Search NASA⌕ Search

SEARCH · Search NASA

Results for “astromaterial”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

261 records · Page 15

Mars Sample Receiving Facility Research and Development to Enable Preservation, Safe Containment, and Scientific Research of Martian Samples on Earth

NASA and ESA are working together to plan a joint campaign to potentially bring back the first Martian samples to Earth in the early 2030s. On the surface of Mars, the Mars 2020Perseverance Rover is selecting and packaging samples that could be returned to Earth for careful examination by an international team of scientists. In preparation for this historic sample return, advance planning is underway to design and build a Mars Sample Receiving Facility (SRF) in the mid-2020s. In 2022, a Mars Sample Receiving Facility Assessment Study(MSAS) will be conducted to further define construction modality and capability options for a facility in the conterminous United States. Since Mars Sample Return (MSR) is currently categorized as a planetary protection restricted Earth return, this new facility would feature biosafety level 4 (BSL-4)-like high containment to protect Earth’s biosphere from any potential hazard. In addition, the facility also requires integration of cleanroom technologies to mitigate against terrestrial contamination and preserve sample integrity for science investigations. The integration of both clean handling and high containment requires significant technology research and development (R&D) by the mid-2020s to support the definition and planning of a SRF before commencing the site specific design phase. The SRF project will need to solidify the inorganic, organic, and biological contamination control (CC) requirements for the facility. This could entail a translation of Mars 2020 mission CC requirements for geologic material to engineering requirements for surfaces and airborne molecular contamination inside isolators and cleanrooms. In tandem, the project will need to determine precision cleaning and sterilization approaches for cleanrooms, isolators, equipment, and tools. Initial material selections for the facility construction materials, cleanrooms, isolators, and BSL-4 suits/garments are an important activity. The recent construction of the OSIRIS-REx and Hayabusa2 curation cleanroom laboratories greatly benefited from early materials testing, before the design phase, to reduced organic outgassing and particulate shedding inside the laboratory. While the early biohazard investigations in the SRF may deem the samples safe to release to laboratories throughout the world, sterilization methods need to be defined to safely release Martian samples. One key aspect of enabling simultaneous sample containment and cleanliness is the concept of a Double-Walled Isolator (DWI) that ESA has been pursuing. Further R&D is needed about DWIs, sample handling, and instrumentation interfaces before beginning the SRF site specific design phase. A working isolator/DWI engineering model should be developed and fabricated. Isolator sizes, connections, pass-through antechambers, and configurations and basic interfaces with instruments and tools as well as the use of robotic, mechanical, and/or human manipulation need to be considered. Inert high purity gas supply (one-pass or recirculation) and other isolator utilities must be determined. Special accommodations for large instruments (e.g., XCT,SEM, etc.) need to be developed. Techniques for opening the sample tubes packaged by M2020and extracting the headspace gas while keeping samples pristine will be challenging, requiring additional R&D, and engagement of the M2020 project. In addition, careful micromanipulation for subdivision and packaging of samples will also need to be included. These combined R&D activities are important before commencing the SRF design phase to ensure safe biohazard containment, sample preservation, and science integrity for the samples that would be studied in the SRF and in laboratories around the world.

mars sample return↗

Tours of High-containment and Pristine Facilities in Support of Mars Sample Return (MSR) Sample Receiving Facility (SRF) Definition Studies

