Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

A modified quadrupole mass spectrometer with custom RF link rods driver for remote operation

A commercial quadrupole residual gas analyzer system has been upgraded for operation at extended cable lengths. Operation inside a vacuum chamber for the standard quadrupole nude head is limited to approximately 2 m from its externally located rf/dc generator because of the detuning of the rf oscillator circuits by the coaxial cable reactance. The advance of long distance remote operation inside a vacuum chamber for distances of 45 and 60 m was made possible without altering the quadrupole's rf/dc generator circuit by employing an rf link to drive the quadrupole rods. Applications of the system have been accomplished for in situ space simulation thermal/vacuum testing of sophisticated payloads.

Tashbar, P. W.↗

Adaptive Technologies Developed and Demonstrated for Extending the Stable Operating Range of Compressors

The operational envelope of gas turbine engines is constrained by the stability limit of the compression system. The dangers of exceeding this limit are severe, with the potential for engine failure and loss of the aircraft. To avoid such failures, compressor designers provide an adequate stability (stall) margin in the compressor design to account for inlet distortions, degradation due to wear, throttle transients, and other factors that reduce compressor stability from the original design intent. In some cases, the required stall margin results in the compressor operating line being below the maximum efficiency potential of the compression system. Current approaches to increasing stability tend to decrease the efficiency of the compressor. The focus of this work is to increase the stall margin of compressors without decreasing their efficiency.

Hathaway, Michael D.↗

Guaranteeing Failsafe Operation of Extended-Scene Shack-Hartmann Wavefront Sensor Algorithm

A Shack-Hartmann sensor (SHS) is an optical instrument consisting of a lenslet array and a camera. It is widely used for wavefront sensing in optical testing and astronomical adaptive optics. The camera is placed at the focal point of the lenslet array and points at a star or any other point source. The image captured is an array of spot images. When the wavefront error at the lenslet array changes, the position of each spot measurably shifts from its original position. Determining the shifts of the spot images from their reference points shows the extent of the wavefront error. An adaptive cross-correlation (ACC) algorithm has been developed to use scenes as well as point sources for wavefront error detection. Qualifying an extended scene image is often not an easy task due to changing conditions in scene content, illumination level, background, Poisson noise, read-out noise, dark current, sampling format, and field of view. The proposed new technique based on ACC algorithm analyzes the effects of these conditions on the performance of the ACC algorithm and determines the viability of an extended scene image. If it is viable, then it can be used for error correction; if it is not, the image fails and will not be further processed. By potentially testing for a wide variety of conditions, the algorithm s accuracy can be virtually guaranteed. In a typical application, the ACC algorithm finds image shifts of more than 500 Shack-Hartmann camera sub-images relative to a reference sub -image or cell when performing one wavefront sensing iteration. In the proposed new technique, a pair of test and reference cells is selected from the same frame, preferably from two well-separated locations. The test cell is shifted by an integer number of pixels, say, for example, from m= -5 to 5 along the x-direction by choosing a different area on the same sub-image, and the shifts are estimated using the ACC algorithm. The same is done in the y-direction. If the resulting shift estimate errors are less than a pre-determined threshold (e.g., 0.03 pixel), the image is accepted. Otherwise, it is rejected.

Sidick, Erikin↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

A north-south stationkeeping ion thruster system for ATS-F

A one millipound cesium ion thruster system experiment designed for the ATS-F satellite will be used to demonstrate north-south stationkeeping for synchronous satellites. Development effort leading to the present design will be described and test data for qualification and flight acceptance tests will be presented. These include a review of EMI evaluations tests made with the power conditioning subsystem and the thruster simulator, and an extended system operational test. During the extended test, 90 on-off cycles simulated thruster operation in orbit. A planned 18,000 hour ground test of a flight qualified thruster will be discussed.

