Search NASA⌕ Search

SEARCH · Search NASA

Results for “proton beam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

PIP-II 800 MeV Proton Linac Beam Pattern Generator

The PIP2 IT Beam Pattern Generator is the system that synchronizes beam injection and the RF systems between the PIP2 LINAC to the Booster. The RF frequencies of these two accelerator systems are not harmonically related. Synchronization is accomplished by controlling two MEBT Beam Choppers, which select 162.5MHz beam bunches from the LEBT and RFQ to produce an appropriate reduced beam bunch pattern that enables bucket-to-bucket transfer to the Booster RF at 46.46MHz (84th harmonic). This chopping pattern also reduces the beam current to an average of 2mA over the Booster injection, matching the Linac nominal beam current. The BPG also generates the RF frequency/phase reference which the Booster will phase lock to during injection. The BPG is fully programmable, allowing for arbitrary beam patterns with adjustable timing parameters, having a fine adjustment resolution of 38ps. The latter is accomplished using digital signal processing techniques. This paper discusses the design of the BPG, its construction, test results, and operational experience after being integrated into the PIP2 IT test accelerator and concludes with a discussion of the system’s performance and future plans.

43 PARTICLE ACCELERATORS↗

Kinematic Dependence of the Dilution Factor in the SpinQuest Experiment E1039 at Fermilab

Thirty years after the "Spin Crisis" began, there is still uncertainty surrounding the spin structure of the nucleon. SpinQuest Experiment E1039 at FermiLab will attempt to probe the internal transverse dynamics of the nucleon via Drell-Yan scattering of a 120 GeV proton beam from a polarized proton target to determine if the orbital angular momentum of the sea-quarks contributes to the overall spin of the nucleon. In order to understand a leading contribution to the overall systematic uncertainty in this experiment, a study was performed to calculate and evaluate the uncertainty in the dilution factor of the experimental target. This thesis catalogs that effort, highlights where it overlaps with other sources of systematic error, and suggests future work aimed at reducing the overall systematic error of the experiment.

Conover, Arthur↗

Comparison of Measured and Calculated Dose Rates for Ring Injection Dump Exchange at Spallation Neutron Source

According to the accelerator operation plan, the beam-stop and the proton beam window (PBW) assemblies of the existing Ring Injection Dump RID are replaced with fresh assemblies, when they have reached their end-of-life. End of-life is determinate by the stainless-steel beam-stop window having accumulated 10 dpa radiation damage. The exchange process took place during facility maintenance period that started in March 2023. Each of the spent assembles were put into specially designed storage containers temporarily residing near the RID building.The spent beam-stop is predicted to be the part of highest activation that has been removed in Spallation Neutron Source (SNS). The exchange processes require good work planning to minimize radiation exposure to personal. For each exchange step the residual dose rate distribution is calculated and the peak values are identified. This paper gives some examples of calculated vs measured doses during beam-stop assembly exchange.

Popova, Irina I.↗

Systematic error analysis in the absolute hydrogen gas jet polarimeter at RHIC

The Polarized Atomic Hydrogen Gas Jet Target polarimeter (HJET) is operated at the Relativistic Heavy Ion Collider (RHIC) since 2004 to measure the absolute polarization of each colliding proton beam. Polarimeter detectors and data acquisition were upgraded in 2015 to increase the solid angle, energy range, and to improve the energy and time resolution. These upgrades along with an improved beam intensity and polarization allowed us to greatly reduce the statistical and systematic errors for the proton polarization measurements in RHIC Runs 15 (E beam = 100 GeV) and 17 (255 GeV). For a typical 8 hour RHIC store, the measured proton beam average polarization was about P beam ~ 55 ± 2.0 stat ± 0.3 syst %. The elastic pp analyzing power, AN(t)~0.04, was determined with a precision of about |δA N (t)|~0.0002 in the momentum transfer squared range 0.001<-t<0.020 GeV 2 . In this paper we present a detailed systematic error analysis of the polarization measurements at HJET. Perspectives of using the HJET based absolute polarimeters in the future Electron Ion Collider (EIC) will be also discussed.

43 PARTICLE ACCELERATORS↗

Proposed muon collider R&D at SNS

Generation of a muon beam at a Muon Collider requires relatively short, high-charge proton bunches. They are produced in a high-average-power proton driver by first accumulating a proton beam from a super-conducting linac, then bunching the beam and finally compressing and combining the bunches into a single high-intensity proton pulse. All of these beam formation stages involve handling of unprecedentedly high beam charges. Validation of these intricate beam manipulations requires better understanding of extreme space-charge effects and experimental demonstration. A facility perhaps most closely resembling the proton driver configuration and beam parameters is the Spallation Neutron Source (SNS) accelerator complex at Oak Ridge National Laboratory (ORNL). Considering the energy scaling of the space-charge parameters, many of the beam formation steps planned for the proton driver can be experimentally checked at the SNS at the relevant space-charge interaction levels. This paper discusses potential proton driver and other muon-collider-related R\&D at the SNS.

