Impact of Open Communication Networks on Load Frequency Control with Plug-in Electric Vehicles by Cyber-Physical Dynamic Co-Simulation: Preprint

With the increasing electrification of the transportation sector, vehicle to grid (V2G) control technologies are promising to improving system frequency stability. However, these control technologies might require non-traditional communication supports. This paper investigates the impacts of electric vehicles (EVs) V2G on power system frequency regulation considering communication variations through transmission-distribution-communication (TDC) dynamic simulation. The simulation model is built based on our previously developed open-source transmission-and-distribution (T&D) dynamic co-simulation framework. Here, we add the communication variation functions (i.e. delay and packet loss) to complete the TDC simulation framework. In the case studies, practical communication variation scenarios are considered when the system experiencing an N-1 generation trip contingency. The considered scenarios include communication delay and packet loss using both homogeneous and heterogeneous assumptions. The delay and packet loss rate are the same in all communication channels in the homogeneous case but varies in the heterogeneous case. The results show the communication delay has an obvious impact on the frequency recovery compared to the communication packet drop. The impacts of the standard deviations of communication delay time and packet drop rate are not significant. The outcomes of this work can help improve the EV frequency regulation services and provide robust and effect supports to the grid.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Rapid QSTS Simulations for High-Resolution Comprehensive Assessment of Distributed PV

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modeling and impact analysis. Unlike conventional scenario-based studies, quasi-static time-series (QSTS) simulations can realistically model time-dependent voltage controllers and the diversity of potential impacts that can occur at different times of year. However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1-second resolution is often required, which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled. This computational burden is a clear limitation to the adoption of QSTS simulations in interconnection studies and for determining optimal control solutions for utility operations. The solutions we developed include accurate and computationally efficient QSTS methods that could be implemented in existing open-source and commercial software used by utilities and the development of methods to create high-resolution proxy data sets. This project demonstrated multiple pathways for speeding up the QSTS computation using new and innovative methods for advanced time-series analysis, faster power flow solvers, parallel processing of power flow solutions and circuit reduction. The target performance level for this project was achieved with year-long high-resolution time series solutions run in less than 5 minutes within an acceptable error.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Regulation and Oscillation Damping Contributions of Variable-Speed Wind Generators in the U.S. Eastern Interconnection (EI)

The U.S. Eastern Interconnection (EI) is one of the largest electric power grids in the world and is expected to have difficulties in dealing with frequency regulation and oscillation damping issues caused by the increasing wind power. On the other side, variable-speed wind generators can actively engage in frequency regulation or oscillation damping with supplementary control loops. This paper creates a 5% wind power penetration simulation scenario based on the 16 000-bus EI system dynamic model and developed the user-defined wind electrical control model in PSS (R) E that incorporates additional frequency regulation and oscillation damping control loops. We evaluated the potential contributions of variable-speed wind generations to the EI system frequency regulation and oscillation damping, and simulation results demonstrate that current and future penetrations of wind power are promising in the EI system frequency regulation and oscillation damping.

17 WIND ENERGY↗

The SPACE Computer Code for Analyzing the International Space Station Electrical Power System: Past, Present, and Future

The System Power Analysis for Capability Evaluation (SPACE) computer code was initially developed by NASA in 1988 to assess the Space Station Freedom electric power system and later adapted to support contractor electrical power system capability analyses for the International Space Station (ISS). Over time, the code has supported many efforts such as ISS redesign activities in the early 1990s, assessment of time-phased loads against power system operating limits for future ISS assembly flights (including Certification of Flight Readiness reviews by the ISS program office), and determining the optimum solar array gimbal positions while respecting keep-out zones which minimize both solar array contamination and structural loads. The code has been validated by comparisons with ISS on-orbit data in multiple validation episodes. Recent updates to the code include the incorporation of a Lithium-Ion battery model in addition to the Nickel Hydrogen battery model and modifications to the solar array degradation model to better match on-orbit test results. SPACE has also been extended beyond the ISS to include modeling of the Orion Multi-Purpose Crew Vehicle electrical power system (SPACE-MPCV) and Mars Surface Electrical Power Systems (MSEPS). Portions of SPACE were integrated with a trajectory code to form a Solar Electric Propulsion Simulation (SEPSim), which can be used for analyzing solar electric propulsion missions. In addition, SPACE methods and subroutines have been adapted to a multitude of other projects. This paper summarizes the initial code development and subsequent code utilization in the context of the overall ISS program development and on-orbit operations. Recent updates and results from the code are discussed, including preliminary analyses for the Orion power system.

Electrical Power System↗

Deriving Optimal Operational Rules for Mitigating Inter-area Oscillations

This paper introduces a new method to mitigate inter-area oscillations of a large scale interconnected power system by means of generation re-dispatch. The optimal operational control procedures are derived as the shortest distance from the current operating condition to a desired damping ratio of the oscillation mode by adjusting generator outputs. A sensitivity based method is used to select the most effective generators for generation re-dispatch and decision tree is trained to approximate the security boundary in a space characterized by the selected generators. The optimal operational rules can be found by solving an optimization problem where the boundary constraints are provided by the decision tree rules. This method is tested on a Western Electricity Coordinating Council (WECC) 179-bus simplified network model and simulation results have demonstrated the proof of concept and shown promising application in real time operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced CO 2 Capture Solvent Systems for Dynamic Power Generation

RTI International, in collaboration with Pacific Northwest National Laboratory (PNNL), Carbon Capture Simulation for Industry Impact (CCSI 2 ), Electricity Power Research Institute (EPRI), and West Virginia University (WVU), successfully completed a joint research effort in developing a cost-effective, resilient, load-following advanced CO 2 capture technology for natural gas power plants. The project’s objective was to develop a CO 2 capture process that maximizes the net present value (NPV) of the electricity sale by minimizing the levelized cost of electricity (LCOE) under dynamic plant loads and high renewable penetration environments. The two key innovations developed in this project were the use of (i) advanced water-lean solvents (WLSs) and (ii) process intensification equipment, such as a rotating packed bed (RPB) absorber and dual-stage flash regeneration. The process’s low CO 2 capture cost is realized through WLSs’ low energy required for solvent regeneration, which lowers the operating cost while RPBs intensify the absorption process and reduces the power plant capital cost. A suite of advanced computational and simulation packages was implemented to guide the process design, validate the dynamic response of the capture plant, evaluate system-wide performance, and maximize the power plant’s profit. The project also engaged with power producers and other stakeholders to ensure its technical relevance and techno-economic viability. The development of this highly disruptive CO 2 capture technology could accelerate the industry adoption and thereby lower the greenhouse gas emissions of the U.S. power sector. Deployment of this technology can increase the reliability and decrease the cost of electricity generation in the U.S. by enabling the use of low-carbon fossil fuels to balance fluctuations of renewable energy availability.

03 NATURAL GAS↗

Aerospace Test Facilities at NASA LeRC Plumbrook

An overview of the facilities and research being conducted at LeRC's Plumbrook field station is given. The video highlights four main structures and explains their uses. The Space Power Facility is the world's largest space environment simulation chamber, where spacebound hardware is tested in simulations of the vacuum and extreme heat and cold of the space plasma environment. This facility was used to prepare Atlas 1 rockets to ferry CRRES into orbit; it will also be used to test space nuclear electric power generation systems. The Spacecraft Propulsion Research Facility allows rocket vehicles to be hot fired in a simulated space environment. In the Cryogenic Propellant Tank Facility, researchers are developing technology for storing and transferring liquid hydrogen in space. There is also a Hypersonic Wind Tunnel which can perform flow tests with winds up to Mach 7.

Source record↗

Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

Mason, Lee↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as 3 radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS which was developed by Johns Hopkins UniversityApplied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitive, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile, and transient voltage and current data during load turn-on/turn-off. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus over-voltage, under-voltage and a dead bus recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus.

Dugala, Gina M.↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include long-duration flyby, orbital, lander, or rover applications where generating power from sunlight may be limited. Radioisotope power systems (RPSs) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past 16 years, NASA Glenn Research Center has been supporting the development of RPSs. The advanced Stirling radioisotope generator (ASRG) utilized a pair of advanced Stirling convertors (ASCs). Although flight development of the ASRG has been canceled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct-current output voltage for the spacecraft, and synchronizes the piston motion of the two convertors to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot-end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies, Inc., has designed, developed, and tested an ASC control unit engineering development unit (ACU EDU) to support this effort. GRC used the ACU EDU as part of its nonnuclear representation of a RPS that also consists of a Dual advanced Stirling convertor simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built with flexibility to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as three radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS that was developed by Johns Hopkins University Applied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitor, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile and transient voltage and current data during load turnon and turnoff. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus overvoltage, undervoltage, and a "dead bus" recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus. The results of these tests are presented here.

General↗

Framework for Large-scale Implementation of Wholesale-Retail Transactive Control Mechanism

Transactive energy is a control technique that uses market mechanisms to achieve desired control objectives. Several simulation studies and field demonstrations were carried out in recent years, but all focused on small scale systems and purpose-built simplified models which are not always capable of pointing out all the advantages and shortcomings of transac- tive energy methods. This work describes a co-simulation framework built on a hierarchical control architecture that allows for conducting studies of the impacts of a very large-scale deployment of transactive energy. The hierarchical transactive control architecture adopted in this work helps with alleviating computation and communication burden to facilitate a more effective large scale real-time market operation among device level resources and the system level operators. The co-simulation framework is evaluated an integrated power sys- tem model of unprecedented scale composed of the Western Electricity Coordination Council (WECC) transmission system with tens of thousands of distribution systems deployed with flexible device-level distributed energy resources (DERs) using off-the-shelf simulators.

Transactive energy, market-based controls, DER int↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

Solar Power Satellite antenna phase control system hardware simulation, phase 4. Volume 3: SOLARSIM users manual

Documentation of the interactive software package designed to predict the effect of certain electrical and mechanical imperfections on the performance of the SPS system is presented. The capabilities of the SOLARSIM program to quantify the spacetenna performance parameter values are described. The SOLARSIM package can compute the RMS pointing error, title effects, MPTX code tracking loop performance, MPTX carrier tracking loop performance, averaged power pattern, and the power transfer efficiency.

Lindsey, W. C.↗

A Multi-Level Grid Interactive Bi-directional AC/DC-DC/AC Converter and a Hybrid Battery/Ultra-capacitor Energy Storage System with Integrated Magnetics for Plug-in Hybrid Electric Vehicles

This study presents a bi-directional multi-level power electronic interface for the grid interactions of plug-in hybrid electric vehicles (PHEVs) as well as a novel bi-directional power electronic converter for the combined operation of battery/ultracapacitor hybrid energy storage systems (ESS). The grid interface converter enables beneficial vehicle-to-grid (V2G) interactions in a high power quality and grid friendly manner; i.e, the grid interface converter ensures that all power delivered to/from grid has unity power factor and almost zero current harmonics. The power electronic converter that provides the combined operation of battery/ultra-capacitor system reduces the size and cost of the conventional ESS hybridization topologies while reducing the stress on the battery, prolonging the battery lifetime, and increasing the overall vehicle performance and efficiency. The combination of hybrid ESS is provided through an integrated magnetic structure that reduces the size and cost of the inductors of the ESS converters. Simulation and experimental results are included as prove of the concept presenting the different operation modes of the proposed converters.

25 ENERGY STORAGE↗

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗

Dynamic Response Testing in an Electrically Heated Reactor Test Facility

Non-nuclear testing can be a valuable tool in development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and full nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system (Bragg-Sitton, 2005). The current paper applies the same testing methodology to a direct drive gas cooled reactor system, demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. In each testing application, core power transients were controlled by a point kinetics model with reactivity feedback based on core average temperature; the neutron generation time and the temperature feedback coefficient are provided as model inputs. Although both system designs utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility.

Bragg-Sitton, Shannon M.↗

Benchmarking of Planning Models Using Recorded Dynamics

Power system planning extensively uses model simulation to understand the dynamic behaviors and determine the operating limits of a power system. Model quality is key to the safety and reliability of electricity delivery. Planning model benchmarking, or model validation, has been one of the central topics in power engineering studies for years. As model validation aims at obtaining reasonable models to represent dynamic behavior of power system components, it has been essential to validate models against actual measurements. The development of phasor technology provides such measurements and represents a new opportunity for model validation as phasor measurements can capture power system dynamics with high-speed, time-synchronized data. Previously, methods for rigorous comparison of model simulation and recorded dynamics have been developed and applied to quantify model quality of power plants in the Western Electricity Coordinating Council (WECC). These methods can locate model components which need improvement. Recent work continues this effort and focuses on how model parameters may be calibrated to match recorded dynamics after the problematic model components are identified. A calibration method using Extended Kalman Filter technique is being developed. This paper provides an overview of prior work on model validation and presents new development on the calibration method and initial results of model parameter calibration.

Huang, Zhenyu↗