James, E.↗

Application of Cable Condition Monitoring Technologies to Assess Age-Related Degradation of Industrial Cables Installed in Harsh Environments

The aging of electrical cables has been the subject of substantial research and development (R&D) projects performed by national and international laboratories, universities, and private organizations for many years. This R&D was conducted to develop guidance, equipment, and techniques to support aging management of in-service cables in industrial facilities such as nuclear power plants, research reactors, waste facilities, and fuel fabrication plants. Through these research efforts, condition monitoring technologies have been developed that can determine the severity of age-related degradation that occurs in industrial cables and insulation polymers during service. This paper summarizes the results of aging assessments that were performed for cables installed in two U.S. nuclear power plants, one a pressurized water reactor and one a boiling water reactor. These cables had been in service for over 40 years and during plant operation were exposed to harsh environmental conditions including elevated temperatures and radiation. For these assessments, a comprehensive series of measurements was performed to assess the aged condition of the cables. These cables came from different manufacturers, were manufactured in different years, and were constructed with a variety of jacket and insulation polymers including chloro-sulfonated polyethylene (CSPE), cross-linked polyethylene (XLPE)/cross-linked polyolefin (XLPO), neoprene, and ethylene propylene rubber (EPR). The goal of these assessments was to determine the current aged condition of the cable polymers and provide an estimate of how long the cable insulation materials could remain exposed to their in-service environmental conditions before reaching their end-of-life condition. Both nuclear power plants have received license renewals to extend their operation from 40 to 60 years, and the utilities need objective evidence to show that critical components such as cables will be able to function safely and reliably during the extended operating period. Furthermore, the results of these assessments showed that the cables exhibited different aged conditions depending on the type of polymers they were constructed with and the environment they were exposed to during service. Some of the cables and insulation polymers showed signs of significant age-related degradation and were estimated to have approximately 5 years of remaining service life. Other cables exhibited no signs of significant age-related degradation and were estimated to have 50 years or more of remaining service life. Using the results of these cable aging assessments, plant personnel were able to (1) determine the overall aged condition of cables and insulation polymers using objective test results, (2) identify aged or degraded cables before they caused operability issues, and (3) avoid unnecessary and costly replacement of cables that can continue to operate safely and reliably.

36 MATERIALS SCIENCE↗

Development of an Assessment Methodology That Enables the Nuclear Industry to Evaluate Adoption of Advanced Automation

Nuclear power has a crucial role in providing safe, reliable, and economical carbon-free electricity for today and the future. For continued operation, many of the existing United States nuclear power plants will begin the subsequent license renewal process for extending their operating license periods. As plants extend their expected operating lifetimes, there is a significant opportunity to modernize. These plants have a much stronger business case with these extended mission periods to modernize and significantly enhance their economic viability in current and future energy markets by implementing digital technologies that support innovation, efficiency gains, and business-model transformation. Ensuring continued safety and reliability is crucial. Transformative digital technologies—including automation—that fundamentally change the concept of operation for the nuclear power plant operating model requires a critical focus on the human and technology integration element. Further, the nuclear industry has historically been reluctant to modernize due to having a risk adverse culture and lack of clarity for a transformative new state vision (Joe & Remer, 2019; Thomas et al., 2020). Common barriers include (1) the perceived value and return on investment (ROI) of digital technology, (2) the perceived risk associated with licensing, regulatory, and cybersecurity, and (3) insufficient guidance for performing digital modifications to power generation systems. This work presents a methodology to address these barriers and support the industry in adopting advanced automation and digital technology through developing a transformative vision and implementation strategy that will address the human and technology integration element. This research leverages previous LWRS Program and industry results. It draws specifically on previous LWRS Program research in the areas of advanced alarm systems, computer-based procedures, model informed decision support, and advanced human-system interface displays (e.g., overviews and task-based). The modernization methodology can be used to guide transformative thinking when integrating a set of vendor-specific capabilities to support a new concept of operations and a utility’s end-state vision. The results of this research are organized into six major sections: - Section 1 introduces the need for supporting large-scale digital modifications that will renew the technology base for extended operating life beyond 60 years - Section 2 describes the challenges that the nuclear industry is enduring with modernizing. - Section 3 summarizes the primary standards and guidance. - Section 4 presents earlier work from the LWRS Program regarding the development of a transformative conceptual design for an advanced control room of a hybrid plants. - Section 5 presents a methodology that is designed at addressing the challenges in the industry today in achieving a transformative new state vision and concept of operations. - Conclusions and next steps of this research are provided in Section 6.

99 GENERAL AND MISCELLANEOUS↗

The utility of surface magnetic field measurements in the MAGSAT program

To take full advantage of the global, vector, survey by the Magsat satellite, and international program of augmented surface measurements was proposed. For secular variation and upper mantle conductivity the proposed measurements are global. The repeat station measurements for secular variation should be occupied at 2-3 year intervals. A special observing period in November and December of 1979 is proposed during which simultaneous, continuous, global measurements for upper mantle conductivity studies are to be gathered. Finally, it is recommended that the networks in operation during the IMS extend their operation through the Fall of 1980 to provide correlative data useful for high latitude disturbance studies and for crustal conductivity studies.

