Cost Impacts of Risk-Based Methods for Defining AoR and PISC Duration of a CO 2 Storage Project Using NRAP Tools and FE/NETL CO 2 Saline Storage Cost Model

The purpose of this analysis is to assess the fiscal impact of using risk-based methods to define the area of review (AoR) and post-injection site care (PISC) duration for a geologic carbon dioxide (CO 2 ) storage project. The Office of Fossil Energy (FE)/National Energy Technology Laboratory (NETL) CO 2 Saline Storage Cost Model (“cost model”) was utilized to evaluate CO 2 storage economics in this study. The cost model is a widely used tool for evaluating CO 2 storage costs in geologic settings. It estimates costs for storage operations conducted under compliance to the United States Environmental Protection Agency (EPA) Underground Injection Control (UIC) Class VI regulations. This analysis evaluates and compares the costs of storage (on a first-year break-even dollar per tonne [2018$] basis) at the proposed FutureGen 2.0 site as a case study storage location by implementing different approaches to determine AoR and PISC given the prevailing geologic conditions and injection volume and duration considerations. The approaches include the use of 1) risk-based methods to define AoR and PISC duration, 2) an EPA-approved AoR and PISC documented in the FutureGen 2.0 UIC Class VI permit applications, and 3) cost model default settings that utilize uncertainty multipliers to estimate CO 2 plume and pressure front extent as part of AoR determination, as well as a 50-year PISC default. From all three sources, the AoR and PISC specified in the Class VI permit applications for FutureGen 2.0 were the largest and longest relative to the other two sources.

54 ENVIRONMENTAL SCIENCES↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

Electrolyte Development for Fast-Charging High-Energy-Density Lithium Batteries (CRADA 482)

The high energy-density lithium (Li)-ion battery (LIB) and Li metal battery (LMB) technologies have been developed rapidly for the widespread electrification of automotive transportation sector. The projected fast growing markets call for substantial improvement of battery performance and manufacturing cost reduction. This project is to optimize and maturate previously-demonstrated novel electrolytes for both fast-charging LIBs with Gr anodes and high-energy-density LMBs to achieve long-term cycling stability at room temperature for applications in electric vehicles, unmanned aerial vehicles, and consumer electronics.

25 ENERGY STORAGE↗

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Huslia Tribal Council Biomass Project: A Project to Increase Sustainability and Reduce Energy Costs in Huslia, AK

The Huslia Tribal Council (HTC) and the Tanana Chiefs Conference (TCC), partnering with the City of Huslia, the Yukon-Koyukuk School District, and Alaska Native Tribal Health Consortium, applied to the U.S. Department of Energy Office of Indian Energy for funding of a community biomass boiler system. The biomass system contributes to heating three community buildings in Huslia, Alaska with locally harvested fuels: the clinic, the water treatment plant/washeteria, and the school. The remaining heating needs are supported by in-building oil-fired boilers, burning imported heating fuel. Some issues, such as control set points on the oil boilers, need to be resolved before the biomass heating system is used at full capacity. The project objectives of the community biomass boiler system were cost reduction, carbon reduction, community resilience, and economic development. Once fully operational, the cost reduction from decreased fuel oil usage due to support from the biomass boiler system is expected to more than offset the cost of purchasing locally harvested biofuel, resulting in overall savings to the community. Locally sourced wood is considered carbon-neutral, so the biomass boiler system decreases the carbon footprint of heating the community buildings. The project increases resilience by decreasing dependence on heating oil brought in from elsewhere. Lastly, it produces economic development by employing locals to gather the wood burned in the biomass boiler. This project satisfies all of the objectives that HTC set out to achieve.

