Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

NASA Enterprise Managed Cloud Computing (EMCC): Delivering an Initial Operating Capability (IOC) for NASA use of Commercial Infrastructure-as-a-Service (IaaS)

In 2016, Ames supported the NASA CIO in delivering an initial operating capability for Agency use of commercial cloud computing. This presentation provides an overview of the project, the services approach followed, and the major components of the capability that was delivered. The presentation is being given at the request of Amazon Web Services to a contingent representing the Brazilian Federal Government and Defense Organization that is interested in the use of Amazon Web Services (AWS). NASA is currently a customer of AWS and delivered the Initial Operating Capability using AWS as its first commercial cloud provider. The IOC, however, designed to also support other cloud providers in the future.

IT Governance for Cloud Computing↗

Voyager engineering improvements for Uranus encounter

Engineering changes made on the Voyager spacecraft during their explorations of the outer solar system are discussed. A recovery from a scan actuator fault, achieved by ground testing, in flight capability enhancement and testing, conservation of actuator usage and a set of contingency plans to substitute roll motion of the spacecraft for motion of the scan platform in the AZ direction, is discussed. General engineering improvements made are addressed, including a scan platform anticreep patch modification, an improvement of dynamic performance during maneuvers, and adaptive control of the attitude control deadband. Changes made in the power management are described. Finally, engineering improvements made in order to enhance scientific findings at the Uranus encounter are reviewed in detail. The two most important were the increased gyro drift turn rate capability to accommodate image motion compensation for the close fly-by of Miranda and the reduction in spacecraft rates to accommodate increased imaging exposure times without incurring excessive image smear.

Marderness, H. P.↗

Introduction and Mission Response Team (MRT)

On February 1, 2003 the Space Shuttle Columbia, returning to Earth with a crew of seven astronauts, disintegrated along a track extending from California to Louisiana. Observers on the ground filmed breakup of the spacecraft. Debris fell along a 567 statute mile track from Littlefield, Texas to Fort Polk, Louisiana; the largest ever recorded debris field. At the time of the accident the National Aeronautics and Space Administration (NASA) flight surgeon on-duty at the Mission Control Center (MCC) in Houston, Texas initiated the medical contingency response. The DOD surgeon at Patrick Air Force Base was notified, NASA medical personnel were recalled and the services of Armed Forces Institute of Pathology (AFIP) were requested. Subsequent to the accident the NASA flight surgeons that had supported the crew on orbit now provided medical support to the crewmember s families. Federal Emergency Management Agency (FEMA), the National Transportation Safety Board (NTSB), the Federal Bureau of Investigation (FBI) and numerous other federal, state and local agencies along with the citizens of Texas and Louisiana responded to the disaster. Search and recovery was managed from a Disaster Field Office (DFO) established in Lufkin, Texas. Mishap Investigation Team (MIT) medical operations were managed from Barksdale Air Force Base, Louisiana. Accident investigation teams (Columbia Accident Investigation Task Force (CAITF) and Columbia Accident Investigation Board (CAIB)) appointed immediately after the disaster included current and former authorities in space medicine. In August 2003, the CAIB concluded its investigation and released its findings in a report published in February 2004.

Pool, Sam↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conceptual Drivers for an Exploration Medical System

Interplanetary spaceflight, such as NASA's proposed three-year mission to Mars, provides unique and novel challenges when compared with human spaceflight to date. Extended distance and multi-year missions introduce new elements of operational complexity and additional risk. These elements include: inability to resupply medications and consumables, inability to evacuate injured or ill crew, uncharted psychosocial conditions, and communication delays that create a requirement for some level of autonomous medical capability. Because of these unique challenges, the approaches used in prior programs have limited application to a Mars mission. On a Mars mission, resource limitations will significantly constrain available medical capabilities, and require a paradigm shift in the approach to medical system design and risk mitigation for crew health. To respond to this need for a new paradigm, the Exploration Medical Capability (ExMC) Element is assessing each Mars mission phase-transit, surface stay, rendezvous, extravehicular activity, and return-to identify and prioritize medical needs for the journey beyond low Earth orbit (LEO). ExMC is addressing both planned medical operations, and unplanned contingency medical operations that meld clinical needs and research needs into a single system. This assessment is being used to derive a gap analysis and studies to support meaningful medical capabilities trades. These trades, in turn, allow the exploration medical system design to proceed from both a mission centric and ethics-based approach, and to manage the risks associated with the medical limitations inherent in an exploration class mission. This paper outlines the conceptual drivers used to derive medical system and vehicle needs from an integrated vision of how medical care will be provided within this paradigm. Keywords: (Max 6 keywords: exploration, medicine, spaceflight, Mars, research, NASA)

Antonsen, Erik↗

Evaluation of Optimal Net Load Management in Microgrids Using Hardware-in-the-Loop Simulation