Langel, R. A.↗

The Impact of Back-Sputtered Carbon on the Accelerator Grid Wear Rates of the NEXT and NSTAR Ion Thrusters

A study was conducted to quantify the impact of back-sputtered carbon on the downstream accelerator grid erosion rates of the NEXT (NASA's Evolutionary Xenon Thruster) Long Duration Test (LDT1). A similar analysis that was conducted for the NSTAR (NASA's Solar Electric Propulsion Technology Applications Readiness Program) Life Demonstration Test (LDT2) was used as a foundation for the analysis developed herein. A new carbon surface coverage model was developed that accounted for multiple carbon adlayers before complete surface coverage is achieved. The resulting model requires knowledge of more model inputs, so they were conservatively estimated using the results of past thin film sputtering studies and particle reflection predictions. In addition, accelerator current densities across the grid were rigorously determined using an ion optics code to determine accelerator current distributions and an algorithm to determine beam current densities along a grid using downstream measurements. The improved analysis was applied to the NSTAR test results for evaluation. The improved analysis demonstrated that the impact of back-sputtered carbon on pit and groove wear rate for the NSTAR LDT2 was negligible throughout most of eroded grid radius. The improved analysis also predicted the accelerator current density for transition from net erosion to net deposition considerably more accurately than the original analysis. The improved analysis was used to estimate the impact of back-sputtered carbon on the accelerator grid pit and groove wear rate of the NEXT Long Duration Test (LDT1). Unlike the NSTAR analysis, the NEXT analysis was more challenging because the thruster was operated for extended durations at various operating conditions and was unavailable for measurements because the test is ongoing. As a result, the NEXT LDT1 estimates presented herein are considered preliminary until the results of future posttest analyses are incorporated. The worst-case impact of carbon back-sputtering was determined to be the full power operating condition, but the maximum impact of back-sputtered carbon was only a four percent reduction in wear rate. As a result, back-sputtered carbon is estimated to have an insignificant impact on the first failure mode of the NEXT LDT at all operating conditions.

Soulas, George C.↗

The Impact of Back-Sputtered Carbon on the Accelerator Grid Wear Rates of the NEXT and NSTAR Ion Thrusters

A study was conducted to quantify the impact of back-sputtered carbon on the downstream accelerator grid erosion rates of the NASA's Evolutionary Xenon Thruster (NEXT) Long Duration Test (LDT1). A similar analysis that was conducted for the NASA's Solar Electric Propulsion Technology Applications Readiness Program (NSTAR) Life Demonstration Test (LDT2) was used as a foundation for the analysis developed herein. A new carbon surface coverage model was developed that accounted for multiple carbon adlayers before complete surface coverage is achieved. The resulting model requires knowledge of more model inputs, so they were conservatively estimated using the results of past thin film sputtering studies and particle reflection predictions. In addition, accelerator current densities across the grid were rigorously determined using an ion optics code to determine accelerator current distributions and an algorithm to determine beam current densities along a grid using downstream measurements. The improved analysis was applied to the NSTAR test results for evaluation. The improved analysis demonstrated that the impact of back-sputtered carbon on pit and groove wear rate for the NSTAR LDT2 was negligible throughout most of eroded grid radius. The improved analysis also predicted the accelerator current density for transition from net erosion to net deposition considerably more accurately than the original analysis. The improved analysis was used to estimate the impact of back-sputtered carbon on the accelerator grid pit and groove wear rate of the NEXT Long Duration Test (LDT1). Unlike the NSTAR analysis, the NEXT analysis was more challenging because the thruster was operated for extended durations at various operating conditions and was unavailable for measurements because the test is ongoing. As a result, the NEXT LDT1 estimates presented herein are considered preliminary until the results of future post-test analyses are incorporated. The worst-case impact of carbon back-sputtering was determined to be the full power operating condition, but the maximum impact of back-sputtered carbon was only a 4 percent reduction in wear rate. As a result, back-sputtered carbon is estimated to have an insignificant impact on the first failure mode of the NEXT LDT1 at all operating conditions.

Soulas, George C.↗