Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Optimal mitigation and control over power system dynamics for stochastic grid resilience

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.

30 DIRECT ENERGY CONVERSION↗

Dynamics Informed Optimization for Resilient Energy Systems

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the Western System Coordinating Council (WSCC) 9-bus test system using synthetic multi-device outage scenarios. Towards integrating our modeling framework with real threats and more realistic power systems, we explore applying hybrid dynamics to power systems. Our work is applied to basic RL circuits with the ultimate goal of using the methodology to model protective tripping schemes in the grid. Finally, we survey mitigation techniques for HEMP threats and describe a GIS application developed to create threat scenarios in a grid with geographic detail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Contingency Contractor Optimization Phase 3 Extension User Manual Contingency: Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

97 MATHEMATICS AND COMPUTING↗

Autonomous spacecraft executive and its application to rendezvous and docking

Autonomy is needed for future spacecraft to solve the problems of human operator overload and transmission delay. This paper describes the autonomous spacecraft executive for rendezvous and docking. It is an onboard expert system and has decision making capability for mission planning of nominal and contingency cases. The executive has been developed and verified using a hardware motion based simulator.

Komura, Fuminobu↗

Deflection Missions for Asteroid 2011 AG5

The recently discovered asteroid 2011 AG5 currently has a 1-in-500 chance of impacting Earth in 2040. In this paper, we discuss the potential of future observations of the asteroid and their effects on the asteroid's orbital uncertainty. Various kinetic impactor mission scenarios, relying on both conventional chemical as well as solar-electric propulsion, are presented for deflecting the course of the asteroid safely away from Earth. The times for the missions range from pre-keyhole passage (pre-2023), and up to five years prior to the 2040 Earth close approach. We also include a brief discussion on terminal guidance, and contingency options for mission planning.

small body↗

Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key milestone for predicting and ensuring on-orbit success.

Gomez-Rosa, Carlos↗

Rapid Development of Instrument Thermal Models: Perspectives and Guidelines from NASA Goddard’s Instrument Design Laboratory

- The design and development of robotic spaceflight instruments is a critical part of NASA’s vision to discover and expand knowledge for the benefit of humanity - For typical flight instrument projects, thermal engineers will develop initial instrument thermal models over weeks or months, then iterate them over a project’s lifespan – In each iteration, the engineer will: - Refine their thermal models and thermal designs in accordance with updates from other subsystems - Perform trade studies - Solve very detailed and complex analysis problems, including worst-cases and contingencies - Pick hardware and plan for testing and integration - However, prior to a project being established, or for proposal development at an early conceptual stage, the luxury of multiple instrument design iterations may be limited or nonexistent – Within a short timeline, how do you complete a thermal model or explore multiple possible instrument configurations? – What are the critical parameters for your model? Which details do you include or leave out?

Kan Yang↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Abstraction Planning in Real Time

When a planning agent works in a complex, real-world domain, it is unable to plan for and store all possible contingencies and problem situations ahead of time. This thesis presents a method for planning a run time that incrementally builds up plans at multiple levels of abstraction. The plans are continually updated by information from the world, allowing the planner to adjust its plan to a changing world during the planning process. All the information is represented over intervals of time, allowing the planner to reason about durations, deadlines, and delays within its plan. In addition to the method, the thesis presents a formal model of the planning process and uses the model to investigate planning strategies.

COMPUTER PROGRAMMING↗

A Hybrid Dynamic/Steady-State Tool With Protection Simulation for Cascading-Outage Analysis of Extreme Events in Power Systems

The bulk electric power grid is subject to vulnerabilities from component outages, which in certain combinations (extreme events) might lead to cascading outages. Some of these outages can be severe enough to trigger brownouts and blackouts. Much is known about mitigating the first few failures near the beginning of a cascade, but there are few established methods and tools for directly analyzing the risks of cascading component outages over a longer time scale. Current power system tools have limited ability to perform detailed and accurate cascading-outage analysis, which could be computationally intensive. The Dynamic Contingency Analysis Tool (DCAT) enables power system planning engineers to more realistically assess the consequences of extreme contingencies and potential cascading events across their systems and interconnections. DCAT has several unique features: (i) detailed hybrid dynamic and steady-state analysis of power systems to mimic real-world cascading outages, (ii) detailed modeling of protection systems embedded in the dynamic simulation, (iii) simulation of corrective action after transients, (iv) simulation of islanding , and (v) high-performance computing capability to simulate a large number of contingencies in a reasonable time. DCAT outputs will help find technically sound solutions to reduce the risk of cascading outages. This paper provides details of DCAT methodology and shows its capabilities with extreme events on real-world cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Modeling High-Impact, Low-Frequency Power Grid Events to Support Risk-Informed Decisions

