Search NASA⌕ Search

SEARCH · Search NASA

Results for “Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Safe Operations at Roadway Junctions - Design Principles from Automated Guideway Transit

Herein this paper describes a system-level view of a fully automated transit system comprising a fleet of automated vehicles (AVs) in driverless operation, each with an SAE level 4 Automated Driving System, along with its related safety infrastructure and other system equipment. This AV system-level control is compared to the automatic train control system used in automated guideway transit technology, particularly that of communications-based train control (CBTC). Drawing from the safety principles, analysis methods, and risk assessments of CBTC systems, comparable functional subsystem definitions are proposed for AV fleets in driverless operation. With the prospect of multiple AV fleets operating within a single automated mobility district, the criticality of protecting roadway junctions requires an approach like that of automated fixed-guideway transit systems, in which a guideway switch zone "interlocking" at each junction location deconflicts railway traffic, affirming safe passage. The analogous AV protection safety subsystem is defined as fail-safe equipment that monitors roadway intersections and junctions, communicates traffic signal status, perceives and communicates alerts and signals to AV connected vehicles concerning potential unsafe conditions, and performs related primary safety functions. Conclusions are drawn that the AV protection roadway intersection functions must be performed by local roadside equipment dedicated to protecting each roadway intersection and junction. Further, it is concluded that the communications technology connecting the infrastructure with the vehicle to perform this vital, fail-safe protection should meet specific functional and performance criteria.

33 ADVANCED PROPULSION SYSTEMS↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Cross-domain digital twin architecture for predictive maintenance via machine learning and Large Language Models

This research introduces a comprehensive framework for creating and deploying a digital twin platform for continuous monitoring and predictive maintenance within industrial settings. Through utilizing advanced technologies, including Unreal Engine 5, Unity 3D, the Message Queue Telemetry Transport protocol, Random Forest machine learning algorithms, and Large Language Models (LLMs), we establish a platform that digitally reproduces physical equipment and translates digital controls into real-world actions. This facilitates preventive maintenance approaches and improves operational effectiveness. The digital twin platform gathers sensor data from operational equipment, analyzes it using machine learning, and delivers practical insights to prevent potential malfunctions and enhance equipment performance. Furthermore, the incorporation of a web portal enables efficient monitoring and access to historical data, educational materials, and equipment status information. Preliminary findings indicate that digital twins can transform industrial equipment management and maintenance methodologies.

97 MATHEMATICS AND COMPUTING↗

Optimal Control of Biomass Feedstock Processing System Under Uncertainty in Biomass Quality

Planning of biorefinery operations is complicated by the stochastic nature of physical and chemical characteristics of biomass feedstock, such as, moisture level and carbohydrate content. Biomass characteristics affect the performance of the equipment which feed the reactor and the efficiency of the conversion process in a biorefinery. We propose a stochastic optimization model to identify a blend of feedstocks, inventory levels, and operating conditions of equipment to ensure a continuous flowing of biomass to the reactor while meeting the requirements of the biochemical conversion process. We propose a sample average approximation (SAA) of the model, and develop an efficient algorithm to solve the SAA model. A feedstock preprocessing process consists of two-stage grinding and pelleting is used to develop a case study. Extensive numerical analysis are conducted which lead to a number of observations. Our main observation is that sequencing bales based on moisture level and carbohydrate content leads to robust solutions that improve processing time and processing rate of the reactor. We provide a number of managerial insights that facilitate the implementation of the model proposed. Note to Practitioners—This paper is motivated by the challenges faced in the bioenergy industry. The focus of this paper is on plants which use the biochemical conversion process to generate liquid fuels. It has been observed that variations in biomass characteristics, such as moisture content, cause variations in feeding of the system which lead to under-utilization of equipment. A requirement of biochemical conversion process is to maintain the carbohydrate content of biomass processed by the reactor, larger than a threshold. We propose a model that identifies the inventory levels and operating conditions of equipment to ensure a continuous flowing of biomass to the reactor. The goal is to improve equipment utilization while satisfying the requirements of the conversion process. The model is tested using real-life data. We found out that by sequencing bales based on moisture level and carbohydrate content, a plant can reduce variability in the system leading to improved system reliability, higher processing rates of the reactor, and higher throughput.

