Search NASA⌕ Search

SEARCH · Search NASA

Results for “James Webb Space Telescop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

James Webb Space Telescope Integrated Science Instrument Module Calibration and Verification of High-Accuracy Instrumentation to Measure Heat Flow in Cryogenic Testing

The James Webb Space Telescope (JWST) is an upcoming flagship observatory mission scheduled to be launched in 2018. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. The requirement for multiple thermal zoned results in the instruments being thermally connected to five external radiators via individual high purity aluminum heat straps. Thermal-vacuum and thermal balance testing of the flight instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center's (GSFC) Space environment Simulator (SES). The flight external radiators are not available during ISIM-level thermal vacuum/thermal testing, so they will be replaced in test with stable and adjustable thermal boundaries with identical physical interfaces to the flight radiators. Those boundaries are provided by specially designed test hardware which also measures the heat flow within each of the five heat straps to an accuracy of less than 2 mW, which is less than 5% of the minimum predicted heat flow values. Measurement of the heat loads to this accuracy is essential to ISIM thermal model correlation, since thermal models are more accurately correlated when temperature data is supplemented by accurate knowledge of heat flows. It also provides direct verification by test of several high-level thermal requirements. Devices that measure heat flow in this manner have historically been referred to a "Q-meters". Perhaps the most important feature of the design of the JWST Q-meters is that it does not depend on the absolute accuracy of its temperature sensors, but rather on knowledge of precise heater power required to maintain a constant temperature difference between sensors on two stages, for which a table is empirically developed during a calibration campaign in a small chamber at GSFC. This paper provides a brief review of Q-meter design, and discusses the Q-meter calibration procedure including calibration chamber modifications and accommodations, handling of differing conditions between calibration and usage, the calibration process itself, and the results of the tests used to determine if the calibration is successful.

Comber, Brian↗

James Webb Space Telescope Observations of Stellar Occultations by Solar System Bodies and Rings

In this paper, we investigate the opportunities provided by the James Webb Space Telescope (JWST) for significant scientific advances in the study of Solar System bodies and rings using stellar occultations. The strengths and weaknesses of the stellar occultation technique are evaluated in light of JWST's unique capabilities. We identify several possible JWST occultation events by minor bodies and rings and evaluate their potential scientific value. These predictions depend critically on accurate a priori knowledge of the orbit of JWST near the Sun–Earth Lagrange point 2 (L2). We also explore the possibility of serendipitous stellar occultations by very small minor bodies as a byproduct of other JWST observing programs. Finally, to optimize the potential scientific return of stellar occultation observations, we identify several characteristics of JWST's orbit and instrumentation that should be taken into account during JWST's development.

Santos-Sanz, P.↗

An Overview of the James Webb Space Telescope (JWST) Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

An Overview of the James Webb Space Telescope (JWST) Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

Optical Modeling Activities for NASA's James Webb Space Telescope (JWST): V. Operational Alignment Updates

This paper is part five of a series on the ongoing optical modeling activities for the James Webb Space Telescope (JWST). The first two papers discussed modeling JWST on-orbit performance using wavefront sensitivities to predict line of sight motion induced blur, and stability during thermal transients. The third paper investigates the aberrations resulting from alignment and figure compensation of the controllable degrees of freedom (primary and secondary mirrors), which may be encountered during ground alignment and on-orbit commissioning of the observatory, and the fourth introduced the software toolkits used to perform much of the optical analysis for JWST. The work here models observatory operations by simulating line-of-sight image motion and alignment drifts over a two-week period. Alignment updates are then simulated using wavefront sensing and control processes to calculate and perform the corrections. A single model environment in Matlab is used for evaluating the predicted performance of the observatory during these operations.

