Search NASA⌕ Search

SEARCH · Search NASA

Results for “LEASES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Development of an In-Situ Method for Cable Condition Monitoring in Nuclear Power Plants (SBIR Phase IIB Final Report)

This is the final report of a Small Business Innovation Research (SBIR) project that Analysis and Measurement Services Corporation (AMS) has conducted for the U.S. Department of Energy (DOE) over a seven-and-a-half year period (February 2013 through April 2020 with the awards of Phase I, Phase II and Phase IIB projects). The goal of the project was to design, develop, validate, and demonstrate a technique for in-situ testing of cable insulation polymers that will identify, locate, and provide the degree of aging for cables commonly used in nuclear power plants. During the Phase I project, AMS established that the frequency domain reflectometry (FDR) technique can successfully identify and measure cable insulation degradation that can be trended with aging. In Phase II, AMS performed extensive cable aging studies to correlate FDR measurements with other laboratory condition monitoring techniques and developed aging condition categories to quantify the severity of insulation degradation. In Phase IIB, the project expanded the research to include a wider variety of cable polymers that are used in the commercial nuclear power industry. This work also involved developing acceptance criteria to objectively assess age-related cable degradation while sharing the results of this research with industry, academia, and national laboratories to advance the state of the art in cable aging management technologies. The products developed under this research project provide the nuclear industry with an effective condition monitoring tool to support safe and long-term plant operation. Throughout the project, collaborations and support were received from a variety of industry organizations and individuals including DOE National Laboratories as well as nuclear plant utilities and several other industry experts and cable manufacturers. Contributions from these organizations included the donation of new cables, naturally aged cables, and research collaboration. The validation and commercialization of the products of this project were achieved through opportunities to test and demonstrate the technologies’ capabilities on-site at nuclear power generation and research facilities as well as in the laboratory alongside industry peers and cable testing service companies. The research resulted in a technology that can be used to identify, locate, and quantify age-related degradation in several types of cable polymers. This included developing software and hardware as well as the methodology for using the FDR technique to assess age-related degradation of installed cables. The technology developed under this project can provide nuclear plant management, engineers, and technicians with an in-situ electrical test method to determine if in-service cables need to be replaced, monitored on a periodic basis, or show no evidence of significant age-related degradation that may require action. Near the end of this Phase IIB project, the FDR product was sold to a nuclear power utility in South Korea. This sale of a dedicated aging assessment tool is the beginning of a comprehensive contract with the expectation of twelve (12) units sold to that country. Additionally, the FDR technology has been sold to several industry organizations including a nuclear research institute and the Diablo Canyon nuclear power plant. This technology is also being leased by other nuclear industry service companies for incorporation into aging management programs. The cable testing technology that was developed under this project was also integrated into a comprehensive cable aging assessment service that is being offered to the nuclear industry at the request of U.S. nuclear utilities and is currently part of onsite testing services provided by AMS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

OWL Change Control Process

The Online Waste Library (OWL) provides a consolidated source of information on Department of Energy-managed radioactive waste likely to require deep geologic disposal. With the release of OWL Version 1.0 in fiscal year 2019 (FY2019), much of the FY2020 work involved developing the OWL change control process and the OWL release process. These two processes (in draft form) were put into use for OWL Version 2.0, which was released in early FY2021. With the knowledge gained, the OWL team refined and documented the two processes in two separate reports. This report focuses on the change control process and discusses the following: (1) definitions and system components; (2) roles and responsibilities; (3) origin of changes; (4) the change control process including the Change List, Task List, activity categories, implementation examples, and checking and review; and (5) the role of the re lease process in ensuring changes in the Change List are incorporated into a public release.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

Southeast Regional Carbon Sequestration Partnership Phase III Early Test

DOE has prepared an Environmental Assessment (EA), DOE/EA-1625, titled “Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Early Test” for a proposed project in which DOE would provide co-funding. The project would inject and closely monitor the flow of approximately 1.7 million short tons (1.5 million metric tons) of supercritical carbon dioxide (CO 2 ) into the brine-bearing Tuscaloosa Formation in an area within the lease boundaries of the Cranfield Unit oilfield, about 12 miles (19 kilometers (km)) east of Natchez, Mississippi. The project team would be led by the Southern States Energy Board (SSEB) and include the Texas Bureau of Economic Geology (BEG) at the University of Texas at Austin as a subcontractor. The host site for the proposed project is owned by Denbury Resources International Company (Denbury). This field experiment is known as the SECARB Phase III Early Test Project. The proposed injection period for this Phase III Early Test is 18 months, followed by at least one year of post-injection monitoring.

