Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Coordinating "Execute" Data for ISS and Space Shuttle

The Joint Execute Package Development and Integration tool is a Web utility program that provides an integrated capability to generate and manage messages and execute package data for members of a space shuttle and the International Space Station (ISS). (An execute package consists of flight plans, short-term plans, procedure updates, data needed to operate the space-shuttle and ISS systems, in-flight maintenance procedures, inventory-stowage data, software upgrades, flight notes, scripts for publicized events, and other instructions.) This program is a third-generation "execute"-package Web tool, built on experience gained from two programs used previously to support realtime operations. This program provides integration and synchronization between the space-shuttle and ISS teams during joint operations. Hundreds of messages per week must be uplinked as "joint" messages; that is, messages for crewmembers of both spacecraft. The program includes configuration-management components that ensure that the same message goes to both crews and spacecraft, effectively eliminating the potential for error in manual direction of messages. The program also controls the format and layout of the crews Web pages, ensuring consistency between uplinks. If the crews Web pages were edited manually, hyperlink and formatting errors would be common.

Whitney, Greg↗

Interactive method for planning constrained, fuel-optimal orbital proximity operations

An interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station is presented. The method allows the operator to compose a multi-burn transfer trajectory between arbitrary initial chaser and target trajectories. The available task time of the mission is limited and the maneuver is subject to various operational constraints, such as departure, arrival, plume impingement and spatial constraints. The maneuvers are described in terms of the relataive motion experienced in a Space-Station centered coordinate system. The optimization method is based on the primer vector and its extension to non-optimal trajectories. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparaent and continuously active background computations, allows the operator to make fast, iterative design changes which rapidly converge to fuel-efficient solutions. The optimization functions are presented. A variety of simple design examples has been presented to demonstrate the usefulness of the method. In many cases the addition of a properly positioned intermediate waypoint resulted in fuel savings of up to 30%. Furthermore, due to the counter-intuitive character of the optimization functions, most fuel-optimal solutions could not have been found without the aid of the optimization tools. Operating the system was found to be very easy, and did not require any previous in-depth knowledge of orbital dynamics or trajectory. The planning tool is an example of operator assisted optimization of nonlinear cost-functions.

Abramovitz, Adrian↗

Development of the command data system and ground software for the SEDSAT-1 microsatellite

SEDSAT-1 is designed to be a low cost scientific satellite which is to be used to perform a minimum of five tasks which include: (1) the acquisition of a number of important parameters associated with the tethering processes from the payloads perspective (such as accelerations incurred and imaging data of the tether during deployment), (2) to act as a remote sensing platform for making measurements of the Earth's Atmosphere (allowing research to be performed in such areas as vertical lightning observation, visible light spectrography, and cloud cover studies, (3) to act as a general purpose amateur radio communication satellite relaying information back to earth, (4) to demonstrate the feasibility of the deployment in low earth orbit of advanced technology such as the Gallium Arsenide Solar Cells, Nickel Metal Hydride batteries, and multi-chip module technology and, (5) to support student's active participation in applying the disciplines of engineering and science to space-based hardware platforms. The project includes the Three-axis Accelerometer System, TAS, Experiment which is designed to report the accelerations that the satellite undergoes during the tethering operations and during the second phase of the mission when the free floating satellite comes in contact with orbit debris. The SEASIS (SEDS Earth, Atmosphere, and Space Imaging System) is another SEDSAT experiment designed to provide images of the tether during its deployment and the earth during the second phase of the mission. To control these experiments and virtually all other satellite operations the Command Data System, CDS is employed. This system utilizes a moderate complexity micro-controller controlled by tasks operating under a real-time operating system to dynamically monitor and control the satellite. The scope of this researchers efforts has been in the general area of coordinating and assisting the student researchers with the development of the CDS and ground station interfaces. This included the low level CDS hardware design and the formulization of a general software plan and schedule for both the CDS and ground station portions of the project.

Wells, B. Earl↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

A space systems perspective of graphics simulation integration

Creation of an interactive display environment can expose issues in system design and operation not apparent from nongraphics development approaches. Large amounts of information can be presented in a short period of time. Processes can be simulated and observed before committing resources. In addition, changes in the economics of computing have enabled broader graphics usage beyond traditional engineering and design into integrated telerobotics and Artificial Intelligence (AI) applications. The highly integrated nature of space operations often tend to rely upon visually intensive man-machine communication to ensure success. Graphics simulation activities at the Mission Planning and Analysis Division (MPAD) of NASA's Johnson Space Center are focusing on the evaluation of a wide variety of graphical analysis within the context of present and future space operations. Several telerobotics and AI applications studies utilizing graphical simulation are described. The presentation includes portions of videotape illustrating technology developments involving: (1) coordinated manned maneuvering unit and remote manipulator system operations, (2) a helmet mounted display system, and (3) an automated rendezous application utilizing expert system and voice input/output technology.

