Search NASA⌕ Search

SEARCH · Search NASA

Results for “Injection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Basin-scale study of CO 2 storage in stacked sequence of geological formations

Commercial scale decarbonization through carbon capture and storage may likely involve many CO 2 storage projects located in close proximity. The close proximity could raise concerns over caprock integrity associated with reservoir pressure buildup and interference among adjacent projects. Commercial-scale injection will also require large prospective CO 2 storage resource and high injectivity in the targeted storage formations. To accommodate the need for both large resource and high injectivity, project operators could consider injecting CO 2 into a stacked sequence of formations. This analysis investigates the benefits of injecting CO 2 into a vertically stacked sequence of saline formations, over injecting the same amount of CO 2 into a single saline formation, in addressing these challenges. Our analysis shows that injecting into the stacked sequence mitigates the extent of pressure buildup among the stacked formations, while still achieving the same or greater target CO 2 storage volumes. Among cases modeled, the resulting pressure buildup front is most reduced when each storage site distributes injection volumes over several wells, each of which injects a portion of the total CO 2 mass across the stacked sequence. This favorable case not only results in the smallest CO 2 aerial footprint, but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 46% compared to the single-formation storage), the result of which is crucial to maintain caprock integrity. This analysis provides insights into required decision-making when considering multi-project deployment in a shared basin.

42 ENGINEERING↗

Dynamics of metastable contact soliton dissipative exchange flows in one-dimensional ferromagnetic channels

Dissipative exchange flows (DEFs) are large-amplitude boundary value solutions of ferromagnetic channels. In their low-injection limit, DEFs reduce to spin superfluids. However, in the strong injection limit, nonlinearities dominate close to the injection site and a soliton is formed; this solution has been termed a contact soliton dissipative exchange flow (CS-DEF). Here, in this work, we numerically investigate CS-DEF solutions in a moderate injection regime and a finite injection width. We find a solution where two metastable solitons coexist in the injection region. This solution is metastable in the sense that any perturbation to the system will eject one of the solitons out of the injection region. Moreover, soliton dynamics can be excited when two injection regions are separated by a certain distance. We find that the ensuing DEF between the solitons induces a steady-state dynamics in which metastable solitons are continually ejected and nucleated. Furthermore, and depending on the relative signs of the spin injections, the soliton dynamics possess a particular handedness and frequency related to the spin transfer torque delivered by the DEF. Our results provide insights into the transport of spin current by DEFs - where the interaction between DEFs and solitons suggests a mechanism for detaching contact-solitons from the injection boundary. Although this study focuses on the "nonlocal" interaction between solitons, it may lead to the investigation of new mechanisms for inserting solitons in a DEF, e.g., for discrete motion and transport of information over long distances.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Dual-Fuel Ammonia Equivalence Ratio Sweep Data

Ammonia (NH3) has garnered significant interest as an alternative fuel for meeting international emissions reduction mandates in sectors with high weight and distance requirements, such as shipping. Technical barriers and unanswered questions remain on the combustion strategies that can maximize ammonia utilization and minimize emissions. Prior research studies at the US Department of Energy’s Oak Ridge National Laboratory have shown strong performance with NH3 under dual-fuel mode using conventional diesel combustion (CDC) manifold air pressure settings. Diesel airflow was initially used to simplify retrofitting (no turbocharger modification), which resulted in air-fuel equivalence ratios (λ) greater than 1.5. To characterize potential improvements in dual-fuel NH3 combustion performance at richer in-cylinder conditions, a global λ sweep compared the use of early (E-pilot) and late (L-pilot) single diesel injections. The experiments were conducted at 1200 RPM and 12.8 ± 0.2 bar (75 % load), and λ was varied by decreasing the commanded air flow to the engine at greater than 90 % ammonia energy substitution level. A diesel injection timing sweep was conducted for both the injection strategies at fixed λ, and the timing with the lowest engine-out N2O emissions was identified. The results indicated an optimal balance between CO2,eq and thermal efficiency benefits both E-pilot and L-pilot injection strategy cases compared with CDC at a λ of 1.4. The indicated nitrogen-based emissions exhibited a strong correlation to the ratio of CA5–50 and ignition delay for L-pilot, but no apparent trend emerged for the E-pilot injection strategy at the tested boundary conditions. This dataset includes the raw experimental data and documentation of the experiment conditions and methods.