This paper presents the performance evaluation of a net load management (NLM) engine that balances load and generation in an isolated community to power a critical facility after a grid interruption event (e.g., the loss of a large generation unit). This NLM engine is particularly important for microgrid systems because it provides a high-speed, cost-optimal control solution to coordinate grid-forming inverters and to dispatch grid-following inverters and deferrable loads in microgrid systems to enhance grid resilience and reliability. The NLM algorithm cost-optimally dispatches the grid-following inverters and deferrable loads based on the demanded power and load priorities, and the grid-forming inverters use droop control to form system voltages and share active and reactive power. A controller-hardware-in-the-loop platform is developed to evaluate the control performance of the NLM algorithm with two sequential contingency events of lost generation units. The experimental results indicate that the NLM engine can maintain system stability, achieve the targeted system voltage and frequency, and balance load and generation to serve the critical facility with improved system resilience and reliability.

grid-following inverter↗

Evaluation of Optimal Net Load Management in Microgrids Using Hardware-in-the-Loop Simulation

This presentation discusses the performance evaluation of a net load management (NLM) engine that balances load and generation in an isolated community to power a critical facility after a grid interruption event (e.g., the loss of a large generation unit). This NLM engine is particularly important for microgrid systems because it provides a high-speed, cost-optimal control solution to coordinate grid-forming inverters and to dispatch grid-following inverters and deferrable loads in microgrid systems to enhance grid resilience and reliability. The NLM algorithm cost-optimally dispatches the grid-following inverters and deferrable loads based on the demanded power and load priorities, and the grid-forming inverters use droop control to form system voltages and share active and reactive power. A controller-hardware-in-the-loop platform is developed to evaluate the control performance of the NLM algorithm with two sequential contingency events of lost generation units. The experimental results indicate that the NLM engine can maintain system stability, achieve the targeted system voltage and frequency, and balance load and generation to serve the critical facility with improved system resilience and reliability.

droop control↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗

Design and Testing of an Approach to Automated In-Flight Safety Risk Management for sUAS Operations

An onboard risk management automation design is presented based on run-time assurance principles, as well as the concept for In-Time Aviation Safety Management Systems (IASMS) as described by the National Academies. The automation is designed to operate independently of the autopilot and perform real-time risk assessment spanning multiple classes of hazards, predict constraint violations, and track autopilot states. In the event of elevated risk conditions or predicted constraint violations, the automation will select from a set of available contingencies and trigger autopilot mode changes if necessary to mitigate risk exposure. The onboard automation also informs the remote operator/pilot of what the independent monitor is observing and any contingency decisions or actions that may arise during flight. Details of an implementation of this design and results of verification and validation activities, as required to meet stringent NASA software and system assurance standards, are also presented. This includes simulation and flight testing using small unmanned aircraft systems.

Ersin Ancel↗

G189A modelling of Space Station Freedom's ECLSS

This paper contains a review of the requirements and design of the Environmental Control and Life Support System (ECLSS) for Space Station Freedom; a review of the G189A ECLSS computer program model developed at Boeing for the complete configuration of pressurized elements or volumes; and some significant computed results from this model showing transient performance for subsystems responsible for Temperature and Humidity Control,. Atmosphere Control and Supply, Air Revitalization, and Water Recovery and Management. The computed results presented here are important in assessing the capabilities of the ECLSS equipment in maintaining acceptable levels of temperature, humidity, 02, N2 and (2% in the occupied volumes during crew changeout events. These events involve up to four extra crew members from the Orbiter being located temporarily in the Space Station modules in addition to the normal contingent of four crew members. These additional crew members impose additional demands on the ECLSS equipment, in order to control the levels of the aforementioned quantities. Satisfactory control of all of these quantities was achieved. The maximum computed pp C02 was in the acceptable degraded performance regime. This level is higher than the 3.00 mm Hg upper limit for normal conditions

Environmental Control and Life Support Systems (EC↗

Alssat Development Status and Its Applications in Trade Studies

The development of the Advanced Life Support (ALS) Sizing Analysis Tool (ALSSAT) using Microsoft® Excel was initiated by the Crew and Thermal Systems Division (CTSD) of Johnson Space Center (JSC) in 1997 to support the ALS and Exploration Offices in Environmental Control and Life Support System (ECLSS) design and studies. It aids the user in performing detailed sizing of the ECLSS based on suggested default values or user inputs for different combinations of the ALS regenerative system technologies (Ref. 1, 2). This analysis tool will assist the user in performing ECLSS preliminary design and trade studies as well as system optimization efficiently and economically. Since ALSSAT's latest publication in ICES 2001 (Ref. 1) describing the development of ALSSAT with its Air Revitalization Subsystem (ARS), Water Management Subsystem (WMS), and Biomass Subsystem (Biomass) mass balance sheets, ALSSAT has been expanded to include mass balance and sizing models for the remaining three ALS subsystems, namely, the Solid Waste Management Subsystem (SWMS), the Food Management Subsystem (FMS), and the Thermal Control Subsystem (TCS). The external interfaces, including the Extravehicular Activities (EVA) and Human Accommodations (HA), were implemented into ALSSAT in 2002. The overall mass balance sheet, which integrates the six ALS subsystems and the external interfaces applicable to the ECLSS, was also developed. In 2003, ALSSAT was upgraded to include the consideration of redundancy and contingency options in the ECLSS, as well as more ALS regenerative technology selections. ALSSAT has been used for the Metric Calculation for FY02 and FY03 (Ref. 3). Several trade studies were conducted in 2003. The analytical results will be presented in this paper.

