Future Air Traffic Growth and Schedule Model User's Guide

The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

Kimmel, William M.↗

Future Air Traffic Growth and Schedule Model, Supplement

The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

Kimmel, William M.↗

Experiences in using modal synthesis within project requirements

Modal synthesis methods were developed for use by engineers for cost-effective solutions of large structural dynamics problems. Different methods were proposed by various investigators based upon comparative solutions of relatively simple structures using different forms of displacement functions. The application of modal synthesis methods to a large complex structure in a project environment is described. The considerations include analysis, hardware interfaces, schedules, tests, resources, and other project requirements. Good technical results were obtained through the use of an integrated analysis/test modal synthesis on both substructures and systems.

Garba, J. A.↗

Development of the ITACA Network Loading Analysis Tool's Scheduling Techniques

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by creating analysis capabilities which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. The Integrated Tradespace Analysis of Communications Architectures (ITACA) will provide an all-in-one package for various analysis capabilities that normally require add-ons or multiple tools to complete. The ITACA tool will be responsible for assessing the given network architecture and generating a schedule for the missions as well as the assets. ITACA will allow users to evaluate the quality of service of a given network and determine whether or not the network will satisfy the mission's requirements. ITACA is currently under development, and during the spring of 2018 major development in the tools scheduling techniques were completed. A total of seven different techniques were completed.

space communications↗

Explanation of Change Cost and Schedule Growth Study Interim Status Briefing

This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects. A second goal was to determine the percentage of growth that was outside the control of the project. The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time. This briefing reviews the results of the study of the first 20 missions.

Croonce, Thomas↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

Formulation↗

Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

Depenbrock, Brett T.↗

Technology Assessment Requirements for Programs and Projects

Program/project uncertainty can most simply be defined as the unpredictability of its outcome. As might be expected, the degree of uncertainty depends substantially on program/project type. For hi-tech programs/projects, uncertainty all too frequently translates into schedule slips, cost overruns and occasionally even to cancellations or failures - consummations root cause of such events is often attributed to inadequate definition of requirements. If such were indeed the root cause, then correcting the situation would simply be a matter of requiring better requirements definition, but since history seems frequently to repeat itself, this must not be the case - at least not in total. There are in fact many contributors to schedule slips, cost overruns, project cancellations and failures, among them lack of adequate requirements definition. The case can be made, however, that many of these contributors are related to the degree of uncertainty at the outset of the project. And further, that a dominant factor in the degree of uncertainty is the maturity of the technology required to bring the project to fruition. This presentation discusses the concept of relating degrees of uncertainty to Technology Readiness Levels (TRL) and their associated Advancement Degree of Difficulty (AD2) levels. It also briefly describes a quantifiable process to establish the appropriate TRL for a given technology and quantifies through the AD2 what is required to move it from its current TRL to the desired TRL in order to reduce risk and maximize likelihood of successfully infusing the technology.

Bilbro, James W.↗

Cost and schedule management on the quiet short-haul research aircraft project

The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.

Wilcox, D. E.↗

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

A model to assess the Mars Telecommunications Network relay robustness

The relatively long mission durations and compatible radio protocols of current and projected Mars orbiters have enabled the gradual development of a heterogeneous constellation providing proximity communication services for surface assets. The current and forecasted capability of this evolving network has reached the point that designers of future surface missions consider complete dependence on it. Such designers, along with those architecting network requirements, have a need to understand the robustness of projected communication service. A model has been created to identify the robustness of the Mars Network as a function of surface location and time. Due to the decade-plus time horizon considered, the network will evolve, with emerging productive nodes and nodes that cease or fail to contribute. The model is a flexible framework to holistically process node information into measures of capability robustness that can be visualized for maximum understanding. Outputs from JPL's Telecom Orbit Analysis Simulation Tool (TOAST) provide global telecom performance parameters for current and projected orbiters. Probabilistic estimates of orbiter fuel life are derived from orbit keeping burn rates, forecasted maneuver tasking, and anomaly resolution budgets. Orbiter reliability is estimated probabilistically. A flexible scheduling framework accommodates the projected mission queue as well as potential alterations.

Mars Telecommunications Orbiter (MTO)↗

Computer-aided software development process design

The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

Lin, Chi Y.↗

A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test

Propulsion ground test facilities face the daily challenges of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Due to budgetary and schedule constraints, NASA and industry customers are pushing to test more components, for less money, in a shorter period of time. As these new rocket engine component test programs are undertaken, the lack of technology maturity in the test articles, combined with pushing the test facilities capabilities to their limits, tends to lead to an increase in facility breakdowns and unsuccessful tests. Over the last five years Stennis Space Center's propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and broken numerous test facility and test article parts. While various initiatives have been implemented to provide better propulsion test techniques and improve the quality, reliability, and maintainability of goods and parts used in the propulsion test facilities, unexpected failures during testing still occur quite regularly due to the harsh environment in which the propulsion test facilities operate. Previous attempts at modeling the lifecycle of a propulsion component test project have met with little success. Each of the attempts suffered form incomplete or inconsistent data on which to base the models. By focusing on the actual test phase of the tests project rather than the formulation, design or construction phases of the test project, the quality and quantity of available data increases dramatically. A logistic regression model has been developed form the data collected over the last five years, allowing the probability of successfully completing a rocket propulsion component test to be calculated. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),..,X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure. Logistic regression has primarily been used in the fields of epidemiology and biomedical research, but lends itself to many other applications. As indicated the use of logistic regression is not new, however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from the models provide project managers with insight and confidence into the affectivity of rocket engine component ground test projects. The initial success in modeling rocket propulsion ground test projects clears the way for more complex models to be developed in this area.

Messer, Bradley P.↗