Search NASASearch

SEARCH · Search NASA

Results for “solar tower systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,341 records · Page 13

Ejecta Generation and Redistribution on 433 Eros: Modeling Ejecta Launch Conditions

The NEAR-Shoemaker mission to asteroid 433 Eros presents an unprecedented opportunity to gain fundamental new knowledge about the processes governing regolith formation and redistribution on small bodies. NEAR-Shoemaker’s high-resolution imaging of the surface of Eros makes the asteroid a valuable and heretofore unparalleled laboratory for the detailed study of impact ejecta reaccretion and regolith redistribution on low-gravity (of order 10 -3 g) objects. Regolith is produced on asteroids by impact cratering, and the existence of regolith on the smallest solar system bodies supports the view that some of the ejecta from impact events on such objects may be retained. Impact craters and retained ejecta on low-gravity objects like Eros represent valuable natural laboratories for evaluating various models of impact cratering processes, since they may present crater structures or ejecta features that either do not form or are hidden on higher-gravity bodies like the Moon. Further, quantifying the extent to which impact processes generate and redistribute regoliths on small body surfaces (excavation depths, retained fraction, turnover timescales, etc.) is pivotal to the issue of how to relate meteoritical samples to their asteroidal parent bodies when surficial processes ( i.e., “space weathering”) may disguise or cover up underlying material and confound the ability of remote sensing techniques to provide reliable mineralogical assays of the parent objects. The rich variety of data on Eros’ regolith properties and distribution returned by NEAR-Shoemaker now require detailed analysis in order to take full advantage of the clues these observations offer for elucidating details of the impact cratering process on small bodies. Complicating simple interpretations of crater and ejecta morphology are dynamical effects on ejecta emplacement resulting from Eros’ irregular shape, rapid (5.27 hr) rotation, and low gravity. Figure 1 shows the very different ejecta deposit morphology that can result if the effects of rotation alone are neglected. Considering the additional complicating factors of Eros’ irregular shape and complex gravitational field, simple calculations of the extent and thickness of ejecta blankets and the spatial distribution of ejecta blocks from basic crater scaling laws or numerical hydrocodes alone do not suffice. In order to fully interpret the suite of NEAR-Shoemaker observations of regolith features across the surface of Eros and to evaluate various impact models for specific craters on the asteroid, detailed dynamical modeling of the deposition of crater ejecta from those craters is required . Here, I describe some modifications and improvements to the dynamical model being used for these studies.

D D Durda

Radiation-induced alteration of apatite on the surface of Mars: first in situ observations with SuperCam Raman onboard Perseverance

Abstract Planetary exploration relies considerably on mineral characterization to advance our understanding of the solar system, the planets and their evolution. Thus, we must understand past and present processes that can alter materials exposed on the surface, affecting space mission data. Here, we analyze the first dataset monitoring the evolution of a known mineral target in situ on the Martian surface, brought there as a SuperCam calibration target onboard the Perseverance rover. We used Raman spectroscopy to monitor the crystalline state of a synthetic apatite sample over the first 950 Martian days (sols) of the Mars2020 mission. We note significant variations in the Raman spectra acquired on this target, specifically a decrease in the relative contribution of the Raman signal to the total signal. These observations are consistent with the results of a UV-irradiation test performed in the laboratory under conditions mimicking ambient Martian conditions. We conclude that the observed evolution reflects an alteration of the material, specifically the creation of electronic defects, due to its exposure to the Martian environment and, in particular, UV irradiation. This ongoing process of alteration of the Martian surface needs to be taken into account for mineralogical space mission data analysis.

Science & Technology - Other Topics

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at about 3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching about 4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid's diameter at 60 +/- 7 m. Studies of 2024 YR 4 's potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. We cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid Disruption

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

First N 2 Profile for Venus’ Deep Lower Atmosphere

We present the first N 2 profile for Venus’ deep lower atmosphere (<15 km) and a constrained isotopic composition for cloud N 2 [1]. This work directly addresses unresolved questions for Venus using legacy observations. Prior to this work, there were no reported measurements for N 2 abundances at <15 km and the isotopic composition remained unconstrained [2]. The N 2 parameters are critical to understanding the evolution and thermal properties of the atmosphere [3-7]. Our N 2 results were obtained by re-analysis of data acquired in 1978 by the Pioneer Venus Large Probe Neutral Mass Spectrometer (LNMS) [8]. The archived mass spectra from 64.2 to 0.2 km were treated using the analytical procedures specifically developed for the LNMS [9-11]. Judicious peak fitting permitted disambiguation of (A) N 2 + and CO + at 28 u and (B) 14 N 15 N+, 13 CO + , and C 2 H 5 + at 29 u. Quality controls included comparing the (A) LNMS CO + /CO 2 + ratios to the NIST database and literature and (B) fitted counts for CO + to the expected counts of CO + calculated from C 18 O + and 13 CO + using the LNMS 16 O/ 18 O and 12 C/ 13 C ratios (obtained from CO 2 ). Our results show that N 2 is uniformly mixed across the deep lower atmosphere between ~0.2 and 15 km (2.49 ± 0.10 v%). In contrast, N 2 is non-uniformly mixed across the sub-cloud atmosphere and clouds (~15–59 km), where N 2 abundances increase by ~ 2-fold between ~15 km (2.45 ± 0.32 v%) and ~59-51 km (5.21 ± 0.18 v%). Using the cloud data, we also obtained a constrained 15 N/ 14 N ratio (2.93×10 -3 ± 0.13×10 -3 ) and δ 15 N value (-204 ± 35‰). Thus, the LNMS results [1] suggest that (A) the atmosphere is unstable at <15 km, (B) N 2 is not well-mixed >15 km, and (C) the cloud δ 15 N falls between Earth and the solar wind [12, 13]. Comparisons of the N 2 abundances and isotopic compositions for nitrogen, carbon, and oxygen to other Venus measurements will be discussed.