09 BIOMASS FUELS↗

Visualizing Comparisons of Bill of Materials

Protecting critical infrastructure from cyber attacks, natural disasters, and other disruptions is a priority of the U.S. Government. Critical infrastructure includes providing electricity to homes and businesses, supplying natural gas for heating, and producing renewable energy sources. A loss of these services, as seen in the Solarwinds supply chain attack in 2020 , Texas snowstorm of 2021, the Colonial Pipeline cyber incident of 2021, and the Washington power substation attacks in 2022 result in high costs to consumers, disruption of everyday life, and even death. To protect the infrastructure, we first have to know what equipment we are protecting. The complexity of distributed manufacturing and development coupled with the increasing prevalence of cyber and supply chain attacks necessitates a greater understanding of the hardware and software components that comprise equipment in critical infrastructure. When a vulnerability in a single software library can have disastrous consequences, it is vital to understand critical equipment and systems at a granular level. This need has led to increased energy around the development and incorporation of bill-of-materials (BOM) into existing asset management practices to aid in mitigating, and responding to future attacks \cite{noauthor_software_nodate}. While much of the current research is devoted to creating BOMs, it is equally important to develop methodologies for leveraging BOMs to answer questions, such as: How has my software changed? Are two pieces of equipment equivalent? Does this piece of equipment that just arrived match my historical information? In this work, we demonstrate how BOMs can be represented by graph structures. We then describe how these structures can be fed into a graph comparison algorithm to produce a novel interactive visualization that allows us to not only identify differences in BOMs, but show exactly where they are in the product.

Jones, Rebecca D.↗

Model Package Report: Composite Analysis Solid Waste Release Model (CASWR Model)

This document describes the implementation of a solid waste form release model in GoldSim for the Hanford Site Composite Analysis (CA) Update. This Composite Analysis Solid Waste Release model (CASWR model) was designed to generate deterministic radionuclide release rates for Hanford’s Central Plateau solid waste disposal sites using single realizations of release model coefficients. Five generalized waste form types are used for the conceptual model of waste release: surplus reactor block, cement, soil-debris, grouted residual waste, and ancillary equipment. The surplus reactor block waste form consists of radionuclide leaching from surplus production graphite reactor core blocks via unspecified processes (White et al., 1984 as cited in PNNL-15965). The cement waste form represents solidified wastes whose permeability is much lower than that of the surrounding soil. The soil-debris waste form type is defined as unconsolidated waste mixed with soil material. Tanks and canyon complexes comprise the grouted residual waste form such that their solid waste will be grouted and capped with a surface barrier at the completion of their cleanup. Finally, the ancillary equipment waste form constitutes contaminant releases from ancillary and auxiliary waste form residues associated with tank farms at closure. Individual sub-models are implemented to numerically represent a respective waste form within the CASWR Model: Surplus Reactor Block Sub-model, Cement Sub-model, SoilDebris Sub-model, Grouted Residual Waste Sub-model, and Ancillary Equipment Submodel. Advection is assumed to be the primary transport process governing the release of radionuclides in the Ancillary Equipment and Soil-Debris Sub-models. Diffusion is assumed to be the primary release process in the Grouted Residual Waste and Cement Sub-models. An unspecified zero-order release process is considered in the Surplus Reactor Block Sub-model due to the lack of information regarding actual processes involved in irradiated graphite leaching. The Surplus Reactor Block, Cement, and SoilDebris Sub-models were compared against analytical solutions (PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site). The agreement between results of these analytical solutions and the corresponding waste form models verified their correct implementation in GoldSim. A 1-D modeling abstraction approach for the Grouted Residual Waste and Ancillary Equipment Sub-models was adopted from existing Performance Assessment (PA) models. Despite the simplifications made in these sub-models, they were found to be appropriate representations of the waste forms, similar to what was used in the Waste Management Area C PA model (RPP-ENV-58782, Performance Assessment of Waste Management Area C, Hanford Site, Washington, Rev. 0). A sensitivity analysis was conducted to identify the most influential parameters in each waste form sub-model. Suggestions for considering pH-dependent and redox-dependent release mechanisms are formulated through the development of a conditional constant approach in GoldSim.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing Plug Load Energy Use and Savings Potential in Army Buildings

