Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Support Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

In-space propellant logistics. Volume 4: Project planning data

The prephase A conceptual project planning data as it pertains to the development of the selected logistics module configuration transported into earth orbit by the space shuttle orbiter. The data represents the test, implementation, and supporting research and technology requirements for attaining the propellant transfer operational capability for early 1985. The plan is based on a propellant module designed to support the space-based tug with cryogenic oxygen-hydrogen propellants. A logical sequence of activities that is required to define, design, develop, fabricate, test, launch, and flight test the propellant logistics module is described. Included are the facility and ground support equipment requirements. The schedule of activities are based on the evolution and relationship between the R and T, the development issues, and the resultant test program.

Source record↗

Command module/service module reaction control subsystem assessment

Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.

Weary, D. P.↗

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.↗

TDRS multimode transponder program. Phase 1: Design

The use of geosynchronous tracking and data relay satellites (TDRS) which can serve both low data rate users at VHF and high data rate users at other frequencies is considered. The effects of radio frequency interference from the earth and of multipath propagation due to reflections from the earth are expected to pose problems for the TDRS system at VHF. Investigations suggest several modulation techniques that offer promise to overcome these problems. This report provides a complete design of a VHF/UHF multimode transponder and its associated ground support equipment. The transponder is designed for installation aboard an aircraft and will demonstrate candidate modulation techniques to provide the required information for the design of an eventual VHF/UHF transponder suitable for installation in a user satellite, capable of operating as part of a TDRS system.

Cnossen, R. S.↗

The interplanetary Pioneers. Volume 2: System design and development

The Pioneer systems, subsystems, and ground support activities are described. Details are given on the launch trajectory and solar orbit plans, spacecraft design approach and evolution, scientific instrument, test and ground support equipment, Delta launch vehicle, tracking and communication, and data processing equipment. Pioneer specifications, and reliability and quality assurance are also included.

Corliss, W. R.↗

Apollo experience report: Spacecraft pyrotechnic systems

Pyrotechnic devices were used successfully in many systems of the Apollo spacecraft. The physical and functional characteristics of each device are described. The development, qualification, and performance tests of the devices and the ground-support equipment are discussed briefly. Recommendations for pyrotechnic devices on future space vehicles are given.

Falbo, M. J.↗

Implementing instructions for KSC systems and safety training

The requirements for the safety training program are reported for KSC including transportation, inspection, checkout operations, maintenance of launch vehicles, spacecraft, ground support equipment, and launch teams. The responsibilities and mechanics for implementing the program are outlined.

Source record↗

Study of solid rocket motor for space shuttle booster, volume 2, book 2

A technical analysis of the solid propellant rocket engines for use with the space shuttle is presented. The subjects discussed are: (1) solid rocket motor stage recovery, (2) environmental effects, (3) man rating of the solid propellant rocket engines, (4) system safety analysis, (5) ground support equipment, and (6) transportation, assembly, and checkout.

Source record↗

Apollo 16 Mission: Oxidizer Deservicing Tank Failure: Anomaly Report - No. 1

An explosive failure of a ground support equipment decontamination unit tank occurred during the postflight deactivation of the oxidizer (nitrogen tetroxide) portion of the Apollo 16 command module reaction control system. A discussion of the significant aspects of the incident and conclusions are included.

Source record↗

Study of solid rocket motor for space shuttle booster, volume 2, book 1

The technical requirements for the solid propellant rocket engine to be used with the space shuttle orbiter are presented. The subjects discussed are: (1) propulsion system definition, (2) solid rocket engine stage design, (3) solid rocket engine stage recovery, (4) environmental effects, (5) manrating of the solid rocket engine stage, (6) system safety analysis, and (7) ground support equipment.

Source record↗

Skylab Rescue Space Vehicle OAT No. 1 Plugs in Test

A test is described which demonstrates the compatibility of the Skylab Rescue Space Vehicle systems, the ground support equipment, and off-site support facilities by proceeding through a simulated launch countdown, liftoff, and flight. The functions of propellant loading, umbilical ejection, holddown arm release, service arm retraction, liftoff, and inflight separation are simulated. An external power source supplies transfer power to internal, and instrument unit commands are simulated by the digital command system. The test outline is presented along with a list of references, intercommunications information, radio frequency matrix, and interface control chart.

Jevitt, S. J.↗

Skylab rescue space vehicle flight readiness test

A Skylab Rescue Space Vehicle flight readiness test is described which ensures that space vehicle systems are in a state of flight readiness and are compatible with associated ground support equipment. The functions of propellant loading, umbilical ejection, ignition, holddown arm release, liftoff, and service arm and tail service mast retraction are simulated. The test outline is presented along with a list of references, intercommunications information, operations interface control chart, and flight test.

Jevitt, S. J.↗

Alternate concepts study extension. Volume 2: Part 4: Avionics

A recommended baseline system is presented along with alternate avionics systems, Mark 2 avionics, booster avionics, and a cost summary. Analyses and discussions are included on the Mark 1 orbiter avionics subsystems, electrical ground support equipment, and the computer programs. Results indicate a need to define all subsystems of the baseline system, an installation study to determine the impact on the crew station, and a study on access for maintenance.

Source record↗

Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

Source record↗

Space Tug Point Design Study. Volume 3: Design Definition. Part 2: Insulation, Meteoroid Protection, Structures, Mass Properties, GSE, Reliability and Safety

A study was conducted to determine the configuration and performance of a space tug. Detailed descriptions of the insulation, meteoroid protection, primary structure, and ground support equipment are presented. Technical assessments leading to the concept selection are analyzed. The tug mass properties, reliability, and safety assessments are included.

Source record↗

Peformance evaluation of a passive microwave imaging system

A test program was conducted to evaluate the passive microwave imaging system for possible application in the NASA Earth Resources Program. In addition to test data analysis, the report gives a brief description of the radiometer, its software, and the ground support equipment. The microwave image quality is adequate for remote sensing applications studies. Instrument problems are described, and suggestions are given for possible improvements and potential applications.

Mcallum, W. E.↗