Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Based Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

TAT-C: A Trade-Space Analysis Tool for Constellations

Under a changing technological and economic environment, there is growing interest in implementing future NASA Earth Science missions as Distributed Spacecraft Missions (DSM). The objective of our project is to provide a framework that facilitates DSM Pre-Phase A investigations and optimizes DSM designs with respect to a-priori Science goals. In this first version of our Trade-space Analysis Tool for Constellations (TAT-C), we are investigating questions such as: Which type of constellations should be chosen? How many spacecraft should be included in the constellation? Which design has the best costrisk value? This paper describes the overall architecture of TAT-C including: a User Interface (UI) interacting with multiple users - scientists, missions designers or program managers; an Executive Driver gathering requirements from UI and formulating Trade-space Search Requests for the Trade-space Search Iterator, which in collaboration with the Orbit Coverage, Reduction Metrics, and Cost Risk modules generates multiple potential architectures and their associated characteristics. UI will include Graphical, Command Line and Application Programmer Interfaces to respond to the demands of various levels of users expertise. Science inputs are grouped into various mission concepts, satellite specifications, and payload specifications, while science outputs are grouped into several types of metrics - spatial, temporal, angular and radiometric. Orbit Coverage leverages the use of the Goddard Mission Analysis Tool (GMAT) to compute coverage and ancillary data that are passed to Reduction Metrics. Then, for each architecture design, Cost Risk will provide estimates of the cost and life cycle cost as well as technical and cost risk of the proposed mission. Additionally, the Knowledge Base module is a centralized store of structured data readable by humans and machines. It will support both TAT-C analysis when composing new mission concepts from existing model inputs, and TAT-C exploration when discovering new mission concepts by querying previous results.

Science Data Processing↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Using software security analysis to verify the secure socket layer (SSL) protocol

nal Aeronautics and Space Administration (NASA) have tens of thousands of networked computer systems and applications. Software Security vulnerabilities present risks such as lost or corrupted data, information the3, and unavailability of critical systems. These risks represent potentially enormous costs to NASA. The NASA Code Q research initiative 'Reducing Software Security Risk (RSSR) Trough an Integrated Approach '' offers, among its capabilities, formal verification of software security properties, through the use of model based verification (MBV) to address software security risks. [1,2,3,4,5,6] MBV is a formal approach to software assurance that combines analysis of software, via abstract models, with technology, such as model checkers, that provide automation of the mechanical portions of the analysis process. This paper will discuss: The need for formal analysis to assure software systems with respect to software and why testing alone cannot provide it. The means by which MBV with a Flexible Modeling Framework (FMF) accomplishes the necessary analysis task. An example of FMF style MBV in the verification of properties over the Secure Socket Layer (SSL) communication protocol as a demonstration.

software↗

Ohio River Basin Water Resources: Monitoring Flash Drought Potential and Quantifying the Hydrologic Impacts in the Ohio River Basin

Flash drought conditions emerge in a matter of weeks following persistent weather anomalies, such as high temperatures or large vapor pressure deficits, that drive increased evaporative demand. Vegetation response rapidly depletes soil moisture, threatening surface water supplies, triggering significant crop loss, and increasing wildfire risk. Drought indices sensitive to flash drought are currently not included in drought forecast models in the Ohio River Basin (ORB). The team assessed and compared drought indices, gauge-based data, and satellite measurements over the course of the September 2019 flash drought event in the Ohio River Basin to investigate environmental fingerprints throughout flash drought evolution. Potential leading flash drought indicators were compared to the Standardized Precipitation Index (SPI) to aid the National Weather Service (NWS) Ohio River Forecast Center and Kentucky Climate Center in producing early warning flash drought forecasts. These drought indices included Evaporative Demand Drought Index (EDDI), Standardized Precipitation Evapotranspiration Index (SPEI), and Landscape Evaporative Response Index (LERI) (derived from Terra Moderate Resolution Imaging Spectroradiometer (MODIS)). Drought index behavior inherently varies based on parameters incorporated - EDDI measures evaporative demand through potential evapotranspiration, and demonstrates more variations due to sensitivity to seasonal changes in evaporative demand throughout the 2010-2019 study period. Conversely, LERI measures evaporative response through actual evapotranspiration, representing different environmental changes. Soil moisture response was evaluated using Soil Moisture Active Passive (SMAP) L-band radiometer data and Kentucky Mesonet gauge-based measurements. This analysis enables climatologists and weather forecasters to keep decision-makers and stakeholders better informed about drought risks, and to implement the appropriate actions for preparation of drought onset.