The Assistant Secretary of the Army (Installations, Energy and Environment) tasked the Pacific Northwest National Laboratory to examine plug loads in typical Army buildings. Plug loads (also known as miscellaneous electric loads (MELs)) represent the electricity used by appliances and devices that are plugged in or hardwired and serve functions outside of a building’s core end uses. Common plug loads include computers, printers, copiers, networking devices, refrigerators, and vending machines. They also include personal electronic devices such as televisions, smart phones, tablets, and gaming systems. Examples of hardwired MELs include elevators, air compressors, and fire and security systems. The findings from this study confirm that significant energy is consumed within Army buildings by plug load devices and hardwired MEL equipment. A number of opportunities are identified for reducing unnecessary energy use that could save the Army over $5 million per year when broadly applied. Army regulations clearly spell out expectations for the purchase and operation of information technology equipment (computers, laptops, monitors, printers, and multi-function devices). However, the policies regarding the shutdown or activation of sleep and other lower power modes after 30 minutes of inactivity (15 minutes for monitors) do not appear to be consistently followed. There are many effective approaches and pathways for impacting change as it relates to improving awareness, implementing measures, and adjusting behaviors to identify and reduce plug load energy use. The Army should prioritize and consider deploying all of these to better understand and manage plug load equipment to save energy and enhance resilience across their facilities. Engaging the building occupants who use these devices daily via outreach and education should be a strong component of the strategy. The focus should be on reducing waste without sacrificing productivity or the benefits that many of these devices provide. Continued evaluation of plug loads beyond that performed here is important to gather lessons from additional building and equipment types, and to stay aware of evolving device technology and management options. This will highlight additional needs for policies, best practices, control technologies, and education of personnel to achieve real reductions in energy waste from plug load equipment. It is recommended that this study may serve as the foundation for a broader and sustained focus on plug loads and MELs, towards simultaneously enhancing the productivity, readiness, and resilience of the Army while reducing energy use and demand, and freeing up resources to better support the mission.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Process Optimization for Biochemical Conversion

This research is motivated by the challenges faced during biomass processing in bioenergy plants. It has been observed that variations in biomass characteristics, such as moisture, ash, and carbohydrate contents cause variations in feeding of the system which led to underutilization of equipment and the reactor. The objective of this research is to ensure a continuous flow of biomass to the reactor in plants that use the biochemical conversion process to generate liquid fuels. The overall goal is to lower the cost of producing biofuels, which could lead to improving US’s energy independency and growing US’s rural economy. The research team developed analytical models, such as discrete element method (DEM) models and mathematical models. The DEM models are unit-level models that explicitly capture biomass characteristics and quantify the impacts of biomass characteristics on bulk material properties and the performance of specific equipment. The mathematical models are system-level models that capture the impacts of system infeed rate, equipment processing rate, storage location and capacity, and biomass characteristics on system throughput. The functional relations predicting the bulk material properties from DEM models are incorporated to the mathematical models. The models developed were validated and evaluated using data collected at Idaho National Laboratory’s biomass processing facility. Via these models, we identified process control strategies that ensure a continuous flow of biomass to the reactor, while meeting the requirements of biochemical conversion process. Our analysis indicates that sequencing of biomass bales based on moisture level, and carbohydrate contents could have a positive impact on reducing processing time and inventory level and increasing throughput rate. Short bale sequences that repeat frequently, seem to have the greatest impact on improving system’s performance. Based on our experiments, the total annual system operating costs reduced by 20-30%, and the maximum inventory level reduced by 3 to 4 times. The operating costs include the annual equipment amortization cost and processing cost. The implementation of the models developed requires the use of standardized bale format, Radio Frequency Identification technology, sensing and real time monitoring of material attributes, automated material handling equipment, and automated process control. The scope of the model proposed can be extended to include the whole supply chain. The supply chain models help identify how many bales of different biomass feedstock to purchase given biomass availability in the region, biomass price and quality, and the biomass processing capabilities of the biorefinery. Thus, the outcomes of supply chain models can be used to inform the design of long-term contracts among farmers and the biorefinery.