Natural and man-made hazardous events resulting in loss of grid infrastructure assets challenge the electric power grid’s security and resilience. However, the planning and allocation of appropriate contingency resources for such events requires an understanding of their likelihood and the extent of their potential impact. Where these events are of low likelihood, a risk-informed perspective on planning can be problematic as there exists an insufficient statistical basis to directly estimate the probabilities and consequences of their occurrence. Since risk-informed decisions rely on such knowledge, a basis for modeling the risk associated with high-impact low frequency events (HILFs) is essential. Insights from such a model can inform where resources are most rationally and effectively expended. The present effort is focused on development of a HILF risk assessment framework. Such a framework is intended to provide the conceptual and overarching technical basis for the development of HILF risk models that can inform decision makers across numerous stakeholder sectors. The North American Electric Reliability Corporation (NERC) 2014 Standard TPL-001-4 considers severe events for transmission reliability planning, but does not address events of such severity that they have the potential to fail a substantial fraction of grid assets over a region, such as geomagnetic disturbances (GMD), extreme seismic events, and coordinated cyber-physical attacks. These are beyond current planning guidelines. As noted, the risks associated with such events cannot be statistically estimated based on historic experience; however, there does exist a stable of risk modeling techniques for rare events that have proven of value across a wide range of engineering application domains. There is an active and growing interest in evaluating the value of risk management techniques in the State transmission planning and emergency response communities, some of this interest in the context of grid modernization activities. The availability of a grid HILF risk model, integrated across multi-hazard domains which, when interrogated, can support transparent, defensible and effective decisions, is an attractive prospect among these communities. In this report, we document an integrated HILF risk framework intended to inform the development of risk models. These models would be based on the systematic and comprehensive (to within scope) characterization of hazards to the level of detail required for modeling risk, identification of the stressors associated with the hazards (i.e., the means of impacting grid and supporting infrastructure), characterization of the vulnerability of assets to these stressors and the probabilities of asset compromise, the grid’s dynamic response to the asset failures, and assessment of subsequent severities of consequence with respect to selected impact metrics, such as power outage duration and geographic reach. Specifically, the current framework is being developed to;1. Provide the conceptual and overarching technical paradigms for the development of risk models; 2. Identify the classes of models required to implement the framework - providing examples of existing models, and also identifying where modeling gaps exist; 3. Identify the types of data required, addressing circumstances under which data are sparse and the formal elicitation of informed judgment might be required; and 4. Identify means by which the resultant risk models might be interrogated to form the necessary basis for risk management.

97 MATHEMATICS AND COMPUTING↗

Waste feed delivery planning at Hanford

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Feed Delivery Planning at Hanford - 13232

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contingency Contractor Optimization Engineering Prototype – Release 2.3 (Phase 3 Extension – Training Examples)

This document provides training examples to provide users practice in using the tool. Detailed instructions on how to use the tool can be found in the User Manual (SAND2015-6028).The Contingency Contractor Optimization project is intended to address former Secretary Gates’ mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the CCOT-P engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. CCOT-P uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The allocation of a variable series reactor considering AC constraints and contingencies

The Variable Series Reactors (VSRs) can efficiently control the power flow through the adjustment of the line reactance. When they are appropriately allocated in the power network, the transmission congestion and generation cost can be reduced. Our work proposes a planning model to optimally allocate VSRs considering AC constraints and multi-scenarios including base case and contingencies. The planning model is originally a non-convex large scale mixed integer nonlinear program (MINLP), which is generally intractable. The proposed Benders approach decomposes the MINLP model into a mixed integer linear program (MILP) master problem and a number of nonlinear subproblems. Numerical case studies based on IEEE 118-bus demonstrate the high performance of the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal allocation of series FACTS devices in large‐scale systems

Series flexible AC transmission systems devices, such as the variable series reactor, have the ability to continuously regulate the transmission line reactance so as to control power flow. This study presents a new approach to optimally locating such devices in the transmission network considering multiple operating states and contingencies. To investigate optimal investment, a single target year planning with three different load patterns is considered. The transmission contingencies may occur under any of the three load conditions and the coupling constraints between base case and contingencies are included. A reformulation technique transforms the original mixed integer non‐linear programming model into mixed integer linear programming model. To further relieve the computational burden and enable the planning model to be directly applied to practical large‐scale systems, a two‐phase decomposition algorithm is introduced. Detailed numerical simulation results on IEEE 118‐bus system and the Polish 2383‐bus system illustrate the efficient performance of the proposed algorithm.

Zhang, Xiaohu↗