Search NASA⌕ Search

SEARCH · Search NASA

Results for “ownership”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

Durable Fuel Cell MEA through Immobilization of Catalyst Particle and Membrane Chemical Stabilizer

For hydrogen-based fuel cell electric vehicle to be cost competitive with the incumbent diesel-powered internal combustion engine heavy-duty vehicle, the total cost of ownership of the truck must be decreased via both capital cost and the operating cost (H 2 fuel expense) reduction. This puts the emphasis on the decrease of fuel cell stack cost via use of low platinum catalyst material usage to decrease capital cost, high H 2 fuel efficiency and high stack durability to decrease the operating cost. US DOE has set a target of ≤ 0.25 mgPt/cm 2 total loading in the membrane electrode assembly, high fuel efficiency of > 68% and a HD-combined target of ≥ 2.5 kW/gPGM after running an accelerated stress test (AST) equivalent to 30,000 hours of heavy-duty fuel cell operation.

08 HYDROGEN↗

Recommendations for Minimum Required Diagnostics Information

The rapid growth of electrified transportation, including light- and medium-duty electric vehicles (EVs) as a mobility solution requires a reliable EV-charging infrastructure. To advance charging reliability, the ChargeX Consortium reports “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure” and “Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure” provided recommendations for a set of minimum required error codes (MRECs), their functional and responsibility classifications, and a guide for their implementation, using Open Charge Point Protocol (OCPP) versions 1.6J4 and 2.0.1.5 These reports outline a recommended practice for consistent error reporting and interpretation, which is essential for communicating issues uniformly across the complex and diverse EV-charging ecosystem. However, MRECs are just one part of diagnosing issues; another critical part is obtaining enough information about the current state and performance of the various charging components to identify root causes for each of the error codes. This additional diagnostics data can be used by technicians or automated systems to understand the context around an issue, allowing for timely resolution, decreased maintenance costs, and increased charging reliability. During everyday operations, data are regularly collected and analyzed across the ecosystem. Although sharing of all that available data would be great for diagnostics, concerns on data ownership, privacy, and original equipment manufacturer (OEM) intellectual property pose a challenge. To overcome this obstacle, this report proposes a set of minimum required diagnostic information (MRDI) and recommends that the industry implement these uniformly across the North American EV charging ecosystem. MRDI provides a means to exchange only data deemed necessary for root cause determination.

33 ADVANCED PROPULSION SYSTEMS↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

DOE Zero Energy Ready Manufactured Housing: Subject Matter Expert Technical Assistance Summary

Manufactured homes offer American consumers an affordable option for decent single-family detached housing. For working-class American families in many U.S. markets, manufactured homes are the first step toward home ownership. They now make up 10% of all new homes constructed in the United States, with higher percentages in the south and in rural communities. To help encourage the production of homes that are more durable, healthy, efficient, and disaster resistant, the U.S. Department of Energy is bringing its building science research to the manufactured housing industry through DOE’s Zero Energy Ready Manufactured Home (ZER-MH) program, which provides technical assistance and voluntary guidelines to manufactured home builders. Homes built to these guidelines are better able to handle power outages and less likely to experience moisture issues, offering a better product option for American families. This higher quality is evidenced by energy modeling which shows homes manufactured to these voluntary guidelines will typically use half the energy of manufactured homes built to the current minimum requirements of the U.S. Department of Housing and Urban Development (HUD)’s Manufactured Housing and Construction Safety Standard (MHCSS). These homes can also reduce critical energy demand during the busiest hours of the day, typically late afternoon and early evening in the summer when air conditioning demand is highest and mornings in the winter when furnaces and heaters are heating up. Reducing electricity demand during these peak periods when electricity rates are at their highest reduces costs for American families while freeing up capacity on overburdened energy distribution networks. Builders participating in the DOE ZER-MH program are eligible for a tax incentive via the 45L tax credit, which helps to offset the costs of ZER-MH upgrades, enabling builders to offer these certified homes at no additional cost. Together these factors enable manufactured homes to offer home buyers a housing option that is both affordable to finance and affordable to operate, with lower monthly mortgage payments and lower monthly energy bills.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Craig Energy Center Feasibility Study

Tri-State Generation and Transmission Association Inc. (“Tri-State”) provides wholesale electric power to its member cooperatives and public power districts that collectively deliver electricity to more than a million consumers in Colorado, Nebraska, New Mexico and Wyoming. The Craig Power Station has been an integral part of Tri-State’s dispatchable generation fleet that ensures an affordable, reliable and resilient energy supply for its members. The ownership of the Craig Station Unit 1&2 is a collaborative between Tri-State, Salt River Project Agricultural Improvement and Power District, Platte River Power Authority, PacifiCorp, and Public Service Company of Colorado and is known as the Yampa Project. Tri-State owns all of Craig Unit 3 and is the operator of all three units. All three of the Craig units have planned retirement dates that will not extend beyond 2028 and Tri-State Generation wanted to evaluate carbon-neutral emitting technologies that could provide approximately 300 megawatts (“MWs) of capacity and energy that will be lost after Unit 3 ceases operation, as well as provide a similar level of economic benefits to the Craig community. This report is to serve as a technology feasibility study constrained to the current land area available at the Craig site and was conducted based on the limitations of the region.