09 BIOMASS FUELS↗

Wind power costs driven by innovation and experience with further reductions on the horizon

The costs of wind power have declined to levels on par with or below those of conventional sources in many parts of the world. Wind power has become one of the fastest-growing sources of new electricity generation. We take stock of wind power cost evolution over the past 20 years, review methodologies commonly used for cost assessment, discuss the potential for continued cost reduction, and identify anticipated cost and value drivers. Our scope includes both onshore and offshore wind technologies. We draw from a vast body of literature on these topics to highlight key trends, approaches, and limitations. Furthermore, we discuss strategies for wind power assets to enhance their marginal economic value to the broader power system and consumers. We identify a myriad of factors that are expected to influence the future cost and value of wind power, including siting, project scale, turbine size, operational synergies, commodity prices, advancements in turbine technologies, enhanced management of the wind resource, and novel control technologies that provide value for the electricity grid. Because the common methods for forecasting future costs each have their own strengths and weaknesses, we find the best insights are elicited from a combination of methods. Overall, researchers and analysts anticipate further sizable cost reductions for onshore and offshore wind. Midrange forecasts for levelized cost of energy in 2050 are generally between $20 and $30/MWh for onshore wind and $40 and $60/MWh for offshore wind, a reduction to approximately half of today's levels. Optimistic forecasts anticipate these levels as early as 2030.

17 WIND ENERGY↗

Lowering tomography costs in quantum simulation with a symmetry projected operator basis

Measurement in quantum simulations provides a means for extracting meaningful information from a complex quantum state, and for quantum computing, reducing the complexity of measurement will be vital for near-term applications. For most quantum simulations, the targeted state will obey several symmetries inherent to the system Hamiltonian. Here, we obtain an alternative symmetry projected basis of measurement that reduces the number of measurements needed by a constant factor. Our scheme can be implemented at no additional cost on a quantum computer, can be implemented under various measurement or tomography schemes, and is reasonably resilient under noise.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Potential Role for New Nuclear in the U.S. Power System: A View from Electricity System Modelers

There are diverse views on the role nuclear power might play in a decarbonized energy system, with some vocal viewpoints suggesting nuclear should either have no role or that nuclear should be a key pillar. Here we present a perspective on the role of nuclear power based on our collective experience in modeling nuclear power within the decarbonized U.S. power systems. We summarize the costs of current reactor development projects, and compare their stated costs with the costs that our models indicate is necessary in order to see deployment of new nuclear. We also discuss aspects of new nuclear deployment that are not included in our models but can influence decisions about whether to invest in new nuclear capacity.

decarbonization↗

Quantifying Uncertainty in PV Energy Estimates Final Report

Uncertainty in PV energy estimates is "one of the most critical areas of lack of understanding" according to independent engineers, financiers, PV model developers, and other industry stakeholders. The primary problem is a lack of rigorous, transparent, widely accepted methods for quantifying uncertainty in energy production estimates. Uncertainty in energy production estimates arises from variability of the solar resource, inexact PV performance models and their parameters, and system reliability considerations. Uncertainty in annual energy production is frequently calculated for larger projects in order to quantify financial risk. Key statistics for energy, such as the P-values "P50" and "P90" (the annual energy values that are exceeded in future years with 50\% and 90\% probability, respectively) are used by financing institutions to calculate the repayment risk for the project. The current methods to estimate these statistics are typically proprietary, specialized, and involve significant post-processing of commercial performance model results. This black-box approach leads to inconsistent P-value estimates from different parties, which reduces investors' confidence in the results. Since the financial community bases its risk assessment on these estimates, reduced confidence increases perceived project risk, and consequently financing costs. The goal of this project was to establish a set of best practices for quantifying uncertainty in energy production estimates, including identifying what sources of uncertainty must be considered with clear definitions and metrics, determining which sources are the biggest drivers of uncertainty, and providing a computationally efficient framework for combining different sources of uncertainty that is flexible enough to accommodate substitutions of data or methods when better information is available. We engaged a wide set of stakeholders to ensure industry endorsement and adoption, and leveraged complementary projects investigating individual sources of uncertainty in great detail, as well as others' work that started down this path.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Advanced Fuel Cycle Cost Basis Report: Supporting Documents 2 Production Based Costing

The purpose of this section is to outline a method of cost analysis whereby a significantly better representation of “should achieve” costs may be attained for NOAK systems. Based on economists’ notions of producer theory, and grounded in the cost analysts’ and project managers’ tool called the Work Breakdown Structure (WBS), this section describes best practices in cost estimation. It then illustrates how the Code of Accounts (COA) structure, developed by the Economic Modeling Working Group (EMWG) of the Generation IV International Forum in “Cost Estimating Guidelines for Generation IV Nuclear Energy Systems [EMWG 2007] (hereafter “Gen IV Guidelines Document”), can be used to differentiate “should achieve” versus “did experience” costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Carbon storage cost modeling for the offshore Gulf of Mexico

Groundbreaking for geologic carbon storage (GCS) projects in the offshore Gulf of Mexico is imminent, and there is great interest in utilizing this region for GCS projects. Offshore saline reservoirs provide a significant and accessible resource for GCS. However, conducting GCS in the offshore environment will pose distinct challenges pertaining to site selection, operations, infrastructure use, and monitoring compared to operating onshore that ultimately affect technoeconomic assessment of offshore GCS projects. Carbon storage and transport costs are critical to project developers looking to deploy carbon storage in the offshore environment. We present CO2_S_COM_Offshore, a model developed by the National Energy Technology Laboratory (NETL) as a screening-level offshore saline GCS cost modeling tool. Based on NETL’s widely used CO2_S_COM cost model for onshore saline CS, CO2_S_COM_Offshore enables technoeconomic analysis of GCS in offshore areas. This model comprehensively incorporates multiple facets of offshore GCS projects, from regional evaluation and site selection to permitting, transport, operations, monitoring, site closure, and decommissioning. In general, the model can explore the cost implications for potential offshore GCS project(s) by enabling the user to change several project operational and financial attribute configurations. Key inputs include offshore storage formation options, CO2 injection rate and duration, infrastructure types, monitoring intensity, project financing, and post-injection site care duration. Supporting cost algorithms within CO2_S_COM_Offshore were compiled utilizing S&P Global’ s QUE$TORTM cost estimation software alongside a variety of open-source scientific literature. In addition to reviewing key model components, we discuss several sensitivity analyses, input variabilities, and results on analysis of break-even CO2 price required by a project based on different regulation/policy and operational scenarios for the offshore Gulf of Mexico. These results indicate the value of modeling offshore GCS specifically, and the potential of offshore GCS within a decarbonization value chain. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Mark-Moser, Mackenzie K.↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Deployment of Energy Efficiency and Clean Energy on Indians Lands – A Community Solar Project

The Eastern Band of Cherokee Indians (EBCI or Tribe) is a federally recognized Indian Tribe located on ancestral homelands in western North Carolina. The Tribe is comprised of just over 16,000 enrolled members, with an estimated 8,000 – 10,000 residing on tribal lands. The Qualla Boundary is comprised of over 56,000 acres of contiguous trust land adjacent to the Great Smoky Mountain National Park. The EBCI also possess an assortment of scattered parcels of varying sizes across western North Carolina, some in trust status and others in deeded or fee simple. This project was implemented on a trust parcel in Cherokee County, NC. The Tribe was awarded the maximum amount of $\$ $1,000,000 for the installation of a 705.6 kilowatt (kW) solar PV array to supplement the power consumed and reduce annual utility costs at the Harrah’s Cherokee Valley River (HCVR) casino and hotel in Murphy, NC. The casino is a tribal entity of the Tribe. The total cost of the project was $\$ $2.364 million. The system was officially commissioned on April 12, 2019. For the purpose of calculating the amount of power produced and reduction in utility costs, the time frame assessed is May 2019 through April 2020. All power generated was consumed onsite.Based on the first full year of data, the project achieved the estimated 8.3% reduction in utility costs. A total of six casino and tribal staff were trained and received a North American Board of Certified Energy Practitioners (NABCEP) certification, giving our staff the resources and skills to manage and operate the solar PV array. Based on the Tribal match of $\$ $1,377,797 and estimated net annual benefit of $89,000, the estimated return on investment (ROI) is 15.48 years.

14 SOLAR ENERGY↗