Brown, R.↗

International Satellite Cloud Climatology Project

The International Satellite Cloud Climatology Project (ISCCP) was established as the first project of the World Climate Research Programme (WCP-2) to collect and analyze satellite radiance measurements to infer the global distribution of cloud radiative properties and their diurnal and seasonal variations. The operational phase of ISCCP began in July 1983 and is currently planned to continue through June 2010. [Mission Objectives] To produce a global, reduced resolution, infrared and visible, calibrated and normalized radiance data set containing basic information on the radiative properties of the atmosphere from which cloud parameters can be derived. To stimulate and coordinate basic research on techniques for inferring the physical properties of clouds from the condensed radiance data set and to apply the resulting algorithms to derive and validate a global cloud climatology for improving the parameterization of clouds in climate models. To promote research using ISCCP data and contributing to improved understanding of the Earth's radiation budget (top of the atmosphere and surface) and hydrological cycle. [Temporal_Coverage: Start_Date=1983-07-01; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180].

Rossow, William B.↗

The navigation system of the JPL robot

The control structure of the JPL research robot and the operations of the navigation subsystem are discussed. The robot functions as a network of interacting concurrent processes distributed among several computers and coordinated by a central executive. The results of scene analysis are used to create a segmented terrain model in which surface regions are classified by traversibility. The model is used by a path planning algorithm, PATH, which uses tree search methods to find the optimal path to a goal. In PATH, the search space is defined dynamically as a consequence of node testing. Maze-solving and the use of an associative data base for context dependent node generation are also discussed. Execution of a planned path is accomplished by a feedback guidance process with automatic error recovery.

Thompson, A. M.↗

Integrated Extravehicular Activity Human Research Plan: 2017

Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.

Abercromby, Andrew↗

NASA's Geoscience Training Program for Astronauts

Geoscientists have been training and preparing astronauts to observe the Earth from space and explore other planetary surfaces with a legacy that reaches back to the early days of the space program. Continuing this legacy and critical function, a core NASA team has been closely coordinating with the Johnson Space Center (JSC) Flight Operations Directorate (FOD) as well as academic, institute, and other governmental partners to conduct a comprehensive geoscience training program that ranges from initial astronaut candidate training to preparing crew for Artemis missions. Described below are the three program training phases, along with recent program highlights and forward planning.

Graff, T. G.↗

Overview of JAXA and NASA Collaboration on Manned and Unmanned Aircraft Operations Integration in Disaster Response

Natural disasters have increased in frequency and intensity. With that increase has come an increased focus on improving disaster response efforts. As part of this focus, the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) have been in collaboration since 2016 to explore improved airspace management for disaster response through the integration of manned aircraft and small Unmanned Aircraft Systems (UAS). The approach to this integration has been through leveraging JAXA’s Disaster Relief Aircraft Information Sharing Network (D-NET) system for the coordinated management of manned aircraft assets combined with NASA’S UAS Traffic Management (UTM) system for the management of UAS assets. To drive the innovation in improved response, JAXA and NASA have successfully connected respective systems and conducted a series of live flight tests first as part of a large-scale disaster drill and later in dedicated research flights. In each case, the D-NET and UTM systems were connected and exchanged data in real-time, which supported the planning and tracking of manned and unmanned operations. Through these test events, a number of key findings were derived through data analysis and stakeholder interviews with respect to the improvements offered by the integrated systems as well as key considerations for situation awareness of pilots regarding other operations in the airspace and flight path management.