25 ENERGY STORAGE↗

New York State Household Travel Patterns: A Comprehensive Comparison Analysis

In 1969, the U.S. Department of Transportation began an initiative to collect detailed data on household and personal travel, with the most recent surveys being the 2017 and 2022 National Household Travel Surveys. The primary goal of these surveys is to collect trip-based data on the nature and characteristics of personal travel, allowing for an analysis of the relationships between travel patterns and the socio-economic and demographic characteristics of travelers and their households. In addition to the sample households allocated to New York State (NYS) in the national survey, they procured an additional sample of households in the 1995, 2001, 2009, and 2017 surveys. This report presents a comprehensive analysis of travel patterns, vehicle ownership trends, and travel behaviors across NYS regions and the rest of the nation.

99 GENERAL AND MISCELLANEOUS↗

Report on Retrieval of the Reactor Pressure Vessel A-60 Surveillance Capsule from Palisades Nuclear Generating Station

Located on the shores of Lake Michigan, the Palisades Nuclear Generating Station (PNGS) was a nuclear power plant that operated in Covert Township, Michigan. The plant had a single pressurized water reactor that produced electricity for the region. The PNGS was shut down in 2022 after more than four decades of service. The PNGS included in its surveillance program a surveillance capsule, designated A-60, containing specimens of a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. The capsule was removed from its surveillance position in the early 1995 and has been resident in the spent fuel pool since that time. This capsule was irradiated to a fluence of 1.87×10 20 n/cm 2 (E> 1MeV) that is equivalent for more than 120 effective full power year (EFPY) for the US reactor pressure vessel (RPV) fleet. The material is also of special interest because of its very high nickel content and potential for development of NiMnSi (nickel-manganese-silicon) precipitates. Combination of very high fluence and very high Ni and Cu content makes the material in this capsule of the great interest as benchmark for currently developing embrittlement trend curves (ETC) aiming to predict embrittlement at high fluences. Thus, several years ago the Light Water Reactor Sustainability Program (LWRSP) initiated negotiations with Entergy to harvest this high fluence capsule since it did not present any regulatory interest for PNGS but could play a very important role for LWRSP efforts for developing ETC for very long-term operation. The negotiations resumed once PNGS ownership moved to the Holtec International in June 2022 which was very supportive to the LWRSP efforts to harvest the A-60 capsule from the spent fuel pool. As a result, the contract was placed with the Westinghouse Electric Company (WEC) to come to PNGS site, retrieve the A-60 capsule, bring it to WEC Churchill hot cell facility, open the capsule and send all surveillance specimens in the capsule to ORNL for future characterization. These specimens from the PNGS A-60 capsule have arrived to ORNL in July 2023 and this report summarizes activities to retrieve and deliver specimens to ORNL site for future evaluation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hanover LED Streetlight Conversion

On May 8, 2017, Hanover residents voted overwhelmingly to transition to 100% renewable electricity by 2030 and heating, cooling and transportation by 2050. In so doing, we became the first municipality in the country to make this commitment by popular vote. To accomplish these goal town leaders developed a plan to address first transitioning municipal energy uses to renewable forms of energy, through on-site generation of the municipal electrical load, load reduction through energy efficiency improvements to town facilities and infrastructure. Significant progress has been accomplished in the generation of energy with 90%+ of the 2024 municipal load being offset by generation and through various energy efficiency projects. The utility owned street lighting was identified as a large energy consumer of 165 MWh annually (7% of the annual municipal load) due to old inefficient high-pressure sodium and mercury vapor streetlights with no ability to reduce wattage during periods with low lighting needs. The Hanover LED Streetlight Replacement Project replaced utility owned streetlights with town owned controllable (dimmable and trimmable) LED lights that can be adjusted by location and time of night. Coupled with ownership of the streetlights transfer to the town, the town’s share of the project pay back is 11 months and for the complete project including federal share the payback is approximately 3 years. With the completion of lighting upgrade, the annual streetlighting energy load has dropped by 60% to 67 MWh in the first year of operation (7/1/24 - 6/30/25). This amounts to an approximate $90,000 annual savings or a local 1% tax rate impact. Additionally, over 200,000 pounds of CO2 will be saved annually.