During 2019 and 2020, the NASA Tiger Team RAMA (acronym of the authors) toured several high-containment biosafety laboratories and pristine space-mission facilities worldwide to better understand their practices, capabilities, and lessons-learned to aid in planning a Sample Receiving Facility (SRF) in support of Mars Sample Return (MSR). The team also included tours of a manufacturer of mobile and modular high-containment facilities as well as manufacturers of isolators and gloveboxes. In addition, the team visited the European Space Agency (ESA)ultraclean and sterile ISO 3 / airborne molecular contamination -9 (AMC-9) isolator line to clean and assemble the most critical hardware for ESA’s ExoMars Mars Lander System, and researchers developing a novel double-walled isolator (DWI) and robotic handling techniques in support of an MSR SRF. The RAMA team visits covered several construction modalities for an MSR SRF: (1) a new traditional fixed facility; (2) use of an existing fixed Biosafety Level 4(BSL-4) facility; (3) a novel modular BSL-4 approach; and (4) a hybrid combination of fixed, modular, and existing facilities. A new fixed facility approach can be tailored to MSR’s needs and is the approach used by all U.S. BSL-4 laboratories constructed to date. However, this approach could be the most expensive modality, take the longest to implement (8-12 years), and have significant programmatic risk of delay. The utilization of an existing BSL-4 facility may be possible depending on the final contamination control and science requirements for the MSR SRF. Due to the internal dimensions of the labs visited and facility structural requirements, it is unlikely that any modification can be made to the facility to meet cleanliness requirements. Furthermore, due to possible construction delays, possible capacity issues, and potential cross contamination vectors from in-house select agents, there may also be significant programmatic risks for sharing an existing facility. Another approach is building a contemporary modular facility. This is a novel approach that has recently been used for a BSL-3/3Ag facilities. The modular elements would be installed in a traditional building or shell structure. A modular facility has many advantages over a traditional fixed facility with lower costs, shorter design/construction/ commissioning schedule, and flexibility for easier retrofits and future expansion. Lastly, a hybrid approach of combining the use of either: (1) a modular facility inside a new fixed facility or (2) a modular and/or fixed BSL-4 annex in conjunction with an existing BSL-4 space should be considered. The advantage of a hybrid approach is that the facility could leverage the strengths of other approaches. Beyond facility construction approaches, the RAMA team investigated technologies and techniques for isolating and handling Martian samples in pristine environments. For example, ESA has been studying and developing a DWI breadboard along with other sample-handling technologies. The research and development investment for clean, remote manipulation and robotics at the start of the facility design phase would be beneficial to the SRF. Additionally, under-standing the lessons learned from Thales Alenia Space during the construction and operation of the most advanced state-of-the-art precision cleaning, sterilization, and assembly glovebox isolators ever developed for spacecraft hardware are also critical for the SRF. The RAMA team lays out a summary of the 18 facilities toured, and includes 43 observations,18 findings, and 22 areas of possible follow-up that the RAMA team and others could pursue to enable further findings. The observations and findings illustrate that constructing an MSR SRF would combine the complexity of both high-containment and pristine facilities, and merging these technologies would be challenging, but achievable.

Mars Sample Return↗

Analytical Needs in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity forinvestigation with the full range of the latest technology available, but to take full advantageof this opportunity, it is important to plan ahead to ensure the pristine nature of the samplesupon arrival within the Earth environment until scientific investigations can begin.The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2)delivered recommendations and guidance regarding curation (1) and science (2, 3) activities tobe performed on the samples under containment. High-level requirements for the infrastruc-ture were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input forthe ESA and NASA facility studies planned in the 2022-2023 timeframe, the agency-led MSROperational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sampleoperations that will inform future architecture teams. Emphasis was placed on the respon-sibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community.All necessary and sufficient instruments and analytical needs described in MSPG2 were inte-grated in MOSDT main deliverable, the operational workflow (see Hays et al, this conference).In MSPG2, notional instruments were split between curation analytical needs, and objective-driven (time-sensitive and sterilization-sensitive) science analytical needs. In MOSDT, whilethe first phases of curation, “pre-Basic Characterization” and “Basic Characterization” wererather streamlined and separate from other analytical needs, “Preliminary Examination” and“Science” instruments were not always physically segregated. In addition to the necessary andsufficient instruments described by MSPG2, the MOSDT recommended additional supportequipment for sterilization, cleanliness and contamination monitoring.It was sometimes necessary for the MOSDT to rely on assumptions to integrate instruments inthe activity workflow. In general, the assumptions were very conservative to limit contaminationand cross-contamination risks. It is expected that future work to refine limits of contaminationwill enable optimization of instrumentation.The community was consulted during the course of the MOSDT work. This abstract’s aimis two-fold: on one hand, inform the scientific community and overall MSR stakeholders, tobring their attention on the analytical needs currently considered as necessary and sufficient;on the other hand, to solicit feedback from a larger community audience to optimize and refineanalytical needs during the next phases of MSR ground-segment preparation.Disclaimer: The decision to implement Mars Sample Return will not be finalized until NASA’scompletion of the program’s National Environmental Policy Act (NEPA) process. This docu-ment is being made available for informational purposes only.[1] Tait et al. (2021) Preliminary planning for Mars Sample Return (MSR) curation activities ina Sample Receiving Facility (SRF). Astrobiology in press, doi:10.1089/ast.2021.0105. [2] Toscaet al. (2021) Time-sensitive aspects of Mars Sample Return (MSR) science. Astrobiologyin press, doi:10.1089/ast.2021.0115. [3] Velbel et al. (2021) Planning implications relatedto sterilization-sensitive science investigations associated with Mars Sample Return (MSR).Astrobiology in press, doi:10.1089/ast.2021.0113. [4] Carrier et al. (2021) Science and curationconsiderations for the design of a Mars Sample Return (MSR) Sample Receiving Facility (SRF).Astrobiology in press, doi:10.1089/ast.2021.0110.