43 PARTICLE ACCELERATORS↗

The 2023 Gold Run in the Injectors

RHIC Run 23 used Gold beam from Tandem with an AGS extraction energy of 9.8 GeV. The same basic setup, 8 single bunch transfers from the Booster and a 12-6 merge in the AGS to provide 4 bunches at extraction, had been used before to deliver Tandem Au to RHIC. But in those cases, it was used for low energy runs (3.85 GeV in 2021 and 5.75 GeV in 2020) where extraction was below transition energy (7.9 GeV). Tandem beam was used for this run because the intensity and stability of EBIS Au did not meet the requirements for RHIC. Physics was first declared in RHIC on May 22 nd and on August 1 st the run was cut short by about 2 months due to a major failure in RHIC. Prior to the advent of EBIS as the preinjector in 2012, 9.8 GeV Tandem Au was regularly delivered to RHIC but the setup in the Booster and AGS was quite different: Four Booster transfers of 6 bunches each were merged into 4 bunches using a 24-12-4 merge scheme. The supercycle length was 6.0 sec before June 29 th when it was extended to 6.6 sec to accommodate EBIS commissioning. The Tandem, Booster, and AGS were on user 1 for the 9.8 GeV setup. Some work with EBIS Au 32+ took place on EBIS, Booster, and AGS user 5 using the standard 9.8 GeV injector setup with a 4 to 1 merge in Booster and a 6-3-1 type merge in AGS. The Siemens motor generator was used for the entire run. An intensity limit of 8.0e9 Au 77+ ions in the AGS was in effect during the run to protect the J7 plunging stripping foil and the Copper absorber of the AGS beam dump. This corresponds to a merged bunch intensity limit of 2.0e9 Au 77+ ions for 4 equal intensity bunches. The per bunch intensity limit can be increased to 2.67e9 by reducing the number of BtA transfers from 8 to 6. There was also a Booster Late intensity limit of 16e9 Au ions in effect to protect the BtA stripping foil from damage due to overheating. Lowering the number of transfers also makes this limit less of a constraint. BtA foil 5, which was installed in 2020 and had not been used regularly prior to this run was used all run and showed no obvious signs of deterioration. In May, a Tandem Au 3.85 GeV setup from 2021 was also re-established on AGS user 2. It was used for APEX on May 24 and July 26. Initial work with 3.85 GeV beam was on May 19. Proton beam was also set up during the run and extracted to W dump on July 10. It was used for APEX on July 12. Although the OPPIS source was used the AGS setup was without snakes.

43 PARTICLE ACCELERATORS↗

Enhancing New Physics Searches with a Future Beam Dump Configuration at SBND

Accelerator-based neutrino experiments, especially those with high-intensity beams and highly capable detectors, offer a powerful and complementary method for probing new physics scenarios. The MiniBooNE experiment at Fermilab pioneered a special Booster Neutrino Beam (BNB) beam dump run and set new limits on sub-GeV dark matter. This white paper explores the physics opportunities enabled by operating the Short-Baseline Near Detector (SBND) at Fermilab in a future BNB beam dump configuration. Redirecting the proton beam away from the default target suppresses neutrino backgrounds, enabling SBND to significantly enhance sensitivity to many new physics scenarios. We evaluate two operational scenarios – off-target mode and a new dedicated beam dump mode – and demonstrate that both approaches can open new avenues in the search for physics beyond the Standard Model. We present two example cases, scalar dark matter and heavy neutral leptons via axion-like particle.