Adelaide Schmid↗

Ohio River Basin Water Resources: Monitoring Flash Drought Potential and Quantifying the Hydrologic Impacts in the Ohio River Basin Utilizing NASA Earth Observations

Flash drought conditions emerge in a matter of weeks following persistent weather anomalies, such as high temperatures or large vapor pressure deficits, that drive increased evaporative demand. Vegetation response rapidly depletes soil moisture, threatening surface water supplies, triggering significant crop loss, and increasing wildfire risk. Drought indices sensitive to flash drought are currently not included in drought forecast models in the Ohio River Basin (ORB). The team assessed and compared drought indices, gauge-based data, and satellite measurements over the course of the September 2019 flash drought event in the Ohio River Basin to investigate environmental fingerprints throughout flash drought evolution. Potential leading flash drought indicators were compared to the Standardized Precipitation Index (SPI) to aid the National Weather Service (NWS) Ohio River Forecast Center and Kentucky Climate Center in producing early warning flash drought forecasts. These drought indices included Evaporative Demand Drought Index (EDDI), Standardized Precipitation Evapotranspiration Index (SPEI), and Landscape Evaporative Response Index (LERI) (derived from Terra Moderate Resolution Imaging Spectroradiometer (MODIS)). Drought index behavior inherently varies based on parameters incorporated -EDDI measures evaporative demand through potential evapotranspiration, and and demonstrates more variations due to sensitivity to seasonal changes in evaporative demand throughout the 2010-2019 study period. Conversely, LERI measures evaporative response through actual evapotranspiration, representing different environmental changes. Soil moisture response was evaluated using Soil Moisture Active Passive (SMAP) L-band radiometer data and Kentucky Mesonet gauge-based measurements. This analysis enables climatologists and weather forecasters to keep decision-makers and stakeholders better informed about drought risks to implement the appropriate actions for preparation of drought onset.

DEVELOP Project Summary↗

Constellation Probabilistic Risk Assessment (PRA): Design Consideration for the Crew Exploration Vehicle

Managed by NASA's Office of Safety and Mission Assurance, a pilot probabilistic risk analysis (PRA) of the NASA Crew Exploration Vehicle (CEV) was performed in early 2006. The PRA methods used follow the general guidance provided in the NASA PRA Procedures Guide for NASA Managers and Practitioners'. Phased-mission based event trees and fault trees are used to model a lunar sortie mission of the CEV - involving the following phases: launch of a cargo vessel and a crew vessel; rendezvous of these two vessels in low Earth orbit; transit to th$: moon; lunar surface activities; ascension &om the lunar surface; and return to Earth. The analysis is based upon assumptions, preliminary system diagrams, and failure data that may involve large uncertainties or may lack formal validation. Furthermore, some of the data used were based upon expert judgment or extrapolated from similar components~systemsT. his paper includes a discussion of the system-level models and provides an overview of the analysis results used to identify insights into CEV risk drivers, and trade and sensitivity studies. Lastly, the PRA model was used to determine changes in risk as the system configurations or key parameters are modified.

Prassinos, Peter G.↗

An Integrated Reliability and Physics-Based Risk Modeling Approach for Assessing Human Spaceflight Systems

This paper presents an integrated reliability and physics-based risk modeling approach for assessing human spaceflight systems. The approach is demonstrated using an example, end-to-end risk assessment of a generic-crewed space transportation system during a reference mission to the International Space Station. The behavior of the system is modeled using analysis techniques from multiple disciplines in order to properly capture the dynamic time- and state- dependent consequences of failures encountered in different mission phases. We discuss how to combine traditional reliability analyses with Monte Carlo simulation methods and physics-based engineering models to produce loss-of- mission and loss-of-crew risk estimates supporting risk-based decision-making and requirement verification. This approach facilitates risk-informed design by providing more realistic representation of system failures and interactions; identifying key risk-driving sensitivities, dependencies, and assumptions; and tracking multiple figures of merit within a single, responsive assessment framework that can readily incorporate evolving design information throughout system development.

Risk assessment↗

Estimating Orion Heat Shield Failure Due To Ablator Cracking During The EFT-1 Mission

The Orion EFT-1 heatshield suffered from two major certification challenges: First, the mechanical properties used in design were not evident in the flight hardware and second, the flight article itself cracked during fabrication. The combination of these events motivated the Orion Program to pursue an engineering-level Probabilistic Risk Assessment (PRA) as part of heatshield certification rationale. The PRA provided loss of Mission (LOM) likelihoods considering the probability of a crack occurring during the mission and the likelihood of subsequent structure over-temperature. The methods and input data for the PRA are presented along with a discussion of the test data used to anchor the results. The Orion program accepted an EFT-1 Loss of Vehicle (LOV) risk of 1-in-160,000 due to in-mission Avcoat cracking based on the results of this analysis. Conservatisms in the result, along with future considerations for Exploration Missions (EM) are also addressed.

Avcoat↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Kentucky Disasters: Multi-Hazard Approach to Mapping Flood Susceptibility and Vulnerability in Kentucky

Flooding is the most common and costly natural disaster in Kentucky, with major flood events in 2022 and 2023 highlighting the need for flood risk assessment. In partnership with the National Weather Service Jackson and Paducah Forecast Offices and the Kentucky Climate Center, we mapped flood risk in Kentucky using a multi-hazard approach that considered two dimensions of risk: flood susceptibility based on a weighted combination of seven physical factors and flood vulnerability based on 13 socioeconomic and infrastructure factors. We additionally analyzed NASA Soil Moisture Active Passive (SMAP) observations of surface soil moisture to explore the utility of SMAP observations for future analysis of flood risk. By analyzing flood susceptibility, we found that with equal rainfall, western Kentucky generally displays a higher propensity to flood than eastern Kentucky. In contrast, our flood vulnerability analysis indicated that more vulnerable areas were generally concentrated in the eastern part of the state. Through a combined perspective, our flood risk analysis identified much of the state as having moderate degrees of flood susceptibility and vulnerability. Our parallel analysis of antecedent soil moisture found that SMAP soil moisture levels were variable in the months leading up to each flood event but were drier than normal in the month prior to the 2023 event, as shown by negative soil moisture anomalies. These results were limited by challenges with weighting input parameters and a lack of validation but overall demonstrate the feasibility of using GIS and Earth observations for mapping flood risk and soil moisture.

analytic hierarchy process↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Multiple aspects maintenance ontology-based intelligent maintenance optimization framework for safety-critical systems

Abstract Maintenance optimization is a process for improving the efficiency of maintenance strategies and activities, considering various aspects of the target system and components, such as the probabilities of system failures and the cost of repair and replacement of a failed component. The improvement of maintenance optimization algorithms generally requires information from various data sources. For example, it may require the system risk information derived from risk analysis tools or the residual lifetime of a component from fault prognosis tools. The requirements of data acquisition (DAQ) and aggregation pose new challenges for maintenance management systems (MMSs) that implement and use these maintenance optimization algorithms. This paper proposes a multiple aspects maintenance ontology-based framework to facilitate DAQ from MMSs, online monitoring systems, fault detection and discrimination tools, risk assessment tools, decision-making tools, and component identification tools, and accelerate the implementation and verification of contemporary maintenance optimization models and algorithms. The proposed framework consists of a multi-aspect maintenance ontology with critical information for maintenance optimization and application interfaces for collecting information from various data sources, such as fault prognosis tools, online monitoring tools, risk assessment tools, and decision-making algorithms. In addition, this paper proposes a heuristic method for integrating concepts and properties from other existing ontologies into the proposed framework when the existing ontology is not fully compatible with the ontology under construction. Finally, the paper verifies the proposed ontology framework using a feedwater system designed for nuclear power plants with valves and filters as the components under maintenance.

Diao, Xiaoxu (ORCID:0000000346726352)↗

Health Analysis and Research for Public Events (HARPE) Tool (Final CRADA Report)

Based on its experience in building assessment tools, Argonne National Laboratory (Argonne) has demonstrated expertise in developing comparative methodologies and question sets that provide both a physical and cyber-based risk assessment for the commercial facilities sector. A high-level risk assessment tool can be beneficial for venues and organizations that fall under a wide array of facility characterizations, ultimately accommodating the evolving landscape of threats specific to these facilities. The Health Analysis and Research for Public Events (HARPE) Tool is an assessment that seeks to help facility managers assess and mitigate aspects of safety, security, and emergency management within their venues. With the pandemic featuring prominently in today’s landscape, we have adapted and extended the scope of the HARPE tool so that it offers users the ability to integrate assessments of their preparation for, response to, and recovery from threats faced at the venue arising from the COVID-19 pandemic. Traditional threats and hazards remain prevalent in today’s landscape, and the best defense is a proactive approach to preventing and mitigating these threats. At the very core of prevention and mitigation is the first step of conducting a risk assessment—this is the gap that HARPE fills. While it is obvious that the response to COVID-19 is health and sanitation driven, leaders within the commercial facilities sector must also know where to best extend their efforts in mitigating future threats arising from the pandemic. Public events and mass gatherings are directly impacted by COVID-19; however, with the help of HARPE, leaders can focus their attention on core impact areas related to the safety and security of returning to a new normal, as they assess their risks using the Argonne-developed tool. HARPE provides an important solution to the COVID-19 situation by assisting venue managers and health officials in identifying their risks.

