Search NASA⌕ Search

SEARCH · Search NASA

Results for “day of launch processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Fracture Mechanics Testing of Titanium 6AL-4V in LMP-103S Propellant

Propellant tank safe-life analysis is a spacecraft propulsion subsystem Launch Range processing requirement. The material property inputs for the safe-life analysis include the stress intensity factor for environment-assisted cracking (KEAC). The KEAC for titanium alloy Ti 6Al-4V in LMP-103S propellant was determined experimentally using an innovative test method following ASTM E1681, Standard Test Method for Determining Threshold Stress Intensity Factor for Environment-Assisted Cracking of Metallic Materials. This effort was a collaboration between NASA Goddard Space Flight Center and NASA Kennedy Space Center to expose the test specimens in the propellant, while loaded in the test fixtures, for 1000- hour (42 days) at 50°C. Two test rounds have been completed to date; 1) testing mechanically loaded specimens but without propellant and 2) testing mechanically loaded specimens wetted with LMP-103S propellant. The dry test was to evaluate the crack growth without exposure to the LMP-103S propellant, and further assess the un-wetted stress intensity factor for the full 1000-hour duration. The second round of testing included the propellant soak for the requisite 1000- hour at 50°C. Current results show that the threshold intensity factor for environment-assisted cracking (exposed to LMP103S) is 22.5 ksi√in for the bulk material and 36. 2 ksi√in for the weld material. A generic ‘candidate’ tank geometry and material thickness is developed for a damage tolerance of known surface cracks below the nondestructive inspection technique detection limit. Evaluations with and without the use of a threshold intensity factor for environment-assisted cracking is performed for the required 4x propellant tank service life using the software tool NASGRO. SP2024_00239

Green propulsion↗

Fixing What's Broken

We planned to launch in July 2000. Heading into March that year we were on schedule, under budget, meeting all of our performance requirements, and ready for the final testing Near the end of the day, it was time for the sign burst test. For 200 milliseconds we would put a non-feedback force on our system, which meant we couldn't adjust or halt the test in progress. Something went wrong, terribly wrong during the sign burst test. For 200 milliseconds we would put a non-feedback force on our system, which meant we couldn't adjust or halt the test in process. Something went wrong, terribly wrong during the sign burst test. As mission manager, I was standing just ten feet away from the spacecraft when this happened. It sounded like a clap of thunder. With the test stopped, we moved in closer to see what had happened - and we knew immediately that we had damaged our spacecraft. How much, we didn't know.

Snow, Frank↗

On The Development of Additive Construction Technologies for Application to Development of Lunar/Martian Surface Structures Using In-Situ Materials

For long-duration missions on other planetary bodies, the use of in-situ materials will become increasingly critical. As man's presence on these bodies expands, so must the breadth of the structures required to accommodate them including habitats, laboratories, berms, radiation shielding for natural radiation and surface reactors, garages, solar storm shelters, greenhouses, etc. Planetary surface structure manufacturing and assembly technologies that incorporate in-situ resources provide options for autonomous, affordable, pre-positioned environments with radiation shielding features and protection from micrometeorites, exhaust plume debris, and other hazards. This is important because gamma and particle radiation constitute a serious but reducible threat to long-term survival of human beings, electronics, and other materials in space environments. Also, it is anticipated that surface structures will constitute the primary mass element of lunar or Martian launch requirements. The ability to use in-situ materials to construct these structures will provide a benefit in the reduction of up-mass that would otherwise make long-term Moon or Mars structures cost prohibitive. The ability to fabricate structures in situ brings with it the ability to repair these structures, which allows for self-sufficiency necessary for long-duration habitation. Previously, under the auspices of the MSFC In Situ Fabrication and Repair (ISFR) project and more recently, under the joint MSFC/KSC Additive Construction with Mobile Emplacement (ACME) project, the MSFC Surface Structures Group has been developing materials and construction technologies to support future planetary habitats with in situ resources. One such technology, known as Contour Crafting (additive construction), is shown in Figure 1, along with a typical structure fabricated using this technology. This paper will present the results to date of these efforts, including development of novel nozzle concepts for advanced layer deposition using the Contour Crafting process. This process, conceived initially for rapid development of cementitious structures on Earth, also lends itself exceptionally well to the automated fabrication of planetary surface structures using minimally processed regolith as aggregate, and imported binder material or binders developed from in situ materials. This process has been used successfully in the fabrication of construction elements using lunar regolith simulant and Mars regolith simulant, both with various binder materials. These binder materials have resulted from extensive evaluation and include both "imported" binder materials that might be launched from Earth as well as some binder materials that can theoretically also be derived from existing regolith materials. They were chosen to 1) reduce penetrating radiation as much as possible, primarily with hydrogen-bearing polymers, 2) attempt to provide an air-tight structure, 3) sufficiently mix and adsorb to regolith grains for strength, 4) maximize tolerance to day-night thermal cycling, 5) possibly increase electrical conductivity to dissipate any accumulated static charge, and 6) ease their application on planetary surfaces (specifically, the accommodation of reduced atmosphere and lack of heat sinks). Some of these materials have been tested with respect to radiation mitigation, micrometeorite resistance, and resistance to larger, slower-traveling pieces of regolith impinging on the surface, simulating nearby launch and landing activities. Conceptual designs for a Continuous Feedstock Delivery/Mixing System (CFDMS) will also be presented and future planned activities will be discussed as well.