Howard, Joseph M.↗

EMC Test Challenges for NASA's James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

McCloskey, John↗

EMC Test Challenges for NASAs James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetics↗

James Webb Space Telescope Navigation Optimization Challenges

This paper details the orbit determination, solar radiation pressure (SRP) modeling, and station-keeping maneuver planning for the NASA James Webb Space Telescope during the routine science phase of the mission. The complexities of SRP modeling driven by the vehicle’s large area, attitude profile, and attitude constraints for maneuver execution entail unique challenges for spaceflight navigation. The techniques utilized to combine predictive attitude and maneuver targeting modeling were refined using the experiences and data accumulated during and following the commissioning phase. The Navigation Team at NASA Goddard Space Flight Center’s Flight Dynamics Facility responded to these challenges and implemented methods for trajectory optimization and improving maneuver efficiency.

Flight Dynamics↗

James Webb Space Telescope Navigation Optimization Challenges

This paper details the orbit determination, solar radiation pressure (SRP) modeling, and station-keeping maneuver planning for the NASA James Webb Space Telescope during the routine science phase of the mission. The complexities of SRP modeling driven by the vehicle’s large area, attitude profile, and attitude constraints for maneuver execution entail unique challenges for spaceflight navigation. The techniques utilized to combine predictive attitude and maneuver targeting modeling were refined using the experiences and data accumulated during and following the commissioning phase. The Navigation Team at NASA Goddard Space Flight Center’s Flight Dynamics Facility responded to these challenges and implemented methods for trajectory optimization and improving maneuver efficiency.

Flight Dynamics↗

Repurposing the James Webb Space Telescope’s center of curvature optical bench hexapod for future mirror calibration testing at NASA Marshall’s x-ray & cryogenic facility

The James Webb Space Telescope’s (JWST) center of curvature optical bench (CoCOB) hexapod was repurposed to enhance NASA Marshall Space Flight Center’s X-Ray & Cryogenic Facility (XRCF) optical metrology capabilities. This upgrade unlocked higher test article load capacity and extended the allowable ranges of motion of the CoCOB hexapod. The hexapod was also coupled to a new long-stroke, linear motion axis to form a 7 degrees of freedom system and allow for high precision testing of larger diameter test articles. A 9 degrees of freedom motion system, consisting of a three-axis linear mount in an X-Y-Z configuration and a commercially available hexapod, was also designed to allow high resolution positioning of the focal plane instrumentation over a large range of motion. A modern control architecture and graphical user interface was developed for the CoCOB hexapod and additional motion stages to permit streamlined commanding and operation. This paper discusses the justification for re-using the CoCOB hexapod by highlighting its unique precision motion control capabilities in a high vacuum and optically clean environment. The design, key component selection, and environmental compatibility for each of the additional motion stages is presented along with testing results for achieved range, repeatability, and minimum step size performance for all motion axes. Finally, a summary of the motion control system architecture and its flexibility to address tomorrow’s optical metrology needs are presented.

hexapod↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Vacuum Thermal Balance Test Campaign at NASA's Goddard Space Flight Center

The James Webb Space Telescope is a large infrared telescope with a 6.5-meter primary mirror, designed as a successor to the Hubble Space Telescope when launched in 2018. Three of the four science instruments contained within the Integrated Science Instrument Module (ISIM) are passively cooled to their operational temperature range of 36K to 40K with radiators, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the ISIM element level has taken place in three separate highly challenging and extremely complex thermal tests within a gaseous helium-cooled shroud inside Goddard Space Flight Centers Space Environment Simulator. Special data acquisition software was developed for these tests to monitor over 1700 flight and test sensor measurements, track over 50 gradients, component rates, and temperature limits in real time against defined constraints and limitations, and guide the complex transition from ambient to final cryogenic temperatures and back. This extremely flexible system has proven highly successful in safeguarding the nearly $2B science payload during the 3.5-month-long thermal tests. Heat flow measurement instrumentation, or Q-meters, were also specially developed for these tests. These devices provide thermal boundaries o the flight hardware while measuring instrument heat loads up to 600 mW with an estimated uncertainty of 2 mW in test, enabling accurate thermal model correlation, hardware design validation, and workmanship verification. The high accuracy heat load measurements provided first evidence of a potentially serious hardware design issue that was subsequently corrected. This paper provides an overview of the ISIM-level thermal-vacuum tests and thermal objectives; explains the thermal test configuration and thermal balances; describes special measurement instrumentation and monitoring and control software; presents key test thermal results; lists problems encountered during testing and lessons learned.

JWST ISIM Thermal↗

XML: James Webb Space Telescope Database Issues, Lessons, and Status

This paper will present the current concept using extensible Markup Language (XML) as the underlying structure for the James Webb Space Telescope (JWST) database. The purpose of using XML is to provide a JWST database, independent of any portion of the ground system, yet still compatible with the various systems using a variety of different structures. The testing of the JWST Flight Software (FSW) started in 2002, yet the launch is scheduled for 2011 with a planned 5-year mission and a 5-year follow on option. The initial database and ground system elements, including the commands, telemetry, and ground system tools will be used for 19 years, plus post mission activities. During the Integration and Test (I&T) phases of the JWST development, 24 distinct laboratories, each geographically dispersed, will have local database tools with an XML database. Each of these laboratories database tools will be used for the exporting and importing of data both locally and to a central database system, inputting data to the database certification process, and providing various reports. A centralized certified database repository will be maintained by the Space Telescope Science Institute (STScI), in Baltimore, Maryland, USA. One of the challenges for the database is to be flexible enough to allow for the upgrade, addition or changing of individual items without effecting the entire ground system. Also, using XML should allow for the altering of the import and export formats needed by the various elements, tracking the verification/validation of each database item, allow many organizations to provide database inputs, and the merging of the many existing database processes into one central database structure throughout the JWST program. Many National Aeronautics and Space Administration (NASA) projects have attempted to take advantage of open source and commercial technology. Often this causes a greater reliance on the use of Commercial-Off-The-Shelf (COTS), which is often limiting. In our review of the database requirements and the COTS software available, only very expensive COTS software will meet 90% of requirements. Even with the high projected initial cost of COTS, the development and support for custom code over the 19-year mission period was forecasted to be higher than the total licensing costs. A group did look at reusing existing database tools and formats. If the JWST database was already in a mature state, the reuse made sense, but with the database still needing to handing the addition of different types of command and telemetry structures, defining new spacecraft systems, accept input and export to systems which has not been defined yet, XML provided the flexibility desired. It remains to be determined whether the XML database will reduce the over all cost for the JWST mission.

Detter, Ryan↗

Wavefront Control Toolbox for James Webb Space Telescope Testbed

We have developed a Matlab toolbox for wavefront control of optical systems. We have applied this toolbox to the optical models of James Webb Space Telescope (JWST) in general and to the JWST Testbed Telescope (TBT) in particular, implementing both unconstrained and constrained wavefront optimization to correct for possible misalignments present on the segmented primary mirror or the monolithic secondary mirror. The optical models implemented in Zemax optical design program and information is exchanged between Matlab and Zemax via the Dynamic Data Exchange (DDE) interface. The model configuration is managed using the XML protocol. The optimization algorithm uses influence functions for each adjustable degree of freedom of the optical mode. The iterative and non-iterative algorithms have been developed to converge to a local minimum of the root-mean-square (rms) of wavefront error using singular value decomposition technique of the control matrix of influence functions. The toolkit is highly modular and allows the user to choose control strategies for the degrees of freedom to be adjusted on a given iteration and wavefront convergence criterion. As the influence functions are nonlinear over the control parameter space, the toolkit also allows for trade-offs between frequency of updating the local influence functions and execution speed. The functionality of the toolbox and the validity of the underlying algorithms have been verified through extensive simulations.

Shiri, Ron↗

The Meteoroid Environment Encountered By the James Webb Space Telescope

All spacecraft run the risk of being damaged by meteoroids at a rate proportional to the spacecraft's surface area. The exceptionally large James Webb Space Telescope (JWST) has endured 20 impacts on its primary mirror in its first year of operation. While most of the impacts experienced were commensurate with pre-launch predictions, one particularly large impact in May 2022 prompted the program to take a fresh look at the meteoroid environment in order to determine whether potentially unaccounted-for meteoroid risks can be mitigated. In this talk, we present a directional model of the meteoroid environment encountered by the spacecraft and compare it with the observed impact rate. Because of JWST’s ability to measure nanometer-size changes to the primary mirror surface, our results indicate that meteoroids carrying as little as 1 Joule of kinetic energy can produce measurable effects. We also find that the impact rate is highest when JWST faces in the direction of orbital motion about the Sun. By implementing a "meteoroid avoidance zone" that discourages observations within 75° of the ram direction, we estimate that JWST has reduced the impact rate by more than half.