Mars Sample Return↗

Operational Workflow in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity for investigation with the full range of the latest technology available. To take full advantage of this opportunity, it is important to plan ahead to ensure the pristine nature of the samples upon arrival within the Earth environment until scientific investigations can begin. The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2) delivered recommendations and guidance regarding curation (1) and science (2,3) activities to be performed on the samples under containment. High-level requirements for the infrastructure were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input for the ESA and NASA facility studies planned in the 2022-2023 timeframe, the MSR agency-led Operational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sample operations that will inform future architecture teams. Emphasis was placed on the responsibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community. The main deliverable of MOSDT was an operational workflow for a Sample Receiving Facility (SRF). Two other deliverables were produced: a report to narrate the workflow, and a list of instruments (see Hutzler et al., this conference). Activities described in the main sequence of the workflow range from engineering operations to curation to science, with the latter term being used here as the science to be done within a SRF. Side sequences (e.g. engineering inspection of hardware, head gas extraction) were also identified, and detailed when they would have a significant impact on the infrastructure of a SRF. It was necessary for the MOSDT to rely on assumptions for some steps and activities, and though these were kept to a minimum (and are described in both the report supporting the workflow and in the full presentation), in general, the assumptions and overall work were very conservative, as the impact of underestimating the scope of the SRF infrastructure was considered more detrimental than overestimating it. It is expected that future work will be able to confirm or inform these assumptions. The community was consulted during the course of the MOSDT work. This abstract’s aim is two-fold: on one hand, inform the scientific community and overall MSR stakeholders, to make the infrastructure studies and trade-off more understandable; on the other hand, to solicit feedback from a larger community audience for the next iterations planning for SRF design and activities.

Mars Sample Return↗

Processing Frozen Apollo Samples in a Nitrogen Environment

A few weeks after their return to Earth, several Apollo 17 regolith sample splits and one Apollo 17 basalt were frozen at -20˚C (under dry gaseous N2 like all other pristine Apollo samples), and have remained essentially unstudied within the Apollo sample collection at NASA’s Johnson Space Center (JSC). As part of the Apollo Next Generation Sample Analysis (ANGSA) project, these frozen samples were selected for consortium study in 2019. Although the samples themselves were kept at -20˚C for nearly 50 years, the JSC Curation office has lacked a facility for processing frozen samples under pristine Apollo processing conditions. A temporary lab for this work was designed, built, and tested. Procedures were then developed for working in this unique environment, and the facility was sucessfully used to process the frozen Apollo samples for scientific allocation.

