Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Flex-PCB Quench Antenna Developments at FNAL

We report flexible printed-circuit-board-based quench antenna arrays have been developed at FNAL since 2017. They proved to be low-noise, low-cost, sensitive, and non-invasive sensors for quench characterization in superconducting magnets, having the potential to extend even to quench detection. Starting with applications of small area sensors of this type, we have explored feasibility for operations at high pressure, and have invested in multi-channel quench antenna arrays covering the complete area of the innermost magnet layer of the conductor. We've also tested and optimized sensor geometry and relative orientations to increase sensitivity and spatial resolution. Beyond developments of warm and cold bore antennas, we've progressed to concepts which attach quench antennas to the conductor surfaces of accelerator magnets. Multiple programs and projects at FNAL and collaborating institutions benefited from this work already and our plans target further extensions of capabilities and applicability of these devices. In this paper we present the logic behind the development steps taken so far, status of our work and direction of near-term research on quench antennas at Fermilab.

43 PARTICLE ACCELERATORS↗

Bubble Mass Transport Measurement in the Large-Scale Test Loops at Oak Ridge National Laboratory

Molten salts are complex fluids that incorporate multi-phase behavior depending on the chemistry and the physical properties of the entrained components. These components include the carrier salt, the actinide fuel, and fission, activation, and corrosion products, the concentrations of which depends on the burnup history of the salt. Radionuclide transport from the salt into the cover gas / off-gas system depends on volatility as predicted by thermochemistry, but data from the Molten Salt Reactor Experiment (MSRE) conducted in the late 1960s suggest that bubble formation and transport are also important. Anomalously high fractions of noble metals were found in the off-gas system and were attributed to transportation with parent salt aerosols and their association with rising noble gas bubbles. The prediction of such phenomena requires coupled neutronic, thermal hydraulic, and chemical equilibrium calculations, the framework of which is being developed within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program supported by the US Department of Energy (DOE) Office of Nuclear Energy (NE). However, separate effects tests and models of experiments using tools such as SAM and Thermochimica can guide model developers through important processes. Conversely, model development guides the choice of experiments and systems to provide data that are relevant for validation. This report describes several experiments that tracked gas transport in molten salts, ranging from small-scale systems to large-scale loops. Gas transportation in a molten salt, LiCl-KCl, has been studied using the shadowgraph technique. Sensors such as residual gas analysis, Raman spectroscopy, and laser-induced breakdown spectroscopy have been tested for off-gas measurements. These data were used to interpret how the gases move through the upstream salt / cover gas and the interface between them. Differential pressure measurements were able to detect individual gas bubbles as they popped at the liquid–gas interface. Salt aerosols were collected on a cascade impactor. Their formation was also observed directly via the shadowgraph method, and most of these aerosols were launched ballistically into the cover gas. Fine mists could also be observed. Convection currents through the salt were visualized and can be used to calculate the thermophysical properties of the salt itself. The apparatuses described in this report and in a previous work (McFarlane et al. 2023) have been commissioned and are available for use in making further measurements of salt/surrogate fission product behavior. Novel approaches using neutron imaging are planned for the study of fluoride salts, which cannot be contained in quartz, so shadowgraph visualization is not available. Bubble transport in convective flow and in a slow-moving salt column are planned. The mobile laser-induced breakdown spectroscopy (LIBS) system is available for several applications, including iodine capture in a molten hydroxide scrubber, H2 transport though molten salts to complement Raman analysis, and online tracking of salt aerosol generation, transport, and deposition. This report summarizes the findings from FY24 and the plans for FY25. The work completes milestone M2AT-24OR0702013 of the DOE-NE Advanced Reactor Technology, Molten Salt Reactor Campaign, DOE-NE-5.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Powering the Future: Fusion & Plasmas

This report provides a decade-long vision for the field of fusion energy and plasma science and presents a path to a promising future of new scientific discoveries, industrial applications, and, ultimately, the delivery of fusion energy. We identify critical areas for research and development and prioritize investments to maximize impact. The research community worked for more than a year to develop a wealth of creative ideas designed to accelerate fusion energy and advance plasma science. The effort culminated in the consensus Community Planning Process report. Our work is based heavily on that report, and we extend our sincere gratitude to our colleagues for their efforts. Following the research community’s lead, we worked through consensus to generate this report. Many ideas were heard and were thoughtfully deliberated until a shared view on each issue emerged. This process allowed us to discuss and appreciate our different points of view and come to consensus language. Ultimately, we speak with one voice in conveying a vision for a vibrant program that will bring significant benefit to society.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Status Update: Deposition Modeling For SNF Canister CISCC