Althea Moorhead↗

Optical Modeling Activities for NASA's James Webb Space Telescope (JWST): Wavefront Aberrations due to Alignment and Figure Compensation - 3

This is part three of a series describing the ongoing optical modeling activities for James Webb Space Telescope (JWST). The first two discussed modeling JWST on-orbit performance using wavefront sensitivities to predict line of sight motion induced blur, and stability during thermal transients. The work here investigates the aberrations resulting from alignment and figure compensation of the controllable degrees of freedom (primary and secondary mirrors), which may be encountered during ground alignment and on-orbit commissioning of the observatory. The optical design of the telescope is a three-mirror anastigmat, with an active fold mirror at the exit pupil for fine guiding. The primary mirror is over 6.5 meters in diameter, and is composed of 18 hexagonal segments that can individually positioned on hexapods, as well as compensated for radius of curvature. This effectively gives both alignment and figure control of the primary mirror. The secondary mirror can be moved in rigid body only, giving alignment control of the telescope. The tertiary mirror is fixed, however, as well as the location of the science instrumentation. Simulations are performed of various combinations of active alignment corrections of component figure errors, and of primary mirror figure corrections of alignment errors. Single field point and moderate field knowledge is assumed in the corrections. Aberrations over the field are reported for the varying cases, and examples presented.

Howard, Joseph↗

James Webb Space Telescope (JWST): The First Light Machine

This slide presentation review the mission objective, the organization of the mission planning, the design, and testing of the James Webb Space Telescope (JWST). There is also information about the orbit, in comparison to the Hubble Space Telescope, the mirror design, and the science instruments. Pictures of the full scale mockup of the JWST are given. A brief history of the universe is also presented from the big bang through the formation of galaxies, and the planets, to life itself. One of the goals of the JWST is to search for extra solar planets and then to search for signs of life.

Stahl, Philip↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Balance/Thermal Vacuum Test Configuration and Test Planning at NASA's Goddard Space Flight Center

The James Webb Space Telescope (JWST) is the next of the great observatories , scheduled to be launched in 2014. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center s (GSFC) Space Environment Simulator (SES). The test enclosure surrounding the instruments during the integrated ISIM-level thermal balance testing is complex, and is designed to simulate as closely as possible the in-flight conductive and radiative thermal environment around the ISIM. Thermal control and measurement of parasitic sources of heat leak into the test volume is critical, as the dissipation plus known parasitics in the flight ISIM is approximately 454 mW, and additional parasitics attributed to the flight enclosure itself are nearly equal to this, resulting in the energy balance of the inflight ISIM being less than 1.0 W. Sources of test-induced parasitics must be carefully controlled and measured, and the ability to thermally control the test environment is critical to enable accurate thermal balance testing and thermal model correlation. This paper describes the test configuration and plans for the ISIM-level thermal vacuum/thermal balance testing at GSFC.

Glazer, Stuart↗

James Webb Space Telescope (JWST) Project Status for the AIAA Working Group on Space Simulation

This brief presentation discusses developments in the design of the James Webb Space Telescope (JWST). The JWST master schedule is provided and its system architecture is described. Instruments include the Near Infrared Camaera, Near Infrared Spectrograph, Mid-Infrared Instrument, and the Fine Guidance Sensor. Compared to other telescopes the JWST has a 2.7 longer wavelength than the Hubble Telescope (HST), 38 times better sensitivity at K band that the HST NICMOS, and 8-24 times better angular resolution than the Spitzer Telescope. among other features. Engineering or verification models for all telescope instruments are being assembled and tested in the current year. Currently, good progress continues to be made on critical path items and the JWST is on track for a June 2013 launch.

Sabelhaus, Phil↗