Yeh, H. Y. (Jannivine)↗

Capturing Safety Requirements to Enable Effective Task Allocation Between Humans and Automaton in Increasingly Autonomous Systems

There is a current drive towards enabling the deployment of increasingly autonomous systems in the National Airspace System (NAS). However, shifting the traditional roles and responsibilities between humans and automation for safety critical tasks must be managed carefully, otherwise the current emergent safety properties of the NAS may be disrupted. In this paper, a verification activity to assess the emergent safety properties of a clearly defined, safety critical, operational scenario that possesses tasks that can be fluidly allocated between human and automated agents is conducted. Task allocation role sets were proposed for a human-automation team performing a contingency maneuver in a reduced crew context. A safety critical contingency procedure (engine out on takeoff) was modeled in the Soar cognitive architecture, then translated into the Hybrid Input Output formalism. Verification activities were then performed to determine whether or not the safety properties held over the increasingly autonomous system. The verification activities lead to the development of several key insights regarding the implicit assumptions on agent capability. It subsequently illustrated the usefulness of task annotations associated with specialized requirements (e.g., communication, timing etc.), and demonstrated the feasibility of this approach.

Neogi, Natasha A.↗

Passive, Collapsible Contingency Urinal for Human Space Flight

Fluid transport systems for spacecraft face acute challenges because of the persistently unfamiliar and unforgiving low-gravity environment. IRPI, LLC, has developed a contingency wastewater collection and processing device that provides passive liquid collation, containment, bubble separation, and droplet coalescence functions. The lightweight, low-volume, low-cost, and potentially disposable device may be used for subsequent sampling, metering, storage, disposal, and/or reuse. The approach includes a fractal wetting design that incorporates smart capillary fluidics. This work could have a broad impact on capillary-based fluid management on spacecraft and on Earth.

Jenson, Ryan↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Science Training History of the Apollo Astronauts

Following President Kennedy’s initiation of Project Apollo, NASA underwent substantial changes in personnel, organization, and programs and faced a major question: what to do on the Moon after landing. Once a decision that science activities, particularly geoscience, should be pursued, considerable debate ensued over how to accomplish this. Questions arose over instruments and tools required, samples and photos to be returned, landing site selection, and crew composition. Answers to these questions required major efforts for planning traverses on the Moon and training the astronauts in the extensive procedures necessary in low gravity to use tools, set up instruments, take adequate photos, collect and document samples, and provide proper descriptions. In addition to astronauts on the surface, an astronaut in lunar orbit managed additional instruments, photography and verbal descriptions. Training for these activities averaged nearly one hundred hours per month for over a year for each crew. There were many problems as the training progressed: adjusting groups and backgrounds of the training personnel for the best combination of personalities and skills, overcoming logistical troubles, revising awkward procedures, determining optimum means of communications between all involved groups, and devising contingency procedures for real-time problems. By the last mission these problems were overcome.

Phinney, William C.↗

Managing temporal relations

Various temporal constraints on the execution of activities are described, and their representation in the scheduling system MAESTRO is discussed. Initial examples are presented using a sample activity described. Those examples are expanded to include a second activity, and the types of temporal constraints that can obtain between two activities are explored. Soft constraints, or preferences, in activity placement are discussed. Multiple performances of activities are considered, with respect to both hard and soft constraints. The primary methods used in MAESTRO to handle temporal constraints are described as are certain aspects of contingency handling with respect to temporal constraints. A discussion of the overall approach, with indications of future directions for this research, concludes the study.

Britt, Daniel L.↗

Managing Action Duration Uncertainty with Just-In-Case Scheduling

Some applications involve automatic generation and execution of schedules that contain actions with uncertain durations. Such uncertainty can cause schedules to break during execution. This paper presents a technique, called Just-In-Case scheduling or JIC, for building robust schedules that tend not to break. The technique implements the common sense idea of being prepared for likely errors, just in case they should occur. The JIC algorithm analyzes a given schedule, determines where it is likely to break, reinvokes the scheduler to generate a contingent schedule for each highly probable break case, and produces a "multiply contingent" schedule. The technique was developed for a real telescope scheduling problem, and the paper presents empirical results showing that Just-In-Case scheduling performs extremely well for this problem.

Bresina, John↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