This report fulfills the M3 milestones M3SF-21PN010207025 & M3SF-20PN0102070412. During fiscal year (FY) 2020, Pacific Northwest National Laboratory (PNNL) worked to further develop the FY 2019 deposition and particle tracking models. This status report outlines these efforts and presents the progress made so far. Model development work is ongoing and is planned to continue in FY 2021. The FY 2020 model development included work on: Wind Effects. Model development and sensitivity studies, investigated how wind direction and speed affect deposition; Brownian Motion. Implementing Brownian Motion into existing models; Particle Size Variability. Depending on the particle composition, the diameter of the particle may vary with changes in relative humidity. Models were developed to analyze this; Multiphase and Fluid Film Modeling. Investigating canister surface wetting and drying, and how this effects overall deposition. Models were developed to analyze this; Difusophoresis. Performing initial work to implement diffusiophoresis into the existing models; Turbophoresis. Performing initial work to implement turbophoresis into the existing models. Much of this work will continue into FY21. The authors present initial results and discus current and future work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ASPIRES: Airport Shuttle Planning and Improved Routing Event-driven Simulation

Most of the existing traffic simulation packages require significant calibration work to be able to reflect reality. To evaluate special operations including emerging technologies, a microscopic simulation that tracks detailed interactions of all the elements of the traffic systems is usually needed. This type of simulation is usually computationally demanding. This work developed an Airport Shuttle Planning and Improved Routing Event-driven Simulation (ASPIRES) package to simulate and evaluate current, potential, and future airport shuttle operations. Here, the simulation was driven by data and thus did not require much calibration effort. The discrete-event simulation nature of ASPIRES makes the simulation computationally efficient. Simulating 1 day of shuttle operations takes less than 2s. The study site of this work is the Dallas/Fort Worth International Airport in the U.S. The shuttle service that connects the five terminals of the airport and the rental car center was studied. Travel times, dwell times, and passenger arrivals were simulated using empirical distributions derived mainly from real data to capture the stochastic nature of the rental car center shuttle bus operations. Data on bus miles traveled, bus energy consumption, passenger wait times, and passengers left behind at stops were collected to study the trade-off between energy use and passenger experience. Electric bus and on-demand bus operations were also included. The simulation outputs can show passengers statistics at terminals, shuttles statistics, and charging station statistics. ASPIRES cannot be used to model a generic traffic system but is well-suited for fleet systems.

33 ADVANCED PROPULSION SYSTEMS↗

30 cm Drop Modeling

This report documents modeling and analysis of the 30 cm cask drop scenario for spent nuclear fuel (SNF) casks. The 30 cm drop is an important hypothetical dynamic loading scenario for SNF because 10 CFR 71.71 defines testing requirements for normal conditions of transport (NCT) of SNF packages, and free drop (of 30 cm for the heaviest packages) tests are required. Other NCT conditions specified in 10 CFR 71.71 include vibration normally incident to transport, and DOE’s multimodal transportation test (MMTT) and related analysis concluded that mechanical shock and vibration incident to transportation is negligible for SNF structural integrity because the loads are so small. The SNF cask 30 cm drop has a lot more potential to cause damage to SNF because the kinetic energy and momentum of the system is stopped abruptly during the cask impact event. Test data and model predictions both agree that the SNF assemblies are subjected to significantly higher loads in a cask drop event than normal transportation shock and vibration, but currently there is no reason to expect gross structural damage of the fuel assembly or widespread SNF cladding failure as a result of a 30 cm cask drop. The ultimate goal of this work is to close the knowledge gap of stress profiles on SNF rods and fuel assembly components during NCT, and this report describes the progress toward reaching that goal as well as a plan for finishing this work over the next year or two. Key remaining tasks include refining the fuel assembly model, calculating a selection of specific fuel assembly cases to populate the damage model, and finally running the damage model to predict the full general response range of 30 cm drop loads on SNF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Energy Management Software System for Small Commercial Buildings in Support of Decarbonization (Abstract)

The primary goal for the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage vast experience of Pacific Northwest National Laboratory (PNNL) research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation LLC who plans to use it to scale their building energy efficiency offering. The project plan will include collaboratively working with Intellimation to package a set of solutions into the AEMS system, validate and demonstrate their capability, and value proposition through field demonstrations. If the deployment of the AEMS system optimizes RTUs’ set points, schedules, setbacks and optimal start and results in energy consumption reduction of 20%, the technical potential savings is approximately 675 trillion Btus of site energy savings and 2,000 trillion Btus of source energy. It will also result in carbon reductions of approximately 2.4 MMTCO2 and contribute to the climate change mitigation plans of many cities and states across the United States. Additional cost savings and emissions reduction are possible from management of peak electricity demand. The primary outcome will be an AEMS system that can be deployed at scale on small commercial buildings to improve operating efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report of the 2021 U.S. Community Study on the Future of Particle Physics (Snowmass 2021)