02 PETROLEUM↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

Tailored Fiber Placement for Complex Preforms

Tailored Fiber Placement (TFP) offers a novel approach to optimize fiber architecture for the fabrication of complex, structural parts not traditionally suitable for advanced composites. This technology not only offers new routes for weight reduction via metal substitution, it also offers cost reduction through minimization of material scrap and reduced labor. This reduction in component weight leads to increased fuel efficiency, and reduced production energy consumption, thereby, helping to achieve the stated IACMI technical goals. This technology leverages centuries of manufacturing development in support of the textile and embroidery industry. One major drawback to this technology is the lack of commercial or non- proprietary structural performance data and robust analytical tools used to optimize fiber architecture and predict performance. This project was structured to utilize common sub-element features to validate analytical performance tools, generate performance data, and gather cost and performance data on components of interest. This project was designed to give industry sponsors the confidence and ability to take full advantage of TFP to fabricate primary, highly loaded structure and integrate features such as metallic fasteners. The project focused principally on the use of high strength carbon fiber, such as T700, and the use of aerospace epoxy resin matrix to primarily support development of new composite applications in vehicle, aerospace, and industrial markets. This project applied previously developed analytical tools to predict the performance of TFP produced parts. This work focused on developing the pipeline to characterize material in order to accurately predict component performance when modifying the TFP print paths and stitch density. This focused on experimental characterization via standardized ASTM testing, alongside experimental testing of more representative service components by testing curved beam strength, beam shear performance, a large scale TFP lug, and ultimately designing a fully TFP clip bracket that reduced weight and cost compared to a traditional metallic component. The new knowledge gained from this program included: 1) development and demonstration of novel analytical tools applied to analysis of TFP preforms; 2) development and demonstration of a building block approach using coupons and sub-elements to optimize the design of a more complex component; 3) demonstration that optimized fiber orientation using TFP can exceed performance of conventional textile composite materials and can open new applications currently limited to metallic components; 4) Demonstration of performance and cost benefits of the TFP process as compared to metallic and conventional textile composites. Recommendations for follow-on work include development of design allowables to assess the impact of high temperature/moisture exposure or saturation during loading, tracking the impact of stitching needle wear on the performance of parts and ability to stitch thicker preforms, using TFP preforms as local reinforcement at areas of bearing or complex loading, and topology optimization of components by tow steering. The expertise developed during the course of this project can be leveraged to provide commercial engineering design and fabrication services using TFP. UDRI is in the process of formalizing their partnership with Spintech, who will serve as the commercialization partner for this technology and provide molding services and deliver finished components to the end user. UDRI will continue to produce the preforms until the economics allow Spintech to procure its own TFP equipment or lease UDRI equipment, at which point UDRI will step away from manufacture and serve as the engineering and design lead on product development.

36 MATERIALS SCIENCE↗

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.

14 SOLAR ENERGY↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Assessment of the Ocean Renewable Energy Resources in the US Gulf of Mexico

This study was conducted by the National Renewable Energy Laboratory (NREL) and funded by the Bureau of Ocean Energy Management (BOEM). It provides a comprehensive feasibility assessment of multiple offshore renewable energy technologies in the Gulf of Mexico (GoM) to inform BOEM's strategic plans related to possible Outer Continental Shelf alternative energy leasing activities in the GoM. In coordination with Gulf Coast states, the study includes some information on offshore renewable energy potential in state waters for future energy planning. The goal of the study is to survey potential offshore renewable energy sources in the GoM and quantify their feasibility relating to resource adequacy, technology maturity, and the potential for competitive cost. The study provides a review of available technologies and concepts for generating offshore renewable energy, including a high-level assessment of the current state of each technology and its potential for future advances. It provides a breakdown of resource capacity for each renewable energy technology and a recommendation that offshore wind be pursued for future study as the most promising technology. The renewable technologies that were considered include offshore wind, wave energy, tidal energy, ocean current energy, offshore solar energy, ocean thermal energy conversion (OTEC), cold water source cooling, and hydrogen (as a storage medium to utilize existing pipeline infrastructure). The resource capacity for each of these renewable energy sources was quantified for both the gross resource capacity potential (gross resource) and the technical resource capacity potential (technical resource) using the methodology described in an earlier NREL report. Many of these sources are very immature from a commercial perspective, which makes some of the comparisons difficult. In many cases, new methods were developed to estimate nominal power density for each technology type, which were necessary to convert the resource areas into deployable gross and technical resource capacity potentials.