99 GENERAL AND MISCELLANEOUS↗

Assessment of Heavy-Duty Fueling Methods and Components-Modeling and Analysis

The goal of the Assessment of Heavy-Duty Fueling Methods and Components project was to comprehensively assess heavy-duty (HD) fuel cell electric vehicle fueling protocols and their effects on techno-economic assessments (TEA) and total cost of ownership (TCO). The project leveraged and built upon ongoing international HD fueling protocols and fueling component development activities to deliver component performance assessments, modeling tools and methods evaluations, TEA of industry-selected protocol structures, and experimental validations of the strategies at the station scale. The effects of the protocols on the fueling times, station costs, and TCO were explored. Fueling time, which was influenced by temperature and protocol selection, had a large impact on the station cost due to component sizing and satisfying hourly demand. As the fleet size increased, the station cost was shown to exponentially decrease by achieving economies of scale. Technology year and fuel economy were the largest contributors to the TCO; however, the choice of fueling protocol had a minor impact on the TCO.

33 ADVANCED PROPULSION SYSTEMS↗

Recommendations for Minimum Required Diagnostics Information for Electric Vehicle Charging Infrastructure

The rapid growth of electrified transportation, including light- and medium-duty electric vehicles (EVs) as a mobility solution requires a reliable EV charging infrastructure. To advance charging reliability, the ChargeX Consortium reports “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure” and “Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure” have provided recommendations for a set of minimum required error codes (MRECs), their functional and responsibility classifications, and a guide for their implementation using OCPP versions 1.6J and 2.0.1. These reports outline a recommended practice for consistent error reporting and interpretation, which is essential for communicating issues uniformly across the complex and diverse EV charging ecosystem. However, MRECs are just one part of diagnosing issues, another critical part is obtaining enough information about the current state and performance of the various charging components to identify root causes for each of the error codes. This additional diagnostics data can be used by technicians or automated systems to understand the context around an issue, allowing for timely resolution, decreased maintenance costs, and increased charging reliability. During everyday operations, data is regularly collected and analyzed across the ecosystem. Although sharing of all that available data would be great for diagnostics, concerns on data ownership, privacy, and OEM intellectual property pose a challenge. To overcome this obstacle, this report proposes a set of Minimum Required Diagnostic Information (MRDI) and recommends that the industry implement these uniformly across the North American EV charging ecosystem. MRDI provides a means to exchange only data deemed necessary for root cause determination.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Illinois Basin Regional DAC Hub TA-1: Feasibility (Phase-0) (Final Scientific/Technical Report)

The overall objective of this project was to complete a feasibility study for a Regional Direct Air Capture (DAC) Hub that encompasses Illinois, Indiana, and Kentucky. The geographic construct of this hub was based on the Illinois Basin – a geological area where at least seven (7) geological storage studies were conducted. The Hub was designed to assure a capacity to capture, store, and utilize at least 1,000,000 metric tons (tonnes) of CO2 from the atmosphere annually 1 metric tonnes per annum (MTA), starting from an initial capacity of 200,000 tonnes of CO2 per annum (KTA). The Hub also included:(1) clean energy providers to supply renewable energy to the DAC units; (2) geological storage facilities to inject and sequestrate the captured CO2; (3) CO2 utilization facilities that would uptake the captured CO2 and convert it into products; and (4) small business organizations that would assist in workforce development efforts for the region. This closeout report consolidates the tasks undertaken and accomplished as deliverables for the project. The project team had successfully completed all required tasks of phase 0a, confirming that the project is feasible based on the preliminary conceptual designs and operational requirements of the DAC systems. Of particular interest, the hub ownership structure was identified and was implemented in follow on projects that would transition the hub infrastructure to a build/operate phase.

36 MATERIALS SCIENCE↗

Viable Economic Frameworks and Regulatory Barriers for Community Microgrids

Community microgrids – microgrids with more than one piece of customer- and utility-owned distribution equipment contained in the isolation boundary – are an option for providing resilience to meet targeted community and utility needs. Because multiple investors, including customers, are involved there is a lack of clarity around viable ownership models, roles and responsibilities, and compensation mechanisms. Together, these aspects describe an economic framework. To be viable, an economic framework not only needs to provide the possibility of all parties agreeing to the microgrid but also needs to meet regulatory guidelines. This report contains learnings from present-day community microgrid tariffs and programs, regulatory filings, and experiences shared within an interest group to highlight regulatory barriers to community microgrids and identify several viable economic frameworks for community microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Energy Action Plan: Pastillo Tibes

The Energy Community Action Plan for Pastillo Tibes is a comprehensive strategy aimed at strengthening the community's resilience against energy challenges. This draft document emphasizes the importance of community ownership, inclusivity, and adaptability in the planning process, and is specifically tailored for this community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reimagining Heating, Ventilation, and Air Conditioning for New Manufactured Homes

Manufactured homes represent one of the most affordable paths to home ownership for American households, but minimum-efficiency equipment and poor-quality home installation can lead to excess energy use and high operating costs. Slipstream, with partners from the Florida Solar Energy Center (FSEC), Northwest Energy Works, and Washington State University, identified and tested manufactured home HVAC innovations targeted for new construction offering the most promising mix of improved energy performance and likelihood of industry uptake.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