30 DIRECT ENERGY CONVERSION↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Establishing a silica gel zone in well annulus and evaluating its performance in blocking vertical water flow

Wells are often constructed for monitoring purposes with relatively long screen lengths (e.g., >10 m). Vertical water flows can occur within the artificial or natural filterpack annulus that surrounds the screened interval, bypassing packer assemblies installed inside the wellbore. Attempts to isolate discrete vertical zones during groundwater sampling are unsuccessful when annular flow occurs and lead to remedy decisions based on biased or incorrect interpretations. Blocking vertical annular water flow and contaminant transport will help obtain more accurate concentrations of contaminants from sampling in targeted depth intervals. The application of silica gels formed from the injected colloidal silica CS suspensions is a novel approach to minimize or prevent movement of vertical movement of groundwater in the surrounding filterpack annulus. In this work, we tested the feasibility of injecting CS suspensions to target locations and developed a modified CS formulation that is injectable and prevents gravity sinking. We studied the distribution and penetration of silica gel at laboratory scale in mock well annulus with surrounding formations. We evaluated the performance of the silica gel in blocking vertical water flow in the annulus and in minimizing chemical transport through the gel zone. CS suspension formulations have been defined that are ready for injection, stay in target locations, and form gel within desired time frames. Injection of CS suspensions achieved uniform distribution in a well annulus filter pack, fully occupied the annulus pore space, and penetrated the formation surrounding the filter packer with a sufficient distance to create a hydraulic annular seal when the injection was applied at a sufficient rate. The depth of penetration into the formation was dependent on the permeability contrast between the filter pack and the surrounding formation. Silica gel that formed in the annulus blocked vertical water flow and stopped the chemical transport through the gel zone. In conclusion, this research reveals that using CS suspension injection and sequential gelation (CS-GEL) is a promising technology for blocking vertical water flow and chemical transport through the filter pack in targeted zones within the annulus of long-screened well systems.

Colloidal silica suspension↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Transportability of exogenous microbial community correlates with interwell connectivity in deep aquifers

Subsurface resource engineering operations often utilize continuous injection of externally-sourced water into geological reservoirs for formation pressure maintenance, resource recovery or energy/waste storage. Such injected water generally contains naturally occurring microbes. Little is known, however, about how the injectate microbes transport through geological media as a community, how such transportability is affected by injector-producer connectivity, and whether such knowledge can be utilized for flowpath characterization. In this study, we analyzed daily-to-weekly timeseries microbial community data from the injected- and produced-fluids of a ten-month flow test at a deep, well-characterized engineered aquifer. We found that the injectate microbial community was distinct from the indigenous community at the amplicon sequence variant (ASV) level, and that the transportability of injectate community towards a given producer, quantified by an “nASV-Overlap” metric we propose, had strong and significant positive correlation with known injector-producer connectivities at our site. This suggests that the better the connectivity, the higher the probability for more injectate species to flow through the interwell region and arrive at a producer. Because interwell connectivity is an important yet usually unknown parameter in subsurface resource engineering, such correlation in turn points to nASV-Overlap as a useful indicator of interwell connectivity for aquifer characterization and long-term monitoring. Based on our findings, an nASV-Overlap-based microbial tracing approach was developed for characterizing and monitoring the relative connectivities across multiple producers with a given injector. A side-by-side comparison between the new nASV-Overlap approach and traditional artificial tracer methods is presented, and their respective strengths and limitations are discussed.

Deep biosphere↗

Contact solitons as spin pistons in one-dimensional ferromagnetic channels

Ferromagnetic channels subject to spin injection have been theoretically shown to sustain dissipative exchange flows (DEFs). In the strong injection regime, a soliton is stabilized at the injection site, which has been termed a contact soliton DEF or CS-DEF. Here, in this work, we investigate the modulation of CS-DEFs as a mechanism to inject magnons into a DEF. By varying the injection current, the parameters connecting the soliton with the DEF via a boundary layer are varied. These lead to a modification in the DEF which is interpreted as a spin piston. The injected magnons follow the expected dispersion relation of DEFs, akin to the Bogoliubov–de Gennes dispersion relation. As a result, this work demonstrates that changes in the injected current can pump magnons along a ferromagnetic channel via dissipative exchange flows.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Assessment of BPM options for the EIC Beam Accumulator Ring