ANGSA↗

Early Fluid Activity on Ryugu Inferred By Oxygen, Carbon, and 53Mn-53Cr Isotopic Analyses of Carbonates and Magnetite

Samples from asteroid Ryugu returned by the Hayabusa2 mission contain evidence of extensive alteration by aqueous fluids and appear related to the CI chondrites. To understand the sources of the fluid and the timing of chemical reactions occurring during the alteration processes, we investigated the oxygen, carbon, and 53Mn-53Cr systematics of carbonate and magnetite in two Ryugu particles. We find that the fluid was initially between 0−20 °C and enriched in 13C, and 17O and 18O, and subsequently evolved towards lighter carbon and oxygen isotopic compositions as alteration proceeded. Carbonate ages show that this fluid-rock interaction took place within the first ~1.8 million years of solar system history, requiring early accretion either in a planetesimal less than ~20 km in diameter or within a larger body which was disrupted and reassembled.

Astromaterials↗

Early Aqueous Alteration of Ryugu’s Parent Body – Insight from In-situ Isotopic Analyses

The Hayabusa2 mission returned approximately 5.4 g of highly aqueously-altered material resembling the CI (Ivuna-type) chondrites from the C-type asteroid Ryugu. To understand the timing and duration of aqueous alteration on Ryugu’s parent body, we measured the 53Mn-53Cr (t1/2 = 3.7 Myr) ages of dolomite, breunnerite, and Ca-carbonate minerals in Ryugu particles A0037 and C0009 using secondary ion mass spectrometry (SIMS) with the UCLA CAMECA ims-1290 instrument with Hyperion II oxygen plasma source. Using these carbonate formation ages, we estimate the accretion time and size of Ryugu’s parent body to have been within the first 1.8 million years of Solar System history in a planetesimal less than ~20 km in diameter, or within a larger body which was disrupted and reassembled. To further constrain the conditions of aqueous alteration, we measured the δ13C, δ18O, and Δ17O of Ryugu dolomite, Ca-carbonate, and magnetite using the UCLA CAMECA ims-1290. The results of our stable isotopic analyses show that the earliest stages of aqueous alteration occurred at low temperatures (between 0 and 20 °C), that the initial fluid was enriched in the heavy 13C, 17O and 18O isotopes, and that the fluid evolved towards lighter carbon and oxygen isotopic compositions as alteration proceeded.

Astromaterials↗

OSIRIS-REx Curation: The First Year with Bennu Samples on Earth

The OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, and Security – Regolith Explorer) sample return capsule landed on the Utah Test and Training Range (UTTR) on September 24, 2023. Preparations for the curation of the sample from asteroid Bennu inside of this capsule spanned more than a decade. On the morning of landing, the sample return capsule was brought to a temporary cleanroom at UTTR for initial de-integration and connection of the sample canister to a nitrogen gas purge to protect the sample from modification by the terrestrial atmosphere. In the week following landing, the sample canister was flown to Houston while on nitrogen purge, transferred to a nitrogen atmosphere glovebox at NASA Johnson Space Center in which the canister lid was removed revealing small amounts of sample on the inside of the canister lid and avionics deck, some of this sample was allocated rapidly to the mission sample analysis team as “quick look” samples. Next, the Touch-and-Go sample acquisition mechanism (TAGSAM) head was disassembled inside of a specially designed glovebox. A challenge arose during one of the last stages of disassembly when two fasteners resisted being loosened. The curation team was able to remove 70.3 grams of asteroid sample from the TAGSAM head with those fasteners in-place and began initial sample processing which supported long-term curation of hermetically sealed and frozen samples, transfer of some samples to remote storage, and allocation of aggregate samples to the mission sample analysis team. Meanwhile, curation engineers developed a tool to remove the stubborn fasteners without contaminating the remaining sample, enabling the remaining bulk sample to be transferred to long-term storage trays in January 2024. With this second part of the bulk sample, the returned bulk asteroid sample reached 121.6 grams. During disassembly and prior to sealing the bulk sample trays into long-term storage containers, archival photographs were collected. Select particles are gradually being XCