Search NASA⌕ Search

SEARCH · Search NASA

Results for “lift modulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

241 records · Page 14

Experimental, Computational, Theoretical and Analytical Investigation of Flow Boiling in Reduced Gravity

Two-phase thermal management systems are far superior to their single-phase counterparts because of their ability to capitalize on the coolant’s both sensible and latent heats, thereby yielding orders of magnitude higher heat transfer coefficients and smaller system footprints. A vital knowledge necessary for their implementation in future space systems is performance in microgravity. Long-duration microgravity experiments are necessary to obtain reliable databases, which would then be used to build reliable predictive tools. To achieve this goal, investigators at the Purdue University Boiling and Two-Phase Flow Laboratory (PU-BTPFL) and the NASA Glenn Research Center (NASA-GRC) have been collaborating towards the development of the Flow Boiling and Condensation Experiment (FBCE) and eventual execution onboard the International Space Station (ISS). FBCE has now matured to a point where it is ready for transport to the ISS, where first tests will be conducted using the Flow Boiling Module (FBM). In preparation for the ISS tests, a series of pre-launch Mission Sequence Tests (MSTs) was performed at GRC in Earth gravity with FBM mounted in a vertical upflow orientation using n-perfluorohexane as working fluid. The pre-launch tests included variations of flow rate, surface heat flux, inlet conditions, and both single-sided and double-sided wall heating. This presentation will summarize experimental results from these tests as well as both analytic and theoretical tools for prediction of two-phase heat transfer coefficient and critical heat flux (CHF). Also discussed will be an assessment of predictive accuracy of these tools against the experimental data.

Mission Sequence tests↗

A combined electron beam/optical lithography process step for the fabrication of sub-half-micron-gate-length MMIC chips

Advanced radar and communication systems rely heavily on state-of-the-art microelectronics. Systems such as the phased-array radar require many transmit/receive (T/R) modules which are made up of many millimeter wave - microwave integrated circuits (MMIC's). The heart of a MMIC chip is the Gallium Arsenide (GaAs) field-effect transistor (FET). The transistor gate length is the critical feature that determines the operating frequency of the radar system. A smaller gate length will typically result in a higher frequency. In order to make a phased array radar system economically feasible, manufacturers must be capable of producing very large quantities of small-gate-length MMIC chips at a relatively low cost per chip. This requires the processing of a large number of wafers with a large number of chips per wafer, minimum processing time, and a very high chip yield. One of the bottlenecks in the fabrication of MIMIC chips is the transistor gate definition. The definition of sub-half-micron gates for GaAs-based field-effect transistors is generally performed by direct-write electron beam lithography (EBL). Because of the throughput limitations of EBL, the gate-layer fabrication is conventionally divided into two lithographic processes where EBL is used to generate the gate fingers and optical lithography is used to generate the large-area gate pads and interconnects. As a result, two complete sequences of resist application, exposure, development, metallization and lift-off are required for the entire gate structure. We have baselined a hybrid process, referred to as EBOL (electron beam/optical lithography), in which a single application of a multi-level resist is used for both exposures. The entire gate structure, (gate fingers, interconnects and pads), is then formed with a single metallization and lift-off process. The EBOL process thus retains the advantages of the high-resolution E-beam lithography and the high throughput of optical lithography while essentially eliminating an entire lithography/metallization/lift-off process sequence. This technique has been proven to be reliable for both trapezoidal and mushroom gates and has been successfully applied to metal-semiconductor and high-electron-mobility field-effect transistor (MESFET and HEMT) wafers containing devices with gate lengths down to 0.10 micron and 75 x 75 micron gate pads. The yields and throughput of these wafers have been very high with no loss in device performance. We will discuss the entire EBOL process technology including the multilayer resist structure, exposure conditions, process sensitivities, metal edge definition, device results, comparison to the standard gate-layer process, and its suitability for manufacturing.

Sewell, James S.↗

The Dryline on 22 May 2002 during IHOP_2002: Convective-Scale Measurements at the Profiling Site

A detailed analysis of the structure of a double dryline observed over the Oklahoma panhandle during the first International H2O Project (IHOP_2002) convective initiation (CI) mission on 22 May 2002 is presented. A unique and unprecedented set of high temporal and spatial resolution measurements of water vapor mixing ratio, wind, and boundary layer structure parameters were acquired using the National Aeronautics and Space Administration (NASA) scanning Raman lidar (SRL), the Goddard Lidar Observatory for Winds (GLOW), and the Holographic Airborne Rotating Lidar Instrument Experiment (HARLIE), respectively. These measurements are combined with the vertical velocity measurements derived from the National Center for Atmospheric Research (NCAR) Multiple Antenna Profiler Radar (MAPR) and radar structure function from the high-resolution University of Massachusetts frequency-modulated continuous-wave (FMCW) radar to reveal the evolution and structure of the late afternoon double-dryline boundary layer. The eastern dryline advanced and then retreated over the Homestead profiling site in the Oklahoma panhandle, providing conditions ripe for a detailed observation of the small-scale variability within the boundary layer and the dryline. In situ aircraft data, dropsonde and radiosonde data, along with NCAR S-band dual-polarization Doppler radar (S-Pol) measurements, are also used to provide the larger-scale picture of the double-dryline environment. Moisture and temperature jumps of about 3 g kg(sup -1) and 1 -2 K, respectively, were observed across the eastern radar fine line (dryline), more than the moisture jumps (1-2 g kg(sup -1)) observed across the western radar fine line (secondary dryline). Most updraft plumes observed were located on the moist side of the eastern dryline with vertical velocities exceeding 3 m s(sup -1) and variable horizontal widths of 2-5 km, although some were as wide as 7-8 km. These updrafts were up to 1.5 g kg(sup -1) moister than the surrounding environment. Although models suggested deep convection over the Oklahoma panhandle and several cloud lines were observed near the dryline, the dryline itself did not initiate any storms over the intensive observation region (IOR). Possible reasons for this lack of convection are discussed. Strong capping inversion and moisture detrainment between the lifting condensation level and the level of free convection related to an overriding drier air, together with the relatively small near-surface moisture values (less than 10 g kg(sup -1)), were detrimental to CI in this case.

Demoz, Belay↗

Veggie Hardware Validation Test Preliminary Results and Lessons Learned

The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety hazard, for visual comfort crewmembers were advised to wear sunglasses when working with the plants and then they can lift glasses to read procedures. Steve Swanson had already trail-blazed this procedure when he initiated VEG-01. The temperature and humidity data logger was relocated mid-experiment to provide measurements on both sides of the unit. Images of the plants were downlinked weekly, and videos of installation and harvest were recorded. This imaging frequency was not sufficient to monitor and respond to changes in plant growth. Plants, samples, and data loggers will be returned on SpaceX-4, scheduled to return the fall of 2014. Lessons learned will be translated into hardware and operational modifications for future Veggie payloads.

International Space Station↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (lsp~850-1000 s) capability and its attractive engine thrust-to-weight ratio (~3-10). To stay within the available mass and payload volume limits of a “Magnum” heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (~10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as “bimodal” operation), a robust, multiple burn, “power-rich” stage with propulsive Mars capture and reuse capability is possible. A family of modular “bimodal” NTR (BNTR) vehicles are described which utilize a common “core” stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, zero-boiloff liquid hydrogen (LH 2 ) storage, and high data rate communications. An innovative, spine-like “saddle truss” design connects the core stage and payload element and is open underneath to allow supplemental “in-line” propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A “modified” DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step—use of the BNTR for propulsive capture of all payload elements into Mars orbit—the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass “aerodescent” shell. The attractiveness of the “all BNTR” option is further increased by the substitution of the lightweight, inflatable “TransHab” module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR / Earth return vehicle (ERV). It also allows the crew to travel to and from Mars on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half—from ~4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the “all LH 2 ” BNTR stage. The use of “LOX-augmented” NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixture ratio (MR) of 0.5, helps to increase “bulk” propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH 2 only (MR=0) to maximize vehicle performance while staying within the mass limits of two Magnum launches.

Nuclear thermal rocket↗

The Vacuum-Compacted Regolith Gripping Mechanism and Unmanned Flights via Quad-Rotors

During the course of the Kennedy Space Center Summer Internship, two main experiments were performed: The Vacuum-Compacted Regolith Gripping Mechanism and Unmanned Flights via Quad-copters. The objectives of the Vacuum-Compacted Regolith Gripping Mechanism, often abbreviated as the Granular Gripper, are to exhibit Space Technology, such as a soft robotic hand, lift different apparatuses used to excavate regolith, and conserve energy while executing its intended task. The project is being conducted to test how much weight the Granular Gripper can hold. With the use of an Animatronic Robotic Hand, Arduino Uno, and other components, the system was calibrated before actually conducting the intended weight test. The maximum weight each finger could hold with the servos running, in the order of pinky, ring, middle, and index fingers, are as follows: 1.340N, 1.456 N, 0.9579 N, and 1.358 N. Using the small vacuum pump system, the maximum weight each finger could hold, in the same order, was: 4.076 N, 6.159 N, 5.454 N, and 4.052 N. The maximum torques on each of the fingers when the servos were running, in the same respective order, was: 0.0777 Nm, 0.0533 Nm, 0.0648 Nm, and 0.0532 Nm. The maximum torques on the individual fingers, when the small vacuum pump was in effect, in the same order as above, was: 0.2318 Nm, 0.3032 Nm, 0.2741 Nm, and 0.1618 Nm. In testing all the fingers with the servos running, the total weight was 5.112 N and the maximum torque on the all the fingers was 0.2515 Nm. However, when the small vacuum pump system was used, the total weight was 19.741 N and the maximum torque on the all the fingers was 0.9713 Nm. The conclusion that was drawn stated that using the small vacuum pump system proved nearly 4 times more effective when testing how much weigh the hand could hold. The resistance provided by the compacted sand in the glove allowed more weight to be held by the hand and glove. Also, when the servos turned off and the hand still retaining its position, energy is being saved because the vacuum created the same resistance the running servos did without using power. The Unmanned Flights via Quad-rotors are built because multi-rotor dynamics are an important starting point and fair analog for space craft control systems and they make good terrestrial development platforms for various aspects of control for space crafts. The project is being conducted to see what the thrust response is going to be when a pulse width modulation command is sent to the control system since the quad-rotors are PWM controlled. A simulation environment in constructed so that one can quickly iterate and test different designs such as control systems, PID control vs. LDR control, and state estimation. Using two DIY Quad Kits, APM 2.6, testing apparatus (called a data acquisition system) to test the quad-rotors, and a simulation program such as Simulink, two quad-rotors are built and controlled via a simulation program, which is designed to be as realistic as possible and not idealistic. Due to the quad-rotors not being completely built nor ready for testing, there are no results or conclusions to report.

Granular Gripper↗