At least 235 records · Page 13

Knowledge Spillovers and Cost Reductions in Solar Soft Costs

Despite the commonly acknowledged importance of knowledge spillovers in reducing solar soft costs, we are only beginning to answer a fundamental question: who learns what (knowledge acquisition), from whom (knowledge production), and how (spillover mechanisms)? Until recently, this important topic has been largely unexplored in the case of solar soft costs. Thus, this project set out to identify how knowledge spillovers affect soft costs in the U.S. photovoltaic (PV) installation industry, specifically how important spillovers are, what types of knowledge are most likely to spillover, and how networks of actors affect spillovers. Our findings offer insights for designing solutions that address problems associated with knowledge spillovers and that leverage spillovers to reduce solar soft costs. Recognizing the ambiguity in the definition of soft costs, i.e., “non-hardware costs,” and variability in soft cost categories, we developed the Solar Soft Cost Ontology (SSCO) to systematically identify key concepts related to soft costs, network actors, learning processes, and the relationships between them. This ontology served as a foundational organizational structure for the methodology of the remaining tasks: case studies, surveys, pricing analysis, patent analysis, network analysis, and project integration across tasks. While there is substantial learning among installers that is reducing the soft costs for PV installations, most of that learning is retained by firms rather than spread across the industry. The positive relationship between experience accumulation and cost reductions is typically explained as learning by doing (LBD), but we find that LBD effects are mediated by other learning mechanisms, including learning by searching and learning by interacting. Knowledge spillovers have significant potential to reduce solar PV soft costs, but successful knowledge spillover pathways are complex and non-trivial. There are a wide variety of ways to construct an installation business, thus categories of firms that can effectively cross-learn directly are small and what knowledge is relevant to whom is challenging and costly for firms to assess. This fragmentation limits the critical mass needed for spillover related soft cost reductions. Knowledge does not flow directly between installers. Indirect knowledge transfer pathways are critical: distributors, software providers, collaboratives, and hiring. Furthermore, diverse, more integrated knowledge networks tend to promote successful learning by organizations and across the system as a whole. Accordingly, we find the need to supporting the whole ecosystem using an integrated policy and programmatic approach to support installers, distributors, complementary sector, and facilitators. Overall, a deliberate policy-mix design is needed to reduce the solar PV deployment barrier in terms of installation cost reductions, because deployment policies could potentially interact with policies that facilitate network-building and technological innovation. A combination of deployment policies, innovation-support policies, and network-facilitating policies could potentially lead to a more desired market outcome through achieving higher joint learning rates from firms’ cumulative experiences developed in a more integrated production and deployment ecosystem.

14 SOLAR ENERGY↗

Establishing a Baseline for Global Geothermal Drilling Rates

Geothermal is a promising source of renewable energy with almost zero emissions. However, there remains untapped geothermal potential around the world. This is largely because geothermal projects have high development costs and high resource-value uncertainty, and returns on initial investments can be slow to materialize. Increasing drilling efficiency of geothermal wells is one way to decrease development costs, as drilling accounts for up to 50% of the upfront costs of a geothermal power project. Currently, little quantitative information exists about how fast geothermal drilling occurs on a global scale. This paper was originally intended to be an extension of Frone and Boyd's 2018 report on geothermal drilling rates in California and Nevada. Our project includes global data and considers additional measures, such as flat time. Data for the project was limited to published papers and drilling reports that are publicly available online. The goal of our project was to establish a baseline geothermal drilling rate that is representative of current global geothermal drilling practices can be used to gauge the impact of future improvements in geothermal drilling technology. We recorded the number of days from beginning to end of a project, the number of days spent drilling, and the number of days considered to be flat time. We found the average global rate at which a drilling project is completed (including non-drilling activities) to be 160 ft/day, and the average drilling rate (including only time during which active drilling occurred) to be 360 ft/day. Our data shows no clear trend in rate change from 2000 to 2017 and significant variability in drilling rates between countries and within countries.

baseline↗

GSA Oklahoma City Federal Building: Smart Buildings Case Study

The purpose of this smart buildings case study is to showcase a leading example of a GEB renovation project in the federal buildings space and provide key information on the project roles, processes, costs, and benefits. The findings from this successful GEB project can be used to help pave the way for additional GEB-ready retrofits in the future. The General Services Administration’s (GSA’s) Oklahoma City (OKC) Federal Building, located in downtown Oklahoma City, Oklahoma, demonstrates that GEB-ready strategies and technologies can be realistically deployed today across buildings with minimal investment. The project team implemented nine energy conservation measures (ECMs) and/or smart building technologies, making it a leading example of a smart, sustainable, and efficient commercial building. The case study highlights the challenges and the lessons learned throughout the project design and execution in addition to some of the best practices and considerations when implementing GEB technologies.