The electron injection system for the Electron-Ion Collider (EIC) at BNL is designed to provide a beam of polarized electrons, which is crucial for studying the structure of protons and atomic nuclei. The Beam Accumulator Ring (BAR) is a part of the injection chain between the 750 MeV linear accelerator and the Rapid Cycling Synchrotron (RCS), which accelerates the beam up to full energy (5–18 GeV). The functional role of the BAR is to accumulate the charge injected from the linear accelerator in order to achieve the high intensity of the polarized electron beam required by the specifications for injection into the RCS. This objective will be realized through the sequential injection of bunches with a charge of 1.1 nC at a repetition rate of 30 Hz. Once the charge of a single bunch reaches 28 nC, the beam will be extracted from the BAR and injected into the RCS. The beam instrumentation needs to provide reliable measurements with the required accuracy over the dynamic range from 0.1 nC (one tenth of a typical injected bunch charge) to 32 nC – the maximum expected accumulated current. There are 10 Beam Position Monitors (BPMs) in the ring, 1 extra button-electrode assembly for the RF system, and 8 BPMs in the beam transport lines. The BPM locations are shown in Fig. 1, marked by blue rectangles. The ring BPMs will be capable of both average orbit and turn-by-turn measurement modes. Accurate measurement of the beam position with a large horizontal offset requires polynomial correction of the BPM nonlinearity.

43 PARTICLE ACCELERATORS↗

Defining Infrastructure Feasibility for Hub-Scale Offshore Atlantic Carbon Storage in the Northeastern United States

In the Northeast U.S., deep rock formations along the Atlantic outer continental shelf may have the potential to sequester 150–1136 million metric tons of CO2. However, the design and infrastructure necessary to develop offshore carbon storage in this region is not well defined because there has been little oil and gas exploration and no commercial production. Consequently, an infrastructure feasibility design was completed for a hub-scale offshore CO2 storage system along the Northeast U.S. Atlantic. The design included development of a detailed, site-specific geological model for a location near the Great Stone Dome geological structure in the Baltimore Canyon Trough off the coast of Delaware, Maryland, and New Jersey. A field injection system topology design was completed to portray a design with eight wells in two clusters connected by central manifolds. Reservoir simulations were completed for the injection system that showed the hub may be able to inject 17 million metric tons (MMT) of CO2 per year for thirty years, but injection rates varied substantially across the eight wells. A CO2 pipeline design determined feasible routes from the east coast shoreline to the injection field. Finally, the CO2 injection system design included subsea injection trees, manifolds, and power umbilicals. This is the first study to define large-scale carbon storage design and infrastructure options for the offshore Atlantic, which can help to progress this region towards field characterization and early-mover deployment for future decarbonization in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design of a High-Pressure Fuel System for Use with Dimethyl Ether

The paper documents the modeling and experimental work on a common rail fuel injection system for Dimethyl Ether, a potential diesel substitute with a low carbon intensity signature. The DME fuel system is deployed on a light duty 2.2L compression ignition engine. The paper describes the injector optimization to shift to higher flows to account for the lower heating value and density of the DME when compared to diesel. The type of the injection system used for the DME application is an advanced rendering of the Common rail noted for a one-piece piston-needle injector construction and a solenoid driven spill valve featuring a pressure balanced poppet. A dedicated high-pressure fuel pump designed to pressurize DME is used. The design results in a fast acting open and close injection event, reduced leakage, with reduced cavitation in the fuel injector volume. Design parameters for system optimization included fill and spill orifices, needle lift, bias spring, and injector hole size. The design model provides good correlation of the instantaneous rates of injection with experiments across a wide range of pressure and injection timings. Proposed performance milestones for the design included similar DME injection duration to the diesel counterpart for same fuel energy injected into the cylinder to retain high engine cycle efficiency. Here, the dedicated DME design provided reduced hydraulic delays of 50%. Tests demonstrated sustained operation at pressures of 1000 bar, with capability to reach 1500bar. Durability tests showed no cavitation-deterioration over a 200-hour test cycle by means of spray imaging and hardware inspection.