deep lower atmosphere

Adaptive Curation at NASA Johnson Space Center: Preparing for Artemis Samples by Leveraging Proven Practices and Innovative Solution

The proper curation of returned astromaterial samples is essential to ensure that high-quality scientific investigations can be conducted for decades, enabling future generations to address evolving research questions. The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center (hereafter JSC Curation) is responsible for curating all of NASA’s extraterrestrial samples. Under the governing document, NASA Procedural Requirement (NPR) 7100.5 “Curation of Extraterrestrial Materials”, JSC Curation is charged with “The curation of all extraterrestrial material under NASA control, including future NASA missions.” The Directive goes on to define Curation as including “...documentation, preservation, preparation, and distribution of samples for research, education, and public outreach.” JSC Curation has a long-standing legacy of curating extraterrestrial materials, including but not limited to Apollo and Luna lunar samples, Genesis solar wind samples, Stardust comet samples, asteroid samples (Hayabusa1, Hayabusa2, and OSIRIS-REx), and Antarctic Meteorite samples from a variety of parent bodies. Building on this foundation, the Artemis program introduces new challenges and opportunities for sample curation, requiring both the application of proven practices and the development of innovative solutions. The Artemis Collection will be curated using established protocols refined through decades of experience with Apollo and subsequent sample collections, including but not limited to the utilization of cleanrooms, custom nitrogen gloveboxes, specialized storage containers and tools; all of which have strict material utilization and prohibition requirements. These practices provide a robust framework for contamination control, documentation, and long-term preservation. However, Artemis samples may present unique scientific and operational requirements, including enhanced contamination control measures (relative to Apollo) driven by evolving science objectives. To meet these needs, JSC Curation is actively developing new technologies and protocols that extend beyond traditional approaches, ensuring that the integrity of samples is maintained under increasingly stringent standards. One critical area of innovation is the development of cold sample curation capabilities. Certain Artemis samples, particularly those from Permanently Shadowed Regions (PSRs) and cold environments, are expected to contain ices and volatile components that require preservation and handling at sub-zero or even cryogenic temperatures. JSC Curation is leveraging best practices from the cold and cryogenic sample industries, as well as other government agencies and academic experts, to design facilities and handling procedures that maintain sample integrity while enabling scientific access. The goal is to develop capabilities to allow researchers to investigate volatiles and other temperature-sensitive materials while minimizing chemical and physical alterations from their returned state. In summary, adaptive curation at JSC combines the reliability of proven methodologies with forward-looking innovations to meet the scientific and operational demands of Artemis. Through enhanced contamination control, advanced cold curation capabilities, and an understanding of known and evolving future science priorities, NASA is preparing to maximize the scientific return from Artemis samples and preserve their value for generations of researchers.

Andrea D Harrington

Advanced Liquid Propulsion Systems

The Advanced Liquid Propulsion Systems program is investigating selected problems generated by spacecraft operational requirements for propulsion systems capable of high inherent reliability, long-term storage in the space environment, multiple start in free fall (zero gravity), and engine throttling. The solutions proposed to satisfy these requirements are coordinated for practical application in a system.

PROPULSION SYSTEM

Application of System-Theoretic Process Analysis (STPA) to a NASA Concept Electric Aircraft Battery System

System-Theoretic Process Analysis (STPA) is a systems-based hazard analysis method that identifies unsafe interactions and control deficiencies in complex systems but has been rarely used for NASA programs in favor of more well-established hazard analyses. To evaluate its applicability, a NASA Safety and Mission Assurance (SMA) team applied the STPA method to an early-stage hybrid electrified aircraft concept, focusing on the energy storage system and electric powertrain. Objectives include assessing STPA’s value relative to traditional methods and its suitability for early design phases. Activities include team training, system review, detailed STPA execution, and comparison with traditional analyses. Findings show STPA provides a structured, comprehensive hazard evaluation and can identify additional risks by expanding analysis boundaries. However, traditional methods can yield similar results when applied rigorously, though they typically require more mature designs. Overall, STPA is a valuable addition, particularly for early development, informing safety requirements and supporting preliminary hazard analyses. Further pilot applications are recommended.

Electric Aviation

Control requirements for future battery systems

It is argued that sophisticated battery control systems are required to support the high power, high energy spacecraft secondary battery systems of the post 1985 time period. Four categories of battery control system functions are defined and discussed: battery operational control, auxiliary system control, battery system status indication and fault detection fault isolation. A concept for implementation of such a control system is also presented and discussed.

Masson, J. H.