59 BASIC BIOLOGICAL SCIENCES↗

Default Radioactive and Hazardous Waste Management (RHWM) Dose Conversion Factors (DCFs) and Weighting Factors and plutonium-239 equivalent Curie (PE-Ci) methodology for acceptance into the Waste Storage Facilities

DOE-STD-5506-2007 (Ref. 1) is the standard that provides the methodology for preparing hazard analysis and accident analysis for transuranic (TRU) waste facilities. The Waste Storage Facilities hazard and accident analysis for the DSA is developed in accordance with DOE-STD- 5506-2007. Two related issues need to be addressed when implementing DOE-STD-5506-2007 regarding the calculation of consequences from TRU waste releases in accident analysis: Consequences determined in accident analysis must be modeled using inhalation Dose Conversion Factors (DCFs) that are consistent with those from the International Commission on Radiological Protection Publication 72 (ICRP-72, Ref. 2).; The use of a statistical Material at Risk (MAR) representing the distribution of radiological loading of TRU waste containers based on the use of a plutonium-239 equivalent Curie (PE-Ci) methodology. The PE-Ci methodology simplifies accident analysis by allowing one to model releases based on the Curie value of one standard nuclide (e.g., Pu-239) instead of needing to model releases for every potential nuclide of interest. This is accomplished by normalizing the Curie value of all nuclides to a single Curie value of a standard nuclide by using a Weighting Factor that is a ratio of the DCFs associated with the nuclides and that of the standard nuclide. By using the ICRP-72 DCFs to calculate PE-Ci values used in the statistical MAR, the accident analysis that uses that statistical MAR will be consistent with the consequence methodology identified in DOE-STD- 5506-2007.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TPS Certification by Analysis: Model-Driven Characterization of Properties and Failure in Woven Thermal Protection Systems

Woven, ablative thermal protection system (TPS) materials provide a robust option for aggressive (re)entries and thus have been baselined for the upcoming Mars Sample Return (MSR) mission's Earth Entry System (EES). The reliability requirements for MSR-EES necessitate understanding of material property variability, which could be significant given the complex structure and anisotropic nature of properties in TPS weaves, as well as the response to potential impact with micrometeoroids or orbital debris during the EES re-entry. The TPS Certification by Analysis effort within the Entry Systems Modeling project seeks to provide computational models and analyses that support the certification against such material-based risks. For the present talk, focus will be given to the characterization of baseline woven TPS material properties and mechanical failure limits, which entails (1) use of computational techniques (e.g., machine learning) to interpret computed tomography images of the weave to generate representative structural models and (2) application of multiscale material modeling approaches to characterize thermomechanical and failure properties.

thermal protection systems↗

Mars Exploration Rovers Landing Dispersion Analysis

Landing dispersion estimates for the Mars Exploration Rover missions were key elements in the site targeting process and in the evaluation of landing risk. This paper addresses the process and results of the landing dispersion analyses performed for both Spirit and Opportunity. The several contributors to landing dispersions (navigation and atmospheric uncertainties, spacecraft modeling, winds, and margins) are discussed, as are the analysis tools used. JPL's MarsLS program, a MATLAB-based landing dispersion visualization and statistical analysis tool, was used to calculate the probability of landing within hazardous areas. By convolving this with the probability of landing within flight system limits (in-spec landing) for each hazard area, a single overall measure of landing risk was calculated for each landing ellipse. In-spec probability contours were also generated, allowing a more synoptic view of site risks, illustrating the sensitivity to changes in landing location, and quantifying the possible consequences of anomalies such as incomplete maneuvers. Data and products required to support these analyses are described, including the landing footprints calculated by NASA Langley's POST program and JPL's AEPL program, cartographically registered base maps and hazard maps, and flight system estimates of in-spec landing probabilities for each hazard terrain type. Various factors encountered during operations, including evolving navigation estimates and changing atmospheric models, are discussed and final landing points are compared with approach estimates.

Knocke, Philip C.↗

Mars Exploration Rovers landing dispersion analysis

Landing dispersion estimates for the Mars Exploration Rover missions were key elements in the site targeting process and in the evaluation of landing risk. This paper addresses the process and results of the landing dispersion analyses performed for both Spirit and Opportunity. The several contributors to landing dispersions (navigation and atmospheric uncertainties, spacecraft modeling, winds, and margins) are discussed, as are the analysis tools used. The JPL MarsLS program, a MATLAB-based landing dispersion visualization and statistical analysis tool, was used to calculate the probability of landing within hazardous areas. By convolving this with the probability of landing within flight system limits (in-spec landing) for each hazard area, a single overall measure of landing risk was calculated for each landing ellipse. In-spec probability contours were also generated, allowing a more synoptic view of site risks, illustrating the sensitivity to changes in landing location, and quantifying the possible consequences of anomalies such as incomplete maneuvers. Data and products required to support these analyses are described, including the landing footprints calculated by NASA Langley's POST program and the JPL AEPL program, cartographically registered base maps and hazard maps, and flight system estimates of in-spec landing probabilities for each hazard terrain type. Various factors encountered during operations, including evolving navigation estimates and changing atmospheric models, are discussed and final landing points are compared with approach estimates.

Desai, Prasun N.↗