Butrico, Mark↗

Electrical Infrastructure Cost Model for Marine Energy Systems

The National Renewable Energy Laboratory's Electrical Infrastructure Cost Model is an Excel-based tool designed to estimate the electrical infrastructure costs of marine energy components and subsystems. It incorporates data collected from offshore wind projects, utility projects, and other relevant sources to provide accurate and comprehensive cost projections. With its user-friendly interface, the model allows users to input various parameters related to the system array, electrical cables, and substations. By leveraging industry data, cost trends, and technological advancements, the model generates outputs that include system array sizing, electrical cable specifications and costs, substation specifications and costs, and total electrical infrastructure costs. One of the notable strengths of the model is its flexibility in covering multiple-orders-of-magnitude scaled systems, accommodating projects ranging from proof-of-concept or pilot-scale installations to large-scale offshore systems. By collecting data largely from offshore wind reports and utility projects, the model incorporates real-world conditions and accounts for industry-specific factors. It incorporates cost trends and sizing relationships to deliver cost estimations for electrical infrastructure components, such as electrical cables and substation equipment.

16 TIDAL AND WAVE POWER↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

First-Principles Cost Analysis of Advanced High-Temperature Nuclear Plants

Due to the vast number of recent nuclear reactor innovations, particularly those pertaining to generation IV reactor types like high-temperature gas cooled reactors (HTGRs) and sodium-cooled fast reactors (SFRs), and the newer deployment strategies envisioned, such as use of small modular reactors (SMRs) or even microreactors, reliable, detailed, and complete costs of these nuclear innovations are needed in wide availability. The types of models that generally achieve these objectives are those incorporating the fundamental nature of the real-world systems they aspire to predict, such as first-principles models. Furthermore, first principles models typically offer predictiveness that is not attained by most other types of individual-models. However, detailed, first-principles cost modeling of nuclear reactors and entire nuclear plants is relatively limited. To address this limitation in the availability of detailed, predictive models based on fundamentals, we recently developed a range of cost models, mostly based on first-principles methodologies, to project full lifecycle costs (LCCs) of nuclear power plants (NPPs) based on multiple parallel SM-HTG-pebble bed reactors (PBRs) and SM-SFRs.

Prosser, Jacob H. [Strategic Analysis, Inc., Arlin↗

First-Principles Cost Analysis of Advanced High-Temperature Nuclear Plants

Due to the vast number of recent nuclear reactor innovations, particularly those pertaining to generation IV reactor types like high-temperature gas cooled reactors (HTGRs) and sodium-cooled fast reactors (SFRs), and the newer deployment strategies envisioned, such as use of small modular reactors (SMRs) or even microreactors, reliable, detailed, and complete costs of these nuclear innovations are needed in wide availability. The types of models that generally achieve these objectives are those incorporating the fundamental nature of the real-world systems they aspire to predict, such as first-principles models. Furthermore, first principles models typically offer predictiveness that is not attained by most other types of individual-models. However, detailed, first-principles cost modeling of nuclear reactors and entire nuclear plants is relatively limited. To address this limitation in the availability of detailed, predictive models based on fundamentals, we recently developed a range of cost models, mostly based on first-principles methodologies, to project full lifecycle costs (LCCs) of nuclear power plants (NPPs) based on multiple parallel SM-HTG-pebble bed reactors (PBRs) and SM-SFRs.

Prosser, Jacob H. [Strategic Analysis, Inc., Arlin↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

AC and DC Hybrid Distribution Grids with Solar Integration: Architecture, Stabilization and Cost Assessment

In this project, a holistic analysis of architecture, stabilization, and cost/efficiency analysis in hybrid AC and DC distribution grids are conducted. Particularly, versatile and cost-efficient multiport converters are developed to not only integrate solar sources and other DERs in DC grids, but also facilitate the interactive operation of DC sub-grids and conventional AC distribution grids. Meanwhile, a universal and extended impedance-based stabilization approach with a decentralized and adaptive virtual impedance loop is developed in hybrid AC and DC distribution grids, which comprehensively covers the active stabilization of DC sections, AC sections, and interface inverters interlinking both AC and DC sections. Furthermore, to quantitatively evaluate the cost and efficiency of hybrid AC and DC distribution grids and quantify the improvement of hybrid AC and DC grids over conventional pure AC grids, the project team develops an alpha-version tool to monitor and calculate the efficiency and cost of the DC, AC, or hybrid AC and DC grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

2019 Energy Storage Pricing Survey

Since grid energy storage is still evolving rapidly, it is often difficult to obtain project specific capital costs for various energy storage technologies. This information is necessary to evaluate the profitability of the facility, as well as comparing different energy storage technology options. The goal of this report is to summarize energy storage capital costs that were obtained from industry pricing surveys. The methodology breaks down the cost of an energy storage system into the following component categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. By evaluating each of the different component costs separately, a synthetic system cost can be developed that provides internal pricing consistency between different project sizes using the same technology, as well as between different technologies that utilize similar components.