Dutta, Bhaskar [TAMU, College Station]↗

Low-Energy Cooling for Electron Ion Collider

Luminosity parameters at the highest hadron energy in the Electron Ion Collider (EIC) require a proton beam with a small vertical emittance. Such a small emittance can be obtained using the technique of electron cooling, by pre-cooling of the proton bunches at an injection energy of 23:8 GeV. After pre-cooling, the proton bunches are accelerated to the maximum energy for collisions. Once at the top energy, such proton bunches can be refilled frequently to maintain a high average luminosity, or, alternatively, cooling at the top energy could be provided with relaxed requirements of just counteracting the emittance growth due to Intra-Beam Scattering (IBS) and thus maintaining the luminosity close to its initial peak value. Presently, several schemes of cooling at the top energy of 275 GeV are being considered with the goal to maintain the initial proton beam parameters, thus relying on pre-cooling at the low energy to obtain such initial parameters of proton bunches. For the lowest proton collision energy of 41 GeV in the EIC, there is a need for an electron cooler which counteracts the beam emittance growth due to IBS. This can be achieved by the same electron cooler which is used for cooling of protons at 23.8 GeV. In this case, we assume the electron cooler rst pre-cools protons at an injection energy of 23.8 GeV and then, after acceleration, cools the 41 GeV protons, counteracting IBS and maintaining the beam emittances. In this report, we summarize a feasibility study of an electron cooler that would be needed to cool protons at 23.8 GeV to obtain a small vertical emittance, as well as to counteract beam growth due to IBS for collisions at 41 GeV. The traditional electron cooling system employed at a typical low-energy cooler is based on an electron beam generated with an electrostatic electron gun in DC operating mode, immersed in a longitudinal magnetic field. To cool protons at 23.8 and 41 GeV, electron beam energies of 13.0 and 22.3MeV, respectively, are required. Due to the technical limitations of static high-voltage acceleration, these beam energies require RF acceleration of a pulsed electron beam. Electron cooling using RF-accelerated electron bunches was recently successfully commissioned in RHIC, allowing us to consider such an approach for EIC low-energy electron cooling.

43 PARTICLE ACCELERATORS↗

R&D toward a proof-of-principle experiment on optical stochastic cooling at the Fermilab’s IOTA ring

The stochastic-cooling method was invented in the late 70s and played a key role in the accumulation of intense beams of antiprotons for a head-on collision with counter rotating proton beams at 500 GeV in the Super Proton Synchrotron (SPS) at CERN. Such an improvement led to the discovery of the W and Z bosons in 1983. In brief, stochastic cooling relies on recording information (position) associated with short longitudinal slices within the bunch. The radiation is encoded on a radiofrequency (RF) signal, manipulated and used to correct the bunch slices at a later time.The repetitive correction is applied as the beam circulates in the ring ultimately cool the beam.Stochastic cooling has been successfully implemented in several machines for particle cooling and accumulation. Cooling of bunched beams in proton-(anti)proton colliders was challenging due to the high phase-space density of the bunches but was recently demonstrated at the Relativistic Heavy Ion Collider (RHIC).

43 PARTICLE ACCELERATORS↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Advanced focusing system for secondary electrons in a bunch shape monitor

Non-destructive measurements of longitudinal beam profile in non-relativistic hadron accelerators are usually performed with Bunch Shape Monitors that utilize secondary electron emission to reproduce the shape of a primary ion beam. The existing devices, however, have poor electron collection efficiency from the wire and are limited to one dimensional measurements of the phase coordinate. Here, we present the development of a bunch shape monitor with improved performance for proton beams to be used in the Spallation Neutron Source accelerator. This improvement was achieved by adding focusing optics between the wire and the entrance slit, which will also allow measurements over a much higher dynamic range. Here we present the design, simulation and experimental test results of the developed new electron beam guidance system for the existing SNS bunch shape monitor that allowed significant improvement in the collection efficiency.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Resistive AC-Coupled Silicon Detectors: principles of operation and first results from a combined analysis of beam test and laser data

This paper presents the principles of operation of Resistive AC-Coupled Silicon Detectors (RSDs) and measurements of the temporal and spatial resolutions using a combined analysis of laser and beam test data. RSDs are a new type of n-in-p silicon sensor based on the Low-Gain Avalanche Diode (LGAD) technology, where the n+ implant has been designed to be resistive, and the read-out is obtained via AC-coupling. The truly innovative feature of RSD is that the signal generated by an impinging particle is shared isotropically among multiple read-out pads without the need for floating electrodes or an external magnetic field. Careful tuning of the coupling oxide thickness and the n+ doping profile is at the basis of the successful functioning of this device. Several RSD matrices with different pad width-pitch geometries have been extensively tested with a laser setup in the Laboratory for Innovative Silicon Sensors in Torino, while a smaller set of devices have been tested at the Fermilab Test Beam Facility with a 120 GeV/c proton beam. The measured spatial resolution ranges between 2.5μm for 70–100 pad-pitch geometry and 17μm with 200–500 matrices, a factor of 10 better than what is achievable in binary read-out (bin size/12). Beam test data show a temporal resolution of ~40ps for 200 μm pitch devices, in line with the best performances of LGAD sensors at the same gain.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Beam test performance of a prototype module with Short Strip ASICs for the CMS HL-LHC tracker upgrade

The Short Strip ASIC (SSA) is one of the four front-end chips designed for the upgrade of the CMS Outer Tracker for the High Luminosity LHC. Together with the Macro-Pixel ASIC (MPA) it will instrument modules containing a strip and a macro-pixel sensor stacked on top of each other. The SSA provides both full readout of the strip hit information when triggered, and, together with the MPA, correlated clusters called stubs from the two sensors for use by the CMS Level-1 (L1) trigger system. Results from the first prototype module consisting of a sensor and two SSA chips are presented. The prototype module has been characterized at the Fermilab Test Beam Facility using a 120 GeV proton beam.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Deep Underground Neutrino Experiment (DUNE) Program

The Deep Underground Neutrino Experiment (DUNE) is a next-generation long-baseline neutrino oscillation experiment aimed at determining the neutrino mass hierarchy and the CP-violating phase. The DUNE physics program also includes the detection of astrophysical neutrinos and the search for signatures beyond the Standard Model, such as nucleon decays. DUNE consists of a near detector complex located at Fermilab and four 17 kton Liquid Argon Time Projection Chamber (LArTPC) far detector modules to be built 1.5 km underground at SURF, approximately 1300 km away. The detectors are exposed to a wideband neutrino beam generated by a 1.2 MW proton beam with a planned upgrade to $>$ 2 MW. Two 770 ton LArTPCs (ProtoDUNEs) have been operated at CERN for over 2 years as a testbed for DUNE far detectors and have been optimized to take new cosmic and test-beam data in 2024-2025. The DUNE and ProtoDUNE experiments and physics goals, as well as recent progress and results, are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Combined Space Environmental Exposure Tests of Multi-Junction GaAs/Ge Solar Array Coupons

A set of multi-junction GaAs/Ge solar array test coupons were subjected to a sequence of 5-year increments of combined environmental exposure tests. The purpose of this test program is to understand the changes and degradation of the solar array panel components, including its ESD mitigation design features in their integrated form, after multiple years (up to 15) of simulated geosynchronous space environment. These tests consist of: UV radiation, electrostatic discharge (ESD), electron/proton particle radiation, thermal cycling, and ion thruster plume exposures. The solar radiation was produced using a Mercury-Xenon lamp with wavelengths in the UV spectrum ranging from 230 to 400 nm. The ESD test was performed in the inverted-gradient mode using a low-energy electron (2.6 - 6 keV) beam exposure. The ESD test also included a simulated panel coverglass flashover for the primary arc event. The electron/proton radiation exposure included both 1.0 MeV and 100 keV electron beams simultaneous with a 40 keV proton beam. The thermal cycling included simulated transient earth eclipse for satellites in geosynchronous orbit. With the increasing use of ion thruster engines on many satellites, the combined environmental test also included ion thruster exposure to determine whether solar array surface erosion had any impact on its performance. Before and after each increment of environmental exposures, the coupons underwent visual inspection under high power magnification and electrical tests that included characterization by LAPSS, Dark I-V, and electroluminescence. This paper discusses the test objective, test methodologies, and preliminary results after 5 years of simulated exposure.

Hoang, Bao↗

Simulation of Axion-like Particles at DarkQuest

DarkQuest is a collaboration at Fermilab searching for beyond the StandardModel (SM) physics using a xed target beam dump experiment. This experiment featuresa proton beam colliding with a target and creating particles, possibly theoretical ones,from the interactions that occur. A popular theoretical particle is the axion, an elementaryparticle that explains the breakage of symmetry that occurs in our current model of physics,called the strong CP problem. An axion-like particle (ALP) is similar to an axion in itsresolution of the strong CP problem, but has mass, and so is detectable by experimentation.By simulating the production and decay of an ALP, we can estimate the region of parameterspace of ALP mass and SM coupling that DarkQuest could make a discovery.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Impact of front-end parameters of the ARCADIA MD3 on charged particle detection

The ARCADIA INFN R&D project developed a Fully Depleted Monolithic Active Pixel Sensor (FD-MAPS) using a customized LFoundry 110 nm CIS process. The first in-beam characterization of the ARCADIA Main Demonstrator 3 (MD3) sensor with 200 $μ$m active thickness has been performed at the Fermilab Test Beam Facility with a 120 GeV proton beam. The Device Under Test (DUT) is tested with a trigger-less telescope composed of two ARCADIA MD3 tracking planes. This early study investigates the effect of the front-end parameters on the tracking performance.

Pantouvakis, C. [Padua U.; INFN, Padua]↗