17 WIND ENERGY↗

Lidar Buoy Data Dictionary: For the 2020 – 2021 California Deployments

Pacific Northwest National Laboratory (PNNL) manages two AXYS WindSentinel™ buoys (Buoys #120 and #130) on behalf of the U.S. Department of Energy (DOE) that collect a comprehensive set of meteorological and oceanographic (metocean) data to support resource characterization for wind energy offshore. The buoys have been deployed off the California coast in partnership with the Bureau of Ocean Energy Management (BOEM) from September 2020 through October 2021. One buoy was deployed within the Morro Bay Call Area offshore central California; the other buoy was deployed within the Humboldt Call Area off the coast of northern California. The measurements from the buoys are used to characterize the metocean conditions near potential locations for offshore wind lease areas and are uploaded to DOE’s Data Archive and Portal (DAP). Plots are updated on the DAP webpage to visualize the recent metocean measurements. This document serves as a data dictionary – or reference guide – for understanding and interpreting the data available from the buoys. This document includes: (1) specifications for the buoy instrumentation (Section 2.0) (2) description of each plot and definition of measured parameters (Section 3.0) (3) description of data files and naming convention (Appendix A) (4) reference guide of measurements and variables (Appendix B).

17 WIND ENERGY↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

ORNL FY22 NCSP Time-of-Flight Measurement [Slides]

This presentation covers the ORNL FY22 NCSP Time-of-Flight measurements. Key take-aways from this presentation include that the process was initiated in FY22. The Lease starts Mar. FY23 (delayed). Finally, that there has been a 30% increase in cost to sample fabrication.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assessing Impacts of Waves on Hub-Height Winds off the U.S. West Coast Using Lidar Buoys and Coupled Modeling Approaches

Given the importance of offshore wind energy development to the U.S. clean energy targets, it is vital to be able to characterize the wind resource in that environment accurately. Toward that end, two Bureau of Ocean Energy Management buoys equipped with Doppler lidar are being maintained by Pacific Northwest National Laboratory on behalf of the Department of Energy and deployed to regions of potential offshore wind development. In addition to standard meteorological and oceanographic measurements, the buoys document the wind profile between about 40 m and 250 m above the sea surface through Doppler lidar retrievals. After a multiyear deployment of two buoys along the U.S. East Coast, the buoys were redeployed to the U.S. West coast from 2020 – 2022 to locations near the Humboldt and Morro Bay lease areas. The buoys provide nearly continuous, multiyear datasets that can be used to evaluate predictions of hub-height (~100 m) wind speed for standard atmospheric models in the region. In the absence of measurements at the study site, offshore wind developers rely on model-based data to assess site conditions. Potential sources of model error in this environment include under-resolution or misrepresentation of coastal topographically forced flows, marine boundary layer dynamics and the evolution of their associated cloud and turbulence fields, the role of upwelling and other currents on surface heat fluxes into the boundary layer, and the impact of wave fields on surface momentum fluxes and thus the wind speed profile. In particular, most predictive models of wind speed do not predict wave fields at all, relying on parameterizations to represent their effects. In thus study, we focus on evaluating the role of wind / wave interactions on modeled hub-height wind speed and error by using the Coupled Ocean–Atmosphere–Wave–Sediment–Transport Modeling System to capture two-way interactions between an atmospheric model (Weather Research and Forecasting (WRF)) and a wave model (WAVEWATCHIII (WW3)) and compare to both stand-alone WRF and one-way coupled WRF / WW3 configurations. Our approach is similar to that used in Gaudet et al. (2022) to evaluate wind / wave coupling over the U.S. East Coast, but applied to the very different environment of the U.S. West Coast. We show examples for two cases, a cold-season frontal case and a warm-season low-level jet case. We find that wind / wave coupling makes little impact on model error for these cases at the location of the lidar buoys, for which other misrepresentations of model physics seems to be responsible for model-observation discrepancies. However, domain-wide evaluations, which also make use of the National Buoy Data Center network, show that a two-way coupling approach is less prone to systematic errors in the hub-height wind field than the one-way coupled approach. WRF resolution of kilometer-scale or less is needed to properly capture the sharp wind speed gradients that can be found along the coastline, and WW3 simulations driven by the downscaled WRF produce better bulk and spectral wave fields when compared to observations. Implications of the results for wind resource characterization are then discussed.

17 WIND ENERGY↗

OSW Consortium 2 - Validated National Offshore Wind Resource Dataset with Uncertainty Quantification (CRADA Report)

This research has led to the development of the 2023 National Offshore Wind data set (NOW-23), which offers the latest wind resource information for offshore regions in the United States. NOW-23 supersedes, for its offshore component, the Wind Integration National Dataset (WIND) Toolkit, which was published a decade ago and is currently a primary resource for wind resource assessments and grid integration studies in the contiguous United States. By incorporating advancements in the Weather Research and Forecasting (WRF) model, NOW-23 delivers an updated and cutting-edge product to stakeholders. As part of this project, we also developed a summary of the uncertainty quantification in NOW-23, along with NOW-WAKES, a 1-year post-construction data set that quantifies expected offshore wake effects in the US Mid-Atlantic lease areas. Stakeholders can access the NOW-23 data set at https://doi.org/10.25984/1821404.

17 WIND ENERGY↗