25 ENERGY STORAGE↗

Low-Cost, High-Performance Carbon Fiber for Compressed Natural Gas Storage Tanks (Final Technical Report – Down Select Report)

The aim of this project is to reduce the cost of Type IV, carbon fiber (CF) composite overwrap compressed gas storage tanks by reducing the cost of CF and CF composites. The project team worked to reduce the cost of CF by exploring and testing opportunities for a low-cost alternative precursor material for CF production to supplant market-dominant and costly polyacrylonitrile (PAN). Concurrently, the team aimed to reduce the cost of the tanks at the composite level by improving the interfacial adhesion between the fibers and the matrix resin through the incorporation of low-cost nanoparticles recycled from waste materials, which would reduce the volume of costly CF required to achieve the same tank performance. At the end of the first year, the project team selected mesophase pitch as the primary precursor candidate from a field of materials based on the superior mechanical performance and cost-saving potential. During the second year, the team produced CFs derived from mesophase pitch achieving an average tensile strength of 365.6 ksi and average tensile modulus of 40.74 Msi. Facility availability for spinning and converting these fibers at greater scale has hindered scale-up demonstration, but the team has identified opportunities to conduct this work in the near term. Cost modeling shows that these mesophase pitch-derived CFs can be up to 40% less expensive than PAN-derived CFs due to the lower cost of the feedstock material, higher throughput, greater conversion yield, and lower cost spinning method and compared to PAN. Additionally, the team has demonstrated at lab-scale that nanoparticle coating CFs can significantly increase the interfacial shear strength and load transfer efficiency of CFs in a matrix. Single filament pull-out testing showed a 27% average increase in max interfacial shear strength due to this coating. A continuous method of applying these coatings to a tow of CF has been developed for scale-up. 26 m tows of coated CFs were produced using this system and formed into composite ring samples for ASTM ring burst testing. Issues with the testing protocol have limited assessment of these results. A prototype Type IV tank was designed to meet ANSI HGV2 standards, and the design criteria set out by DOE, using the CF properties developed by the team paired with a proprietary resin matrix, a polyamide liner, and aluminum end bosses. The tank weighs 153.1 kg and with a total capacity of 5.8 kg H2 (5.6 kg usable), which yields a gravimetric capacity of 1.17 kWh/kg. Cost modeling predicts that the tank will have a projected cost of $15.73/kWh. Tank performance modeling does not include considerations for fiber-matrix load transfer efficiency improvements offered by nanoparticle coating method.

08 HYDROGEN↗

Energy Storage Financing: Project and Portfolio Valuation

This study investigates the issues and challenges surrounding energy storage project and portfolio valuation and provide insights in to improving visibility into the process for developers, capital providers, and customers so they can make more informed choices. Energy storage project valuation methodology is typical of power sector projects through evaluating various revenue and cost assumptions in a project economic model. The difference is that energy storage projects have many more design and operational variables to incorporate, and the governing market rules that control these variables are still evolving. This makes project valuation for energy storage more difficult. As the number of operating projects grow, portfolios of these projects are being developed, garnering the interest of larger investors. Valuation challenges of these portfolios can be even more challenging as market role and geographical diversity can actually exacerbate the variability, not mitigate it. By proposing additional visibility of key factors and drivers for industry participants, the US DOE can reduce investment risk, expanding both the number and types of investors, plus helping emerging energy storage technology into sustained commercialization.

25 ENERGY STORAGE↗

Optimizing Alabama’s CO 2 Storage in Shelby County (OASIS) (Final Report)

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) is a CarbonSAFE Phase II designed to support the U.S. Department of Energy’s goals of reducing project risks and costs for future carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) projects, bringing more storage resources into commercial classifications that support business and financial decisions, and encouraging more rapid growth of a vibrant, geographically widespread industry for geologic carbon storage.

01 COAL, LIGNITE, AND PEAT↗

Exploratory Analysis of Offshore CO 2 Storage Pilot Project in the Gulf of Mexico: Geologic, Infrastructure, and Cost Considerations

This analysis employs a high-level exploratory analytical approach to quantify various considerations needed for a potential CCS pilot project in the GOM, most notably the cost magnitude to develop an offshore pilot project. The scope of this analysis focuses on CO 2 storage in saline formations presented in two specific scenarios: parts of GOM Outer Continental Shelf (OCS) federal waters and Texas state waters.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