De Ojeda, William [WM International Engineering, L↗

Understanding the interplay between pilot fuel mixing and auto-ignition chemistry in hydrogen-enriched environment

The diesel-piloted dual-fuel compression ignition combustion strategy is well-suited to accelerate the decarbonization of transportation by adopting hydrogen as a renewable energy carrier into the existing internal combustion engine with minimal engine modifications. Despite the simplicity of engine modification, many questions remain unanswered regarding the optimal pilot injection strategy for reliable ignition with minimum pilot fuel consumption. The present study uses a single-cylinder heavy-duty optical engine to explore the phenomenology and underlying mechanisms governing the pilot fuel ignition and the subsequent combustion of a premixed hydrogen-air charge. The engine is operated in a dual-fuel mode with hydrogen premixed into the engine intake charge with a direct pilot injection of n-heptane as a diesel pilot fuel surrogate. Optical diagnostics used to visualize in-cylinder combustion phenomena include high-speed IR imaging of the pilot fuel spray evolution as well as high-speed HCHO* and OH* chemiluminescence as indicators of low-temperature and high-temperature heat release, respectively. Three pilot injection strategies are compared to explore the effects of pilot fuel mass, injection pressure, and injection duration on the probability and repeatability of successful ignition. The thermodynamic and imaging data analysis supported by zero-dimensional chemical kinetics simulations revealed a complex interplay between the physical and chemical processes governing the pilot fuel ignition process in a hydrogen containing charge. Hydrogen strongly inhibits the ignition of pilot fuel mixtures and therefore requires longer injection duration to create zones with sufficiently high pilot fuel concentration for successful ignition. Results show that ignition typically tends to rely on stochastic pockets with high pilot fuel concentration, which results in poor repeatability of combustion and frequent misfiring. In conclusion, this work has improved the understanding on how the unique chemical properties of hydrogen pose a challenge for maximization of hydrogen’s energy share in hydrogen dual-fuel engines and highlights a potential mitigation pathway.

33 ADVANCED PROPULSION SYSTEMS↗

Modeling the effect of MHD activity on runaway electron generation during SPARC disruptions

Magnetohydrodynamic (MHD) instabilities and runaway electrons (REs) interact in several ways, making it important to self-consistently model these interactions for accurate predictions of RE generation and the design of mitigation strategies, such as massive gas injection (MGI). Using M3D-C1 – an extended MHD code with a RE fluid model – we investigate the effects of 3-D nonlinear MHD activity, material injection, and 2-D axisymmetric vertical displacement events (VDEs) on RE evolution during disruptions on SPARC – a high-field, high-current tokamak designed to achieve a fusion gain Q > 1. Several cases, comprising different combinations of neon (Ne) and deuterium (D 2 ) injection, are considered. Here, our results demonstrate key effects that arise from the self-consistent RE + MHD coupling, such as an initial increase in RE generation due to MHD instability growth, decreased saturation energies of the m/n = 1/1 mode driving sawteeth-like activity, RE losses in stochastic magnetic fields, and subsequent RE confinement and plateau formation due to re-healing of flux surfaces. Large RE plateaus (>5 MA) are obtained with Ne-only injection (2-5 × 10 21 atoms), while combined D 2 + Ne injection (2 × 10 21 Ne atoms; 1.8 × 10 22 D 2 molecules) produces a lower RE current (<2 MA). With D 2 + Ne injection, a post thermal quench "cold" VDE terminates the RE beam, preventing a steady plateau. These simulations couple REs, 3-D MHD instabilities, MGI, and axisymmetric VDEs for the first time in SPARC disruption simulations and represent a crucial step in understanding RE generation and mitigation in high-current devices like SPARC.

Datta, Rishabh [Massachusetts Inst. of Technology ↗

Particle-in-cell simulation of laser wakefield accelerators with oblique lasers in quasicylindrical geometry

In the studies of optical injections in laser or beam-driven wakefield accelerators, there is a frequent demand for using obliquely propagating assistant lasers in particle-in-cell simulations. In conventional methods, this is only possible in either two- or three-dimensional Cartesian geometries, which have the drawbacks of either lack of fidelity for the actual situation or requiring a huge amount of computational resources. In this work, we develop a new method that uses an expression-defined oblique laser field to simulate such situations in quasicylindrical geometry particle-in-cell simulations, having the advantages of both maintaining good fidelity and saving computational resources. As an example, we use this method in the scissor-cross ionization injection scheme for the optimization of the injected beam quality. This method is widely applicable to particle injections with assistant lasers in wakefield accelerators, as long as the assistant lasers only influence the injected particles during the injection process. Published by the American Physical Society 2025

Ma, Minghao (ORCID:0009000602317775)↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