At least 253 records · Page 14

Develop and test fuel cell powered on-site integrated total energy system

Satisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evauated under Task V (now completed); T2107RS and C70-2RS.

Kaufman, A.↗

Test facilities for high power electric propulsion

Electric propulsion has applications for orbit raising, maneuvering of large space systems, and interplanetary missions. These missions involve propulsion power levels from tenths to tens of megawatts, depending upon the application. General facility requirements for testing high power electric propulsion at the component and thrust systems level are defined. The characteristics and pumping capabilities of many large vacuum chambers in the United States are reviewed and compared with the requirements for high-power electric-propulsion testing.

Sovey, James S.↗

NSTAR Ion Thruster and Breadboard Power Processor Functional Integration Test Results

A 2.3 kW Breadboard Power Processing Unit (BBPPU) was developed as part of the NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) Program. The NSTAR program will deliver an electric propulsion system based on a 30 cm xenon ion thruster to the New Millennium (NM) program for use as the primary propulsion system for the initial NM flight. The final development test for the BBPPU, the Functional Integration Test, was carried out to demonstrate all aspects of BBPPU operation with an Engineering Model Thruster. Test objectives included: (1) demonstration and validation of automated thruster start procedures, (2) demonstration of stable closed loop control of the thruster beam current, (3) successful response and recovery to thruster faults, and (4) successful safing of the system during simulated spacecraft faults. These objectives were met over the specified 80-120 VDC input voltage range and 0.5-2.3 output power capability of the BBPPU. Two minor anomalies were noted in discharge and neutralizer keeper current. These anomalies did not affect the stability of the system and were successfully corrected.

Hamley, John A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Satisfactory performance is reported for the first three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33m x 0.56m). Construction of a 5 kW equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.

Source record↗

Power Actuation and Switching Module Test Results

The X2000 Power System Electronics (PSE) is a Jet Propulsion Laboratory (JPL) task to develop a new generation of power system building blocks for use on future deep-space missions. The effort includes the development of electronic components and modules that can be used as building blocks in the design of generic spacecraft power systems. All X2000 avionics components and modules are designed for use in centralized or distributed spacecraft architectures. The Power Actuation and Switching Module (PASM) has been developed under the X2000 program. This component enables a modular and scalable design approach for power switching applications, which can result in a wide variety of power switching architectures using this simple building block. The PASM is designed to provide most of the necessary power switching functions of spacecraft for various Deep Space missions including future missions to Mars, comets, Jupiter and its moons. It is fabricated using an ASIC process that is tolerant of high radiation. The development included two application specific integrated circuits (ASICs) and support circuitry all packaged using High Density Interconnect (HDI) technology. It can be operated in series or parallel with other PASMs. It can be used as a high-side or low-side switch and it can drive thruster valves, pyrotechnic devices such as NASA standard initiators, bus shunt resistors, and regular spacecraft component loads. Each PASM contains two independent switches with internal current limiting and over-current trip-off functions to protect the power subsystem from load faults. During turnon and turnoff each switch can limit the rate of current change (di/dt) to a value determined by the user. Three-way majority-voted On/Off commandability and full switch status telemetry (both analog and digital) are built into the module. This paper is a follow up to the one presented at he IECEC 2004 conference that will include the lessons learned and test results from the development.

X2000↗

Tank Tests of a Powered Model of a Compression Plane, NACA Model 171A-2

The compression plane is intended for operation on or close to the surface of the water, and has a hull with a concave bottom which forms the upper surface of a tunnel into which air is forced under pressure to support part of the load. The results of the tests made in Langley tank no. 1 include values of the horizontal forces, trimming moment, and static pressure in the tunnel for a wide range of loads and speeds and two power conditions, and are presented in the form of curves against speed with load as a parameter. The results are scaled up to 10 times the model size for three conditions at which the model is self-propelled at a steady speed. Lift is obtained from the static pressure of air in the tunnel. In general, the ratio of the gross load to the total resistance increases with increase in load and decrease in speed. This ratio varies between l-7 and 5.7 at high speeds and has a maximum value of 7. The total resistance is nearly the same for both power conditions except at low speeds and heavy loads. No abrupt change in forces on the hull or flow around the hull occurs in. the region of zero draft. The centers of pressure are generally far aft. At the most efficient trim (1.2'), considerable bow-up moment would be required for practicable operation. There is no abrupt transition from the air-borne to the water- borne condition.

Mottard, Elmo J.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.

Source record↗

NASA wiring for space applications program test results

The electrical power wiring tests results from the NASA Wiring for Space Applications program are presented. The goal of the program was to develop a base for the building of a lightweight, arc track-resistant electrical wiring system for aerospace applications. This new wiring system would be applied to such structures as pressurized modules, trans-atmospheric vehicles, LEO/GEO environments, and lunar and Martian environments. Technological developments from this program include the fabrication of new insulating materials, the production of new wiring constructions, an improved system design, and an advanced circuit protection design.

Stavnes, Mark↗

Signal and power roll ring testing update

The development of the roll ring as a long-life, low-torque alternative to the slip ring is discussed. A roll ring consists of one or more circular flexures captured by their own spring force in the annular space between two concentric conductors or contact rings. The advantages of roll rings over other types of electrical transfer devices are: extremely low drag torque, high transfer efficiencies in high-power configurations, extremely low wear debris generation, long life, and low weight for high-power applications.

Smith, Dennis W.↗

The Space Station Module Power Management and Distribution automation test bed

The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

Lollar, Louis F.↗

Best Practices: Power Quality and Integrated Testing at JSC

This presentation discusses Best Practices for Power Quality and Integrated Testing at JSC in regards to electrical systems. These high-level charts include mostly generic information; however, a specific issue is discussed involving flight hardware that could have been discovered prior to flight with an integrated test.

Davis, Lydia↗

Flight Testing of Hybrid Powered Vehicles

Hybrid Rocket powered vehicles have had a limited number of flights. Most recently in 2004, Scaled Composites had a successful orbital trajectory that put a private vehicle twice to over 62 miles high, the edge of space to win the X-Prize. This endeavor man rates a hybrid system. Hybrids have also been used in a number of one time launch attempts - SET-1, HYSR, HPDP. Hybrids have also been developed for use and flown in target drones. This chapter discusses various flight-test programs that have been conducted, hybrid vehicles that are in development, other hybrid vehicles that have been proposed and some strap-on applications have also been examined.

Story, George↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Two 25-cell, 13 inch x 23 inch (4kW) stacks were started up to evaluate the reliability of component and stack technology developed through the end of 1983. Both stacks started up well and are running satisfactorily on hydrogen-air after 1900 hours and 800 hours, respectively. A synthetic-reformat mixing station is nearing completion, and both stacks will be operated on reformate fuel. A stack-protection control system was placed in operation for Stack No. 2, and a similar set-up is in preparation for Stack No. 1. This system serves to change operating conditions or shut the stack down to avoid deleterious effects from nonstack-related upsets. The capability will greatly improve changes of obtaining meaningful long-term test data.

Kaufman, A.↗