In 2019, with the construction of the projects supported by the 2014 P5 process well underway or in an advanced stage of planning, the Division of Particle and Fields (DPF) of the American Physical Society (APS) began to prepare a new community study of U.S. high energy physics (HEP) for the decade of 2025 – 2035, and beyond. This “Snowmass 2021” HEP Community Planning Exercise began formally with a kick-off meeting at the 2020 APS April Meeting and a Community-wide Planning Meeting in October of 2020. The exercise was to conclude in July of 2021 with a workshop in Seattle hosted by the University of Washington. The COVID-19 pandemic severely disrupted these plans. Work was paused from January to September of 2021 to lighten the burden on our younger scientists. We resumed work by September of 2021 and, despite the continuing challenges of COVID-19, our community was well prepared for the Seattle meeting, which had been rescheduled for July 17–26, 2022.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

DOE Data Days (Q2 FY2022 Report)

During the FY22Q2 the DOE Data Days planning committee continued to work on the workshop agenda. The following are high-level accomplishments: • Selected four themes for poster and oral presentations to cover in the DOE Data Workshop • Developed a list of potential invited speakers, 1 per theme with an alternate as well • Adapted existing plans to accommodate a hybrid workshop instead of virtual including booking location • Sent out Save The Dates for the workshop • Sent out Call for Abstracts that are currently open.

97 MATHEMATICS AND COMPUTING↗

Melter Tests to Define LAW Halide Concentrations, Phase 2

The present work represents the second of two phases to address the formation of secondary sulfate phases while processing high waste loading LAW formulations with elevated halide, chromium, and phosphate feed concentrations over a wide range of LAW waste types, including those with high potassium concentrations. The Test Plan for the present work outlines a series of tests designed to assess the formation of secondary phases over a range of sulfur and halide concentrations for two LAW streams and associated glass formulations as well as crucible testing to identify additives that have the potential to suppress the formation of secondary phases for wastes with high chlorine contents. The combined results from both phases of testing and from previous tests with these LAW waste streams will be used as inputs to future work to develop concentration limits for these components in the LAW glass property composition models and to support the modification and updating of the current WTP LAW glass formulation algorithm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING↗

Monitoring, Reporting, and Verification Plan (MRV)- Meeting EPA Guidelines for GHGRP and Subpart RR

This report summarizes the process and work completed to develop and successfully submit an MRV plan to EPA. This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the Niagaran reefs, successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan currently encompasses 10 reefs and also provides a reporting plan for future reef development.

accounting↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gamma Spectrometry Code Rodeo for Uranium Enrichment—FY 2021 Report

In FY22, the participating Department of Energy (DOE) laboratories continued the work on the project “Gamma Spectrometry Code Rodeo for Uranium Enrichment”. Oak Ridge National Laboratory (ORNL) and Lawrence Livermore National Laboratory (LLNL) continued their efforts to acquire spectra using uranium sources. A collimator (with side and back shields) was custom designed and constructed at ORNL. Spectra were acquired at ORNL using the uranium enrichment standards supplied by New Brunswick Laboratory (NBL) and the collimated M400 detector. Spectra were also acquired using steel absorbers of different thickness placed between the source and the collimated M400 detector. The plan was to ship the collimator to LLNL so that spectra could be acquired using the LLNL detector in collimated geometries. This activity was suspended since problems were noticed with the performance of the LLNL M400 detector. Also, it was brought to light to the project team that some of the aspects of the M400 detector had been updated by the vendor H3D in response to requests by the IAEA. In February 2021, the ORNL and LLNL M400 detectors were returned to the H3D factory in order to resolve the problems with the LLNL detector and to update ORNL and LLNL detectors to the same configuration as the M400 supplied to the IAEA. H3D repaired the LLNL M400 and performed the IAEA updates on both the ORNL and LLNL detectors. ORNL and LLNL received the detectors in April 2021. Data acquisition was continued using the upgraded detectors. ORNL re-collected the spectra using point sources and the NBL standards in uncollimated and collimated geometries. The collimator was shipped from ORNL to LLNL. Spectra were acquired at LLNL through Q4 of FY22. When the ORNL spectra were examined closely, it became apparent that there were spurious artifacts present in some of the spectra. This rendered suspect the ORNL spectra collected in June/July 2021 time frame. ORNL contacted H3D and per H3D’s advice, the M400 detector was returned to H3D for repairs in mid-August 2021. H3D diagnosed the problem and established that the root cause was the extra tight packaging that created a strain on the CZT crystals, causing one of them to break down. The repaired M400 was returned to ORNL in early September 2021. ORNL re-started data acquisition for the third time. Data was continued to be acquired at ORNL and LLNL through September 2021. The ORNL and LLNL data will be shared with the principal investigators from the analyzing laboratories. The GADRAS code and FRAM have been developed to have the capability to analyze the M400 spectra. Good quality spectra from FY21 have been analyzed using modified versions of GADRAS and FRAM. The spectra have also been analyzed using the GEM code. The analysis results from GADRAS, FRAM and GEM codes are presented and discussed in this report. Some preliminary results from FRAM and GEM analysis were presented in February 2021 at the U-Pu Isotopics Workshop sponsored by the IAEA. CZTU code is being modified to analyze M400 spectra. Data collection, code development and analysis will be continued in FY22 as per the FY22 Project Work Plan (PWP).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