disaster response↗

Photogrammetric Metrology for the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approximately 40K). The JWST Observatory architecture includes the Optical Telescope Element and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The ISM optical metering structure is a roughly 2.2x1.7x2.2m, asymmetric frame that is composed of carbon fiber and resin tubes bonded to invar end fittings and composite gussets and clips. The structure supports the SIs, isolates the SIs from the OTE, and supports thermal and electrical subsystems. The structure is attached to the OTE structure via strut-like kinematic mounts. The ISIM structure must meet its requirements at the approximately 40K cryogenic operating temperature. The SIs are aligned to the structure's coordinate system under ambient, clean room conditions using laser tracker and theodolite metrology. The ISIM structure is thermally cycled for stress relief and in order to measure temperature-induced mechanical, structural changes. These ambient-to-cryogenic changes in the alignment of SI and OTE-related interfaces are an important component in the JWST Observatory alignment plan and must be verified. We report on the planning for and preliminary testing of a cryogenic metrology system for ISIM based on photogrammetry. Photogrammetry is the measurement of the location of custom targets via triangulation using images obtained at a suite of digital camera locations and orientations. We describe metrology system requirements, plans, and ambient photogrammetric measurements of a mock-up of the ISIM structure to design targeting and obtain resolution estimates. We compare these measurements with those taken from a well known ambient metrology system, namely, the Leica laser tracker system. We also describe the data reduction algorithm planned to interpret cryogenic data from the Flight structure. Photogrammetry was selected from an informal trade study of cryogenic metrology systems because its resolution meets sub-allocations to ISIM alignment requirements and it is a non-contact method that can in principle measure six degrees of freedom changes in target location. In addition, photogrammetry targets can be readily related to targets used for ambient surveys of the structure. By thermally isolating the photogrammetry camera during testing, metrology can be performed in situ during thermal cycling. Photogrammetry also has a small but significant cryogenic heritage in astronomical instrumentation metrology. It was used to validate the displacement/deformation predictions of the reflectors and the feed horns during thermal/vacuum testing (90K) for the Microwave Anisotropy Probe (MAP). It also was used during thermal vacuum testing (100K) to verify shape and component alignment at operational temperature of the High Gain Antenna for New Horizons. With tighter alignment requirements and lower operating temperatures than the aforementioned observatories, ISIM presents new challenges in the development of this metrology system.

Nowak, Maria↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Telerobotic research for in-space structural assembly and servicing

The paper reviews Langley's Telerobotic Technology Program and the recent and planned research in automated space assembly. Research areas include multiple manipulator coordination and control, automatic modes, evaluation of control modalities for teleoperated tasks, active sensing for world modeling and control, and architectures for distributed telerobotic systems. Studies of master/slave teleoperators performing representative space tasks showed that current teleoperator systems can be used to accomplish remote space operations. These studies also identified that research is required to improve the systems to reduce operator workload and task completion time. Closed-loop noncontact and contact sensor based control for automatic acquisition, positioning, and active compliance have been developed. A control structure for multiple manipulator coordination and control with manual, shared, and automatic modes performing space type tasks is being evaluated.

Meintel, Alfred J., Jr.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

The Synergy of Gamma-Ray Burst Detectors In The Glast Era

Simultaneous observations by the large number of gamma-ray burst detectors operating in the GLAST era will provide the spectra, lightcurves and locations necessary for studying burst physics and testing the putative relations between intrinsic burst properties. The detectors' energy band and the accumulation timescale of their trigger system affect their sensitivity to hard vs. soft and long vs. short bursts. Coordination of the Swift and GLAST observing plans consistent with Swift's other science objectives could increase the rate of GLAST bursts with redshifts.

Band, David L.↗

Human Spaceflight Trajectory Operations: A Case Study from STS-132/ULF4

Prior to the launch of the STS-132/ULF4 mission, the International Space Station (ISS) Flight Control Team was alerted to the approach of a space debris with a predicted time of closest approach approximately 1 hr after Space Shuttle docking. As a result, the ISS team considered performing a collision avoidance maneuver prior to the Space Shuttle s approach. The purpose of this presentation will be to use this case study to illustrate best practices of the human spaceflight trajectory operations team. The presentation will begin with an overview of the roles of the real-time ISS and Space Shuttle trajectory flight control teams. Then, the STS-132/ULF4 case study will be used to illustrate the issues and lessons learned involved in performing Space Shuttle rendezvous maneuver planning and execution. Specific elements of the STS-132 Space Shuttle rendezvous maneuver profile that can be used to provide mission assurance in cases of trajectory uncertainty will be described and discussed. Additionally, this case study will be used to provide context for identifying lessons learned in an operational environment that requires technical and decision-making coordination between two control center teams with two potentially maneuvering space vehicles.

Cutri-Kohart, Rebecca↗

Task Allocation for Single Pilot Operations: A Role for the Ground

Researchers at NASA Ames Research Center and NASA Langley Research Center are jointly investigating issues associated with potential configurations for an environment in which a single pilot, or reduced crew, might operate. The research summarized in this document represents several of the efforts being put forth at NASA Ames Research Center. Specifically, researchers at NASA Ames Research Center coordinated and hosted a technical interchange meeting in order to gain insight from members of the aviation community. A description of this meeting and the findings are presented first. Thereafter, plans for ensuing research are presented.

Johnson, Walter↗