Search NASA⌕ Search

SEARCH · Search NASA

Results for “Regulation Challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Regulatory Approach for Nuclear Thermal Propulsion Reactor Systems

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗

Regulatory Approach for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Line Distance Elements for Various Ibr Controllers and System Conditions

The large-scale penetration of inverter-based resources in power systems has challenged protection engineers because of the different fault behaviors these sources provide compared to conventional generation systems. The main challenges include a low level of fault current magnitude, unpredictable angles of sequence currents, and lack of inertia that can lead to maloperation of conventional phasor-based protection elements. This paper presents a sensitivity analysis of transmission line distance protection elements during phase-to-ground and phase-to-phase faults for different inverter controllers and power system conditions. It also summarizes which line protection elements remain secure near IBR terminations and identifies the ones affected by the inverter-based response. The paper concludes by highlighting that regulating negative-sequence current injection during the fault aids correct protection decisions, but does not address the entire challenge. Finally, alternative protection elements to those affected by the inverter fault response are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA International Environmental Partnerships

For nearly five decades, the National Aeronautics and Space Administration (NASA) has been preeminent in space exploration. NASA has landed Americans on the moon, robotic rovers on Mars, and led cooperative scientific endeavors among nations aboard the International Space Station. But as Earth's population increases, the environment is subject to increasing challenges and requires more efficient use of resources. International partnerships give NASA the opportunity to share its scientific and engineering expertise. They also enable NASA to stay aware of continually changing international environmental regulations and global markets for materials that NASA uses to accomplish its mission. Through international partnerships, NASA and this nation have taken the opportunity to look globally for solutions to challenges we face here on Earth. Working with other nations provides NASA with collaborative opportunities with the global science/engineering community to explore ways in which to protect our natural resources, conserve energy, reduce the use of hazardous materials in space and earthly applications, and reduce greenhouse gases that potentially affect all of Earth's inhabitants. NASA is working with an ever-expanding list of international partners including the European Union, the European Space Agency and, especially, the nation of Portugal. Our common goal is to foster a sustainable future in which partners continue to explore the universe while protecting our home planet's resources for future generations. This brochure highlights past, current, and future initiatives in several important areas of international collaboration that can bring environmental, economic, and other benefits to NASA and the wider international space community.

Lewis, Pattie↗

Advanced Reactor Safeguards Program Roadmap

The Advanced Reactor Safeguards (ARS) program was established in 2020 as part of appropriations for the Advanced Reactor Demonstration Program (ARDP) through the Office of Nuclear Energy in the Department of Energy. The goal of this program is to help address near term challenges that advanced nuclear reactor vendors face in meeting domestic Material Control and Accountancy (MC&A) and Physical Protection System (PPS) requirements for U.S. construction. Existing regulations for safeguards and security, as outlined in the Code of Federal Regulations, were written for large light water reactors, and some of the requirements are not suited to smaller, safer advanced reactor designs. The ARS program seeks to remove roadblocks in the deployment of new and advanced reactors by solving regulatory challenges, reducing safeguards and security costs, and utilizing the latest technologies and approaches for robust plant monitoring and protection. Safeguards and Security by Design (SSBD), or the consideration of safeguards and security requirements early in the design process, is an overarching principle that guides this program. This roadmap discusses the goals of the ARS program, current research, and program plan for the next five years.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Air Pollutant Emissions and Regulatory Implications of Co-Processing Raw Bio-Oil in U.S. Petroleum Refineries

Pyrolysis oil, often referred as bio-oil or biocrude, has attracted considerable attention because it has higher energy density and carbon content compared to the raw biomass. Using pyrolysis oil derived from low cost and underutilized biomass to produce renewable hydrocarbon fuels provides a viable link between the agriculture/forestry and (petro-) chemical industry. Co-processing bio-oil with vacuum gas oil (VGO) in petroleum refinery is appealing due to the relatively low capital requirement to retrofit refinery and the compatibility of fuel products with existing infrastructure. In order to implement co-processing, a petroleum refinery would need to consider several process modifications and therefore could be subject to varying levels of air permitting requirements based on bio-oil co-processing ratio, co-processing capacity in existing units, the amount of regulated pollutants expected to be emitted, among other factors. This analysis considers co-processing 5% (by weight) of raw bio-oil with VGO in the fluidized catalytic cracking (FCC) unit(s) in a petroleum refinery. We estimate the potential increase in emissions of regulated air pollutants resulting from the modifications required to implement bio-oil co-processing and evaluate the regulatory and permitting implications for three FCC size categories in the U.S. refineries, which could co-processes raw bio-oil to produce partially renewable transportation fuels. We also assess technically feasible emission control options petroleum refineries could adopt to avoid being subject to major source permitting requirements if the estimated increase in regulated air pollutant emission exceeds the applicable threshold for major modifications. Insights from our analysis can help overcome challenges and risks associated with timely obtaining air permits required to implement bio-oil co-processing in existing refineries. Our analysis also provides needed information for decision makers (e.g., local air quality agencies) to understand the potential air quality implications for retrofitting refineries to co-process bio-oil, particularly in areas with high concentration of petroleum refineries.

09 BIOMASS FUELS↗

Chapter 4: Aerospace Neurology

In the practice of medicine, the neurologist is called upon to answer the following questions: (1) Does the patient have neurologic disease? (2) If so, what is the localization of the lesion or lesions? (3) What is the pathophysiology of the process? (4) What is the preliminary differential diagnosis? Utilizing the tools of the neurologic and medical history, the neurologic examination, ancillary studies, and one’s education, training, and experience, the neurologist arrives at a diagnosis. The aerospace medicine physician (evaluator) has the additional challenge of relating the neurologic condition to aviation safety and achieving an appropriate aeromedical disposition. Whether it is the aviation medical examiner (AME), flight surgeon, or Federal Aviation Administration (FAA) regulator, the aerospace medicine physician shoulders the responsibility of a determination that may decide one’s career in aviation or spaceflight. Considering the individual, and yet preserving aerospace safety, is a never-ending challenge for the aerospace medicine physician. The evaluator has the dual responsibility of applying the standards and also considering exceptions to the standards in allowing waivers from standards, while assuring aerospace safety.

Joseph I Sirven↗

Multiple Grid-Forming Inverters in Black-Start: The Challenges

Black-start is a major challenge toward the successful operation of an islanded inverter-based system. In this article, the technical challenges for the black-start of multiple grid-forming inverters are reported. Specifically, this article discusses inverter synchronization, voltage and frequency regulation, and power-sharing between the grid-forming inverters. Experiment results from a multi-inverter test-bed have been provided to support the discussion. Furthermore, a grid-forming inverter controller for black-start operation is developed and presented in this article that addresses the discussed technical challenges. The performance of the developed controller in black-start operation is verified through experiment results.

Sadeque, Fahmid↗

Optimized molecular aggregation via incorporating fluorinated unit in the polymer donor for 17.3% efficiency organic solar cells

Regulating molecular aggregation state via chemical modification of photovoltaic materials to optimize the blend morphology is an effective and challenging strategy to improve the photovoltaic performance of organic solar cells (OSCs). Here, in this work, we demonstrate a random terpolymerization strategy by incorporating 1,3-bis(5-bromo-4-fluorothiophen-2-yl)-5,7-bis(2-ethylhexyl)-4H,8H-benzo[1,2-c:4,5-c']bisthiophene-4,8-dione (BFT, 30 mol%) unit with fluorinated π-bridges into the molecular backbone of PM6 and develop a terpolymer PF1. Benefiting from the strong electronegativity of fluorine atom and noncovalent interaction of F---S, the energy levels, molecular ordering, and aggregation properties of the polymer donors are precisely regulated. Notably, in the active layer film based on PF1: Y6, the π-π stacking distance can reduce to 3.51 Å, which is significantly smaller than that of PM6:Y6 (3.65 Å) and boosts the effective exciton dissociation and charge transport, thereby effectively optimize the photovoltaic properties of the related devices. As a result, the PF1:Y6-based OSCs achieved a power conversion efficiency (PCE) of up to 17.3%, which is much higher than that of the controlled OSCs based on PM6:Y6 (PCE = 16.2%). These results demonstrate high-efficiency OSCs enabled by regulating molecular aggregation via terpolymerization strategy.

14 SOLAR ENERGY↗

Modulation of the Effective Metal-Support Interactions for the Selectivity of Ceria Supported Noble Metal Nanoclusters in Atmospheric CO 2 Hydrogenation

Ever-increasing attention is given to the sustainable utilization of CO 2 in the atmosphere out of environmental and economic considerations. The deep-going clarification of the effective and ineffective metal-support interactions (MSI) in the supported catalysts for the catalytic performance of CO 2 hydrogenation is particularly needed to design highly active nanocatalysts. How to tune the MSI to be effective for the selectivity of goal hydrogenation products is a significant but rather challenging subject. In this work, we demonstrate that the selectivity in CO 2 hydrogenation can be regulated from preferential CH 4 production to preferential CO production by varying the nature of the electronic MSI for ceria supported noble metal nanoclusters, and the effective MSI play a pivotal role for the catalytic systems with opposite hydrogenation selectivity. The modulation of the effective MSI for the selectivity in CO 2 hydrogenation sheds new light on the comprehensive understanding of the MSI and interfacial effects in terms of tailoring and controlling the performance of supported heterogeneous catalysts.

36 MATERIALS SCIENCE↗

KETCHUP: Parameterizing of large-scale kinetic models using multiple datasets with different reference states

Large-scale kinetic models provide the computational means to dynamically link metabolic reaction fluxes to metabolite concentrations and enzyme levels while also conforming to substrate level regulation. However, the development of broadly applicable frameworks for efficiently and robustly parameterizing models remains a challenge. Challenges arise due to both the heterogeneity, paucity, and difficulty in obtaining flux and/or concentration data but also due to the computational difficulties of the underlying parameter identification problem. Both the computational demands for parameterization, degeneracy of obtained parameter solutions and interpretability of results has so far limited widespread adoption of large-scale kinetic models despite their potential. Herein, we introduce the Kinetic Estimation Tool Capturing Heterogeneous Datasets Using Pyomo (KETCHUP), a flexible parameter estimation tool that leverages a primal-dual interior-point algorithm to solve a nonlinear programming (NLP) problem that identifies a set of parameters capable of recapitulating the (non)steady-state fluxes and concentrations in wild-type and perturbed metabolic networks. KETCHUP is benchmarked against previously parameterized large-scale kinetic models demonstrating an at least an order of magnitude faster convergence than the tool K-FIT while at the same time attaining better data fits. Finally, this versatile toolbox accepts different kinetic descriptions, metabolic fluxes, enzyme levels and metabolite concentrations, under either steady-state or instationary conditions to enable robust kinetic model construction and parameterization. KETCHUP supports the SBML format and can be accessed at https://github.com/maranasgroup/KETCHUP.

59 BASIC BIOLOGICAL SCIENCES↗

Perspectives on Unmanned Aircraft Classification for Civil Airworthiness Standards

The use of unmanned aircraft in the National Airspace System (NAS) has been characterized as the next great step forward in the evolution of civil aviation. Although use of unmanned aircraft systems (UAS) in military and public service operations is proliferating, civil use of UAS remains limited in the United States today. This report focuses on one particular regulatory challenge: classifying UAS to assign airworthiness standards. This paper provides observations related to how the current regulations for classifying manned aircraft could apply to UAS.

Maddalon, Jeffrey M.↗

Enabling Fairness in Distributed PV Curtailment for Voltage Regulation: A Comparative Analysis

The growing adoption of photovoltaic systems in power distribution networks has yielded numerous advantages, but it has also introduced challenges, particularly in managing overvoltage issues. Uncoordinated photovoltaic integration can lead to voltage rise beyond acceptable levels. Curtailing active power is an effective method for addressing overvoltage issues in power distribution systems. Nevertheless, it is essential to distribute the curtailment fairly among the resources to maintain fairness and achieve a well-balanced utilization of renewable energy. This paper presents a comparative study of different fairness schemes for active power curtailment in photovoltaic integration systems. Three different curtailment methods are selected for demonstration: i) proportional, ii) egalitarian, and iii) financial. The study involves evaluating the curtailment schemes based on their ability to distribute the curtailed power among the photovoltaic systems in a justifiable manner, focusing on their formulation and distributed solution. A detailed performance comparison is carried out to highlight the cost of catering for fairness schemes in photovoltaic curtailment using relevant metrics, where simulations are carried out using a modified IEEE 123-bus test case.

Mukherjee, Monish↗

Physics-Informed Graph Neural Networks for Collaborative Dynamic Reconfiguration and Voltage Regulation in Unbalanced Distribution Systems

Network reconfiguration has long been employed as a strategic approach to minimize power distribution system losses and effectively regulate voltage levels. Tap-changing voltage regulators are also critical for controlling bus voltages, especially in accommodating the increasing integration of distributed energy resources (DERs) with intermittent outputs. This paper introduces novel methodologies to address the challenges of dynamic reconfiguration and optimal tap setting in unbalanced three-phase distribution systems. We propose an approximated mixed-integer quadratically constrained program (MIQCP) to model dynamic reconfiguration, along with a pioneering formulation for voltage regulator (VR) tap-setting based on Special Ordered Set type 1 (SOS1). To mitigate computational complexity, we propose a physics-informed spatial-temporal graph convolutional network (STGCN) with an integrated link classifier. The proposed approach enables efficient solution generation by fixing specific variables in the MIQCP instance and solving the simplified sub-MIP using an MIP solver. Numerical studies demonstrate the superior prediction accuracy of our STGCN model compared to baseline neural network models, resulting in reduced DER curtailment and voltage deviation with shorter computation time.

dynamic reconfiguration↗

Defect-Regulated Frustrated-Lewis-Pair Behavior of Boron Nitride in Ambient Pressure Hydrogen Activation

We report the construction of heterogeneous frustrated Lewis pairs (FLPs) with performance comparable to or surpassing the homogeneous counterparts in H 2 activation is a long-standing challenge. Herein, sterically hindered Lewis acid (“B” center) and Lewis base (“N” center) sites were anchored within the rigid lattice of highly crystalline hexagonal boron nitride (h-BN) scaffolds. The active sites were created via precision defect regulation during the molten-salt-involved (NaNH 2 and NaBH 4 ) h-BN construction procedure. The as-afforded h-BN scaffolds achieved highly efficient H 2 /D 2 activation and dissociation under ambient pressure via FLP-like behavior, and attractive catalytic efficiency in hydrogenation reactions surpassing the current heterogeneous analogues.

36 MATERIALS SCIENCE↗

NARUC Resilience Framework

The NARUC Resilience Framework provides state regulators and other key stakeholders with a structured approach to considering policies and programs that will enhance grid resilience amid evolving technological, environmental and economic challenges. This Framework consolidates insights from nationwide workshops and peer discussions into six actionable components: (1) setting goals and objectives, (2) leveraging use cases, (3) establishing shared definitions, (4) ensuring inclusive process leadership, (5) addressing critical design questions, and (6) guiding implementation. This Framework is intended as a strategic tool for regulators to navigate resilience investments, prioritize affordability, integrate stakeholder needs, and foster collaboration across agencies, all while balancing cost-effectiveness with societal and economic resilience outcomes. By presenting a structured approach to decision-making rather than prescriptive solutions, the Framework supports nuanced, jurisdiction-specific resilience planning and is adaptable to the dynamic demands of modern energy systems

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