09 BIOMASS FUELS↗

The Challenges of Safe Troubleshooting Work

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed. Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident. The primary challenges include: Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state. Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging. Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present. Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency. There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Mitigation for Removal of Building 01-202681 in the Main Storage Yard of the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

The Main Storage Yard was originally recorded as SHPO Resource No. S2772 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and as contributing to the significance of the potential Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed). The Main Storage Yard retains all seven aspects of integrity. The location, design, materials, workmanship, feeling, and association have not changed since the original construction. Since the purpose of the yard is to maintain storage equipment that is actively being used, the design and feeling will change each time equipment is moved. Such actions reinforce the integrity of design and feeling. Buildings 01-101 and 01-102 were removed (Collins and Menocal 2020), but the other buildings and storage yard remain. Therefore, the setting has been changed, but not to the degree that the Main Storage Yard no longer conveys its significance (see Figures 4 and 5 for comparison). The Main Storage Yard was designed to facilitate the relocation of the Area 3 Subdock to Area 1 in 1985. The design for the overall Subdock provided a centralized cluster of buildings surrounded by two large storage yards. While the North Storage Yard largely serves as overflow storage, the Main Storage Yard holds the majority of drill rigs and drilling equipment needed to support big hole drilling. The Main Storage Yard and its contents were essential elements of the nuclear testing drilling program on the NNSS thus making it eligible for the NRHP under Criterion A for its contribution to broad patterns of history by storing specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is an engineered landscape that now serves as an open-air repository of drilling technology and nuclear testing. In addition to its individual significance, the Main Storage Yard also contributes to the significance of the Area 1 Subdock Historic District as it showcases a variety of big-hole drilling equipment, support facilities, and warehouses that were specially designed for nuclear testing at the NNSS. Despite the demolition of two contributing elements to date, the district still contains numerous examples of other facilities with the purpose of supporting big-hole drilling; therefore, the district still remains eligible under Criteria A and C.

54 ENVIRONMENTAL SCIENCES↗

Impact Analysis of High-Altitude Electromagnetic Pulse Coupling Effects on Power Grid Protection Relays

Protection relays are important equipment used for protection, control, and metering functions in the power grid. These relays are used to protect critical and difficult-to-replace equipment, like generators, transformers, and capacitor banks. Once the protection devices are disturbed or damaged, a high risk of power generation interruption occurs. Therefore, it is important and necessary to study the relay’s immunity to electromagnetic pulse (EMP) events. As a preliminary step toward empirical experimentation on actual equipment, this manuscript outlines an economical and efficient methodology for evaluating the impact of an EMP. An impedance measurement strategy was employed to model the equipment, setting the stage for subsequent immunity analyses. These analyses included the pulse current injection (PCI) method, which utilized an injecting probe to introduce the transient, and frequency domain electromagnetic (FEKO) simulation, which integrated electromagnetic coupling effects into the transient simulation. The impedance measurement and simulation results in this paper provide a reliable basis for gauging equipment performance in the face of HEMP threats. The results obtained using the PCI and FEKO simulations demonstrated the performance of different port responses under a high-altitude EMP, indicating the requirement for some protection to ensure the reliable operation of relays.

42 ENGINEERING↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process uses sampling to select equipment for functional acceptance testing when large quantities of equipment are present. Although this approach is generally effective in identifying wide-spread issues, it has several shortcomings: it fails to evaluate equipment not included in the sample, provides only a one-time validation of equipment operation, and the standard documentation is a simple checklist of pass/fail questions. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. This presentation highlights the advantages offered by automated functional testing in this critical laboratory setting: (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with Connected Commissioning and the important conversations with key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

On the impact of tidal generation and energy storage integration in PV-rich electric distribution systems

Deep decarbonization of power system operations requires the maximal utilization of available renewable resources. At distribution-level operations, however, grid operators can face numerous challenges in integrating renewables at scale owing to the inherent intermittence of renewable energy resources. These include phenomena such as voltage fluctuations, which are typically mitigated through control actuators such as on-load tap changers (OLTC) as well as energy storage devices, such as battery energy storage systems (BESS). On the one hand, high intermittence of the available renewable portfolio may require increasingly aggressive control of actuators, thereby accelerating the probability of equipment failure. On the other hand, integrating BESS operations and having a diverse renewable generation portfolio can typically help stagger power/energy flow to mitigate the aforementioned adverse impacts. In this paper, we employ a Bayesian framework for equipment lifetime estimation to understand the impact of including tidal energy resources and BESS in distribution system operations for feeders having substantial distribution photovoltaic generation. Our results indicate that while tidal energy alone may slightly decrease equipment reliability, the adverse impact on reliability is significantly magnified by a generation portfolio consisting of tidal generation and photovoltaic generation. Here, we also study the tidal and photovoltaic hosting capacity problem with and without energy storage systems using equipment reliability as an added constraint. We conclude that energy storage increases the reliability-constrained hosting capacity of the distribution system.

14 SOLAR ENERGY↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