Werkheiser, Niki↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

Rocketdyne - F-1 Saturn V First Stage Engine

Before I go into the history of F-1, I want to discuss the F-1 engine s role in putting man on the moon. The F-1 engine was used in a cluster of five on the first stage, and that was the only power during the first stage. It took the Apollo launch vehicle, which was 363 feet tall and weighed six million pounds, and threw it downrange fifty miles, threw it up to forty miles of altitude, at Mach 7. It took two and one-half minutes to do that and, in the process, burned four and one-half million pounds of propellant, a pretty sizable task. (See Slide 2, Appendix C) My history goes back to the same year I started working at Rocketdyne. That s where the F-1 had its beginning, back early in 1957. In 1957, there was no space program. Rocketdyne was busy working overtime and extra days designing, developing, and producing rocket engines for weapons of mass destruction, not for scientific reasons. The Air Force contracted Rocketdyne to study how to make a rocket engine that had a million pounds of thrust. The highest thing going at the time had 150,000 pounds of thrust. Rocketdyne s thought was the new engine might be needed for a ballistic missile, not that it was going to go on a moon shot.

Biggs, Robert↗

Non Radiation Hardened Microprocessors in Spaced Based Remote Sensing Systems

The CALIPSO (Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations) mission is a comprehensive suite of active and passive sensors including a 20Hz 230mj Nd:YAG lidar, a visible wavelength Earth-looking camera and an imaging infrared radiometer. CALIPSO flies in formation with the Earth Observing System Post-Meridian (EOS PM) train, provides continuous, near-simultaneous measurements and is a planned 3 year mission. CALIPSO was launched into a 98 degree sun synchronous Earth orbit in April of 2006 to study clouds and aerosols and acquires over 5 gigabytes of data every 24 hours. The ground track of one CALIPSO orbit as well as high and low intensity South Atlantic Anomaly outlines is shown. CALIPSO passes through the SAA several times each day. Spaced based remote sensing systems that include multiple instruments and/or instruments such as lidar generate large volumes of data and require robust real-time hardware and software mechanisms and high throughput processors. Due to onboard storage restrictions and telemetry downlink limitations these systems must pre-process and reduce the data before sending it to the ground. This onboard processing and realtime requirement load may mean that newer more powerful processors are needed even though acceptable radiation-hardened versions have not yet been released. CALIPSO's single board computer payload controller processor is actually a set of four (4) voting non-radiation hardened COTS Power PC 603r's built on a single width VME card by General Dynamics Advanced Information Systems (GDAIS). Significant radiation concerns for CALIPSO and other Low Earth Orbit (LEO) satellites include the South Atlantic Anomaly (SAA), the north and south poles and strong solar events. Over much of South America and extending into the South Atlantic Ocean the Van Allen radiation belts dip to just 200-800km and spacecraft entering this area are subjected to high energy protons and experience higher than normal Single Event Upset (SEU) and Single Event Latch-up (SEL) rates. Although less significant, spacecraft flying in the area around the poles experience similar upsets. Finally, powerful solar proton events in the range of 10MeV/10pfu to 100MeV/1pfu as are forecasted and tracked by NOAA's Space Environment Center in Colorado can result in Single Event Upset (SEU), Single Event Latch-up (SEL) and permanent failures such as Single Event Gate Rupture (SEGR) in some technologies. (Galactic Cosmic Rays (GCRs) are another source, especially for gate rupture) CALIPSO mitigates common radiation concerns in its data handling through the use of redundant processors, radiation-hardened Application Specific Integrated Circuits (ASIC), hardware-based Error Detection and Correction (EDAC), processor and memory scrubbing, redundant boot code and mirrored files. After presenting a system overview this paper will expand on each of these strategies. Where applicable, related on-orbit data collected since the CALIPSO initial boot on May 4, 2006 will be noted.

Decoursey, Robert J.↗

Autonomous Navigation With Ground Station One-Way Forward-Link Doppler Data

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational onboard navigation systems (ONS's) to provide real time autonomous, highly accurate navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet (EP/EUV) spacecraft, launched on June 7, 1992, flight demonstrated the ONS for high accuracy navigation using TDRSS forward link communication services. In late 1994, a similar ONS experiment was performed using EP/EUV flight hardware (the ultrastable oscillator and Doppler extractor card in one of the TDRSS transponders) and ground system software to demonstrate the feasibility of using an ONS with ground station forward link communication services. This paper provides a detailed evaluation of ground station-based ONS performance of data collected over a 20 day period. The ground station ONS (GONS) experiment results are used to project the expected performance of an operational system. The GONS processes Doppler data derived from scheduled ground station forward link services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. Analysis of the GONS experiment performance indicates that real time onboard position accuracies of better than 125 meters (1 sigma) are achievable with two or more 5-minute contacts per day for the EP/EUV 525 kilometer altitude, 28.5 degree inclination orbit. GONS accuracy is shown to be a function of the fidelity of the onboard propagation model, the frequency/geometry of the tracking contacts, and the quality of the tracking measurements. GONS provides a viable option for using autonomous navigation to reduce operational costs for upcoming spacecraft missions with moderate position accuracy requirements.

Horstkamp, G. M.↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy Probe (MAP) is a Medium Class Explorers (MIDEX) mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The main science objective of the MAP mission is to produce an accurate full-sky map of the cosmic microwave background temperature fluctuations anisotropy. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta into a 185 km circular orbit. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a Lissajous orbit about the Earth-Sun L2 point. The mission duration is approximately 27 months with 3 to 4 months of transfer time to the final mission orbit about L2. The MAP transfer orbit consisted of 3.5 phasing loops: the first loop has a 7-day period, the second and third loops have a 9-day period, and the last half loop has a 4-day period as illustrated in Figure 1, which also indicates the placement of maneuvers. A Pfinal correction maneuver was performed 18 hours after the last perigee to more closely achieve the targeted lissajous orbit. The lunar encounter or swingby took place approximately 30 days after launch. After the lunar encounter, the spacecraft will cruise for approximately 120 days before it arrives at L2. A Mid-Course Correction (MCC) maneuver was executed seven days after the swingby to further refine the trajectory. Once the MAP satellite is injected into the L2 Lissajous orbit, it will perform occasional stationkeeping maneuvers to maintain the Lissajous orbit for a minimum of two years (and a goal of four years). Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes. Extensive trajectory error covariance analysis was performed to predict ephemeris accuracy for the OD process using a Bayesian least-squares technique. The orbit determination error analysis is essential for maneuver planning and maneuver recovery study. Several tracking scenarios were investigated for each phase of the mission. This paper provides a summary of the premission trajectory covariance error analysis, as well as actual real-time OD results. The use and impact of the various tracking stations, systems, and measurements will be discussed. Details of the operational OD support and the inferred OD accuracy will be presented, and the results will be compared to the premission covariance analysis, In addition, there will be a discussion of the challenges presented to OD support including delta-Vs at apogee as well as perigee, and effects due to spacecraft attitude mode, in light of their implications to the OD accuracy and covariance analysis.

Truong, Son H.↗

Utility of AIRS Retrievals for Climate Studies

Satellites provide an ideal platform to study the Earth-atmosphere system on practically all spatial and temporal scales. Thus, one may expect that their rapidly growing datasets could provide crucial insights not only for short-term weather processes/predictions but into ongoing and future climate change processes as well. Though Earth-observing satellites have been around for decades, extracting climatically reliable information from their widely varying datasets faces rather formidable challenges. AIRS/AMSU is a state of the art infrared/microwave sounding system that was launched on the EOS Aqua platform on May 4, 2002, and has been providing operational quality measurements since September 2002. In addition to temperature and atmospheric constituent profiles, outgoing longwave radiation and basic cloud parameters are also derived from the AIRS/AMSU observations. However, so far the AIRS products have not been rigorously evaluated and/or validated on a large scale. Here we present preliminary assessments of monthly and 8-day mean AIRS "Version 4.0" retrieved products (available to the public through the DAAC at NASA/GSFC) to assess their utility for climate studies. First we present "consistency checks" by evaluating the time series of means, and "anomalies" (relative to the first 4 full years' worth of AIRS "climate statistics") of several climatically important retrieved parameters. Finally, we also present preliminary results regarding interrelationships of some of these geophysical variables, to assess to what extent they are consistent with the known physics of climate variability/change. In particular, we find at least one observed relationship which contradicts current general circulation climate (GCM) model results: the global water vapor climate feedback which is expected to be strongly positive is deduced to be slightly negative (shades of the "Lindzen effect"?). Though the current AIRS climatology covers only -4.5 years, it will hopefully extend much further into the future.

Molnar, Guyla I.↗

The NASA Soil Moisture Active Passive (SMAP) Mission - Algorithm and Cal/Val Activities and Synergies with SMOS and Other L-Band Missions

NASA's Soil Moisture Active Passive (SMAP) mission, planned for launch in late 2014, has as its key measurement objective the frequent, global mapping of near-surface soil moisture and its freeze-thaw state. SMAP soil moisture and freeze/thaw measurements at 10 km and 3 km resolutions respectively, would enable significantly improved estimates of water, energy and carbon transfers between the land and atmosphere. Soil moisture control of these fluxes is a key factor in the performance of atmospheric models used for weather forecasts and climate projections Soil moisture measurements are also of great importance in assessing floods and for monitoring drought. In addition, observations of soil moisture and freeze/thaw timing over the boreal latitudes can help reduce uncertainties in quantifying the global carbon balance. The SMAP measurement concept utilizes an L-band radar and radiometer sharing a rotating 6-meter mesh reflector antenna. The SMAP radiometer and radar flight hardware and ground processing designs are incorporating approaches to identify and mitigate potential terrestrial radio frequency interference (RFI). The radar and radiometer instruments are planned to operate in a 680 km polar orbit, viewing the surface at a constant 40-degree incidence angle with a 1000-km swath width, providing 3-day global coverage. Data from the instruments would yield global maps of soil moisture and freeze/thaw state to be provided at 10 km and 3 km resolutions respectively, every two to three days. Plans are to provide also a radiometer-only soil moisture product at 40-km spatial resolution. This product and the underlying brightness temperatures have characteristics similar to those provided by the Soil Moisture and Ocean Salinity (SMOS) mission. As a result, there are unique opportunities for common data product development and continuity between the two missions. SMAP also has commonalities with other satellite missions having L-band radiometer and/or radar sensors applicable to soil moisture measurement, such as Aquarius, SAO COM, and ALOS-2. The algorithms and data products for SMAP are being developed in the SMAP Science Data System (SDS) Testbed. The algorithms are developed and evaluated in the SDS Testbed using simulated SMAP observations as well as observational data from current airborne and spaceborne L-band sensors including SMOS. The SMAP project is developing a Calibration and Validation (Cal/Val) Plan that is designed to support algorithm development (pre-launch) and data product validation (post-launch). A key component of the Cal/Val Plan is the identification, characterization, and instrumentation of sites that can be used to calibrate and validate the sensor data (Level I) and derived geophysical products (Level 2 and higher). In this presentation we report on the development status of the SMAP data product algorithms, and the planning and implementation of the SMAP Cal/Val program. Several components of the SMAP algorithm development and Cal/Val plans have commonality with those of SMOS, and for this reason there are shared activities and resources that can be utilized between the missions, including in situ networks, ancillary data sets, and long-term monitoring sites.

Njoku, Eni↗

The Mars Observer Mission

The Mars Observer Mission is to be the first in a series of modest-cost inner-planet missions. Launch is planned for the August/September 1990 Mars opportunity with arrival at Mars one year later. The geoscience/climatology objectives are to be met during a mapping mission over the course of one Mars year (687 days). The mapping orbit will be near-polar (93 degree orbital inclination), sun-synchronous (2 PM sunward equator crossing), and near-circular (350 km orbit altitude, 116 minute period). The spacecraft, to be selected in late 1985, will be a modified version of an existing commercial design which, in the mapping orbit, will maintain a nadir orientation. Experiments and instruments will be selected through an Announcement of Opportunity (AO) process with release of the AO in April 1985, and selection in early 1986. A description of current planning for this mission, with emphasis on climatology, is presented here.

Palluconi, F. D.↗

Analysis of the Artemis I Orion Spacecraft Power System Performance

NASA successfully completed an uncrewed test flight of the Orion spacecraft during the 26-day Artemis I mission in November and December 2022. The Artemis I mission profile included several potentially stressing features for Orion electrical power system (EPS) performance, including eclipse duration, multiple propulsive or navigational maneuvers which constrained positioning of the solar array wings (SAWs), and the proximity and phasing of various events together. All of these features vary significantly with Earth-sun-moon geometry, providing a unique challenge for predicting EPS performance before an exact launch date is known. This presentation will provide a brief mission overview, discuss the different computer models with varying levels of fidelity used to analyze Orion EPS performance, as well as the screening process developed to incorporate EPS performance as a consideration for launch epoch selection. Final preflight model predictions of EPS performance will be compared to in-flight telemetry measurements, and several EPS anomalies observed will be briefly discussed.

Orion↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Assessment of Gravity Recovery with CHAMP Data

The CHAMP mission, launched in July 2000, is the first in the series of mapping missions for the Earth's geopotential scheduled for the first decade of the new millenium. Its unique contributions compared to all the previous generation of satellites whose data have been included in Earth geopotential models are the precision global tracking with GPS data, and the availability of precision accelerometry data to model the nonconservative forces. Over the past year we have implemented extensive modifications to our GEODYN orbit determination processing code and ancillary data preprocessors to process the GPS and accelerometry data from missions such as CHAMP and GRACE. We report on the analysis of up to 60 days of CHAMP data and how these data contribute to Earth geopotential solutions where the base model is a derivative of EGM96. Preliminary results with only 12.5 days of data processed clearly show the ability of the CHAMP data to improve the modeling of the zonals (1=10 to 40), the m-dailies, the primary resonance terms, and the sectoral harmonics. We will detail the results of our calibrations of the CHAMP accelerometry and assess the quality of test solutions that include these CHAMP data.

Lemoine, F. G.↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

"Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

Research relative to the heavy isotope spectrometer telescope experiment

The Heavy Isotope Spectrometer Telescope (HIST) was launched during August 1978 on ISEE-3 (ICE). HIST was designed to measure the isotopic composition of solar, galactic, and interplanetary cosmic ray nuclei for the elements from H to Ni (1 less than or equal to Z less than or equal to 28) in the energy range from approximately 5 to approximately 200 MeV/nucleon. The results of these measurements have been used in studies of the composition of solar matter and galactic cosmic ray sources, the study of nucleosynthesis processes, studies of particle acceleration and propagation, and studies of the life-history of cosmic rays in the heliosphere and in the galaxy. On December 1, 1978, after 110 days in orbit, HIST suffered an electronic failure in its readout system. After that point, only one-half of the telemetry bits associated with the pulse heights measured by HIST were transmitted to Earth. As a result, the resolution of HIST was significantly degraded, and it served as an element rather than an isotope spectrometer. Fortunately, HIST was able to measure the isotopic composition of heavy nuclei in the 9/23/78 solar event (the largest solar energetic particle event since 1972) during the brief period that it operated at full resolution. This grant funded the analysis of data from the HIST instrument over the period from 12/1/85 to 11/30/92. In section 2 of this final report, we summarize the scientific accomplishments that have resulted from HIST measurements during this time period. A bibliography of tasks and papers that resulted is attached.

Stone, Edward C.↗

Mars Balloon Flight Test Results

This paper describes a set of four Earth atmosphere flight test experiments on prototype helium superpressure balloons designed for Mars. Three of the experiments explored the problem of aerial deployment and inflation, using the cold, low density environment of the Earth's stratosphere at an altitude of 30-32 km as a proxy for the Martian atmosphere. Auxiliary carrier balloons were used in three of these test flights to lift the Mars balloon prototype and its supporting system from the ground to the stratosphere where the experiment was conducted. In each case, deployment and helium inflation was initiated after starting a parachute descent of the payload at 5 Pa dynamic pressure, thereby mimicking the conditions expected at Mars after atmospheric entry and high speed parachute deceleration. Upward and downward looking video cameras provided real time images from the flights, with additional data provided by onboard temperature, pressure and GPS sensors. One test of a 660 cc pumpkin balloon was highly successful, achieving deployment, inflation and separation of the balloon from the flight train at the end of inflation; however, some damage was incurred on the balloon during this process. Two flight tests of 12 m diameter spherical Mylar balloons were not successful, although some lessons were learned based on the failure analyses. The final flight experiment consisted of a ground-launched 12 m diameter spherical Mylar balloon that ascended to the designed 30.3 km altitude and successfully floated for 9.5 hours through full noontime daylight and into darkness, after which the telemetry system ran out of electrical power and tracking was lost. The altitude excursions for this last flight were +/-75 m peak to peak, indicating that the balloon was essentially leak free and functioning correctly. This provides substantial confidence that this balloon design will fly for days or weeks at Mars if it can be deployed and inflated without damage.

deployment↗