent with a scaled version of the Medium Electrification scenario from the Electrification Futures Study (Mai et al. 2018). These scenarios are simulated across seven sets of assumptions with varying projected future electricity market conditions, including technology costs and performance, natural gas prices, and the degree of availability, feasibility, and cost of development of renewable resources, electricity transmission, and CO 2 pipeline, injection, and storage infrastructure. In addition, we simulate two sensitivities on the 'policy' treatment in which we vary key assumptions pertaining to the realized value of the clean electricity ITC and PTC: 1) the cost of monetization of tax credits, and 2) the level of bonus crediting realized by project developers. We demonstrate that IRA and BIL have the collective potential to drive substantial growth in clean electricity by 2030, while reducing costs for consumers, mitigating climate change, and decreasing the human health impacts of power sector emissions. However, we also demonstrate that if expected cost improvements of clean technologies are not realized and/or constraints on deployment driven by factors such as supply-chain challenges, regulatory hurdles, and the social acceptability of energy infrastructure development limit the rate of clean energy and associated infrastructure deployment (such as transmission), then the share of clean generation achieved and the associated emissions benefits realized may be substantively reduced.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GPS-Like Phasing Control of the Space Solar Power System Transmission Array

The problem of phasing of the Space Solar Power System's transmission array has been addressed by developing a GPS-like radio navigation system. The goal of this system is to provide power transmission phasing control for each node of the array that causes the power signals to add constructively at the ground reception station. The phasing control system operates in a distributed manner, which makes it practical to implement. A leader node and two radio navigation beacons are used to control the power transmission phasing of multiple follower nodes. The necessary one-way communications to the follower nodes are implemented using the RF beacon signals. The phasing control system uses differential carrier phase relative navigation/timing techniques. A special feature of the system is an integer ambiguity resolution procedure that periodically resolves carrier phase cycle count ambiguities via encoding of pseudo-random number codes on the power transmission signals. The system is capable of achieving phasing accuracies on the order of 3 mm down to 0.4 mm depending on whether the radio navigation beacons operate in the L or C bands.

Psiaki, Mark L.↗

Transmission-distribution long-term volt-var planning considering reactive power support capability of distributed PV

High penetration of grid-edge, inverter-based photovoltaic (PV) can cause significant voltage fluctuations not only at the distribution but also at the sub-transmission levels due to PV output intermittency. Traditional reactive power planning approaches do not consider intermittency, nor the possibility of coordinating the control of existing and future volt-ampere reactive resources. This paper proposes a reactive power planning tool for sub-transmission systems to mitigate voltage violations and fluctuations caused by high PV penetration and intermittency with a minimum investment cost. The planning tool coordinates with an optimization-based volt-var operational tool for: a) modeling the coordination of all existing var assets in both sub-transmission and distribution systems to reduce the need of new equipment, and b)selecting a set of scenarios with voltage violations, derived from PV intermittency c) testing the final investment decision. The tool obtains an investment need for each intermittency scenario with a proposed optimal power-flow framework with efficient techniques to handle a high number of discrete variables. Two options are provided for final planning decision: i) a conservative direct combination of investment need solutions and ii) a machine learning-based selection of representative investment needs at most time steps. The final investment decision options are verified using a realistic large-scale sub-transmission system and 5-minute PV and load data. The results show a significant voltage performance improvement with a lower investment cost for additional var equipment compared to conventional approaches.

14 SOLAR ENERGY↗

Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

storms↗

Advanced Communications Technology Satellite Now Operating in an Inclined Orbit

The Advanced Communications Technology Satellite (ACTS) system has been modified to support operation in an inclined orbit that is virtually transparent to users, and plans are to continue this final phase of its operation through September 2000. The next 2 years of ACTS will provide a new opportunity for using the technologies that this system brought online over 5 years ago and that are still being used to resolve the technical issues that face NASA and the satellite industry in the area of seamless networking and interoperability with terrestrial systems. New goals for ACTS have been defined that align the program with recent changes in NASA and industry. ACTS will be used as a testbed to: Show how NASA and other Government agencies can use commercial systems for 1. future support of their operations Test, characterize, and resolve technical issues in using advanced communications 2. protocols such as asynchronous transfer mode (ATM) and transmission control protocol/Internet protocol (TCP/IP) over long latency links as found when interoperating satellites with terrestrial systems Evaluate narrow-spot-beam Ka-band satellite operation in an inclined orbit 3. Verify Ka-band satellite technologies since no other Ka-band system is yet 4. available in the United States

Bauer, Robert A.↗

Data compression/error correction digital test system. Appendix 2: Theory of operation

An overall block diagram of the DC/EC digital system test is shown. The system is divided into two major units: the transmitter and the receiver. In operation, the transmitter and receiver are connected only by a real or simulated transmission link. The system inputs consist of: (1) standard format TV video, (2) two channels of analog voice, and (3) one serial PCM bit stream.

Source record↗

Machine Learning in Power System Operations: Training Data

Reliability and stability of the electric grid today has depended upon operations of the grid which include the protective relay. Today, the electricity sector faces new challenges with the shift of generation resource characteristics away from the traditional “big iron” generation to inverter-based resources (IBR) which shift the physics and assumption used in grid operation and protection. These changing conditions represent new challenges for protective relays (identification of faults) and increased challenges for protection engineers (correct settings and configuration, reduction of mis-operations), both issues recognized in research and industry. Finding new approaches to reduce mis-operations in relaying and new approaches to fault identification is critical to grid operations. Using today’s modern technology of embedded systems, edge computing, machine learning (ML), and communications we can help address challenges and augment and improve on existing power system operations methodologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-temperature microphone system

Pressure fluctuations in air or other gases in an area of elevated temperature are measured using a condenser microphone located in the area of elevated temperature and electronics for processing changes in the microphone capacitance located outside the area the area and connected to the microphone by means of high-temperature cable assembly. The microphone includes apparatus for decreasing the undesirable change in microphone sensitivity at high temperatures. The high temperature cable assembly operates as a half-wavelength transmission line in an AM carrier system and maintains a large temperature gradient between the two ends of the cable assembly. The processing electronics utilizes a voltage controlled oscillator for automatic tuning thereby increasing the sensitivity of the measuring apparatus.

Zuckerwar, A. J.↗

A role for high frequency superconducting devices in free space power transmission systems

Major advances in space power technology are being made in photovoltaic, solar thermal, and nuclear systems. Despite these advances, the power systems required by the energy and power intensive mission of the future will be massive due to the large collecting surfaces, large thermal management systems, and heavy shielding. Reducing this mass on board the space vehicle can result in significant benefits because of the high cost of transporting and moving mass about in space. An approach to this problem is beaming the power from a point where the massiveness of the power plant is not such a major concern. The viability of such an approach was already investigated. Efficient microwave power beam transmission at 2.45 GHz was demonstrated over short range. Higher frequencies are desired for efficient transmission over several hundred or thousand kilometers in space. Superconducting DC-RF conversion as well as RF-DC conversion offers exciting possibilities. Multivoltage power conditioning for multicavity high power RF tubes could be eliminated since only low voltages are required for Josephson junctions. Small, high efficiency receivers may be possible using the reverse Josephson effects. A conceptual receiving antenna design using superconducting devices to determine possible system operating efficiency is assessed. If realized, these preliminary assessments indicate a role for superconducting devices in millimeter and submillimeter free space power transmission systems.

Christian, Jose L., Jr.↗

Demand Response Optimization and Management System for Real-TIme (DROMS-RT)

To design and demonstrate DROMS-RT, a highly distributed Demand Response Optimization and Management System for Real-Time (DROMS-RT) power flow control to support large scale integration of distributed renewable generation into the grid. AutoGrid developed a novel control and communications platform to allow highly dispatchable demand response (DR) services in time frames suitable for providing ancillary services to the transmission grid. These services will be substantially less expensive and more efficient than other forms of ancillary services options currently available to manage the intermittency associated with large-scale renewable integration. DROMSRT successfully leveraged Automated Demand Response (ADR) by fundamentally re-thinking the architecture of the DR platform from the ground up and by developing innovative new technologies in a number of areas related to DR. DROMS-RT leveraged the low-cost, open, interoperable DR signaling technology, OpenADR, and low-cost, internet-protocol based telemetry solutions to reduce the cost of hardware. This allowed DROMS-RT to provide dynamic price signals to millions of OpenADR clients. Statistically rigorous signal processing techniques were developed to reliably detect even small load reductions in the presence of noisy baseline profiles. Novel forecasting engines based on modern online machine learning algorithms enabled accurate individualized forecasts for customer loads in the presence of dynamic pricing signals, and a real-time decision engines enabled continuous optimization and optimal dispatch of DR resources across a large portfolio of heterogeneous loads that respond at varying time-scales. Moreover, the real-time optimization conducted by the decision engine can utilize grid physics to maximize load reduction at the transmission system in addition to the distribution sites, for more efficient grid operation. Finally, the Software-as-a-Service (SaaS) availability of the DROMS-RT platform has reduced the cost of deployment and enable participation of small commercial and residential customers in DR who otherwise would not be able to do so.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter Ten - Power, Buildings, and Other Critical Networks: Integrated Multisystem Operation

The electrifying transportation sector, the increasing grid interactivity of the built environment, the rapidly expanding number of devices within the Internet-of-Things, and the overall trend toward highly connected systems and interdependent networks is revolutionizing the operation of the electric power grid. While these changes are presenting grid operators with new challenges to ensure an efficient, reliable, and sustainable operation of the grid, they also enable a new suite of resources that can be utilized for assisting the grid in times of need. In this chapter, we explore how these recent changes and trends are affecting modern power systems and discuss the benefits and challenges of an increasingly electrified and interconnected world. We will observe how various critical infrastructure, that is, buildings, water and gas, transportation, and telecommunication networks are highly dependent on power network operations but, with improved coordination and control, can also provide valuable assets to the grid in times of need.

electricity markets↗

Development of an accurate transmission line fault locator using the global positioning system satellites

A highly accurate transmission line fault locator based on the traveling-wave principle was developed and successfully operated within B.C. Hydro. A transmission line fault produces a fast-risetime traveling wave at the fault point which propagates along the transmission line. This fault locator system consists of traveling wave detectors located at key substations which detect and time tag the leading edge of the fault-generated traveling wave as if passes through. A master station gathers the time-tagged information from the remote detectors and determines the location of the fault. Precise time is a key element to the success of this system. This fault locator system derives its timing from the Global Positioning System (GPS) satellites. System tests confirmed the accuracy of locating faults to within the design objective of +/-300 meters.

Lee, Harry↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

An Analysis of Post Attack Impacts and Effects of Learning Parameters on Vulnerability Assessment of Power Grid

Due to the increasing number of heterogeneous devices connected to electric power grid, the attack surface increases the threat actors. Game theory and machine learning are being used to study the power system failures caused by external manipulation. Most of existing works in the literature focus on one-shot process of attacks and fail to show the dynamic evolution of the defense strategy. In this paper, we focus on an adversarial multistage sequential game between the adversaries of the smart electric power transmission and distribution system. We study the impact of exploration rate and convergence of the attack strategies (sequences of action that creates large scale blackout based on the system capacity) based on the reinforcement learning approach. We also illustrate how the learned attack actions disrupt the normal operation of the grid by creating transmission line outages, bus voltage violations, and generation loss. This simulation studies are conducted on IEEE 9 and 39 bus systems. The results show the improvement of the defense strategy through the learning process. The results also prove the feasibility of the learned attack actions by replicating the disturbances created in simulated power system.

attack impacts↗

Cybersecurity for System Operators

SERC's System Operator Conference is an annual education and sustainment training for electric power system operators across the southeastern United States. In recognition of the growing importance of cybersecurity for energy systems, a block of instruction on cybersecurity concepts was included for this year's conferences. This presentation provides an overview of the need for and general approach used in the DOE CESER-sponsored Cybersecurity for the Operational Technology Environment (CyOTE) program, tailored for electric power system operators. NERC's updated Cyber Intrusion Guide for System Operators is reviewed, explaining how it is an operationalization of some of CyOTE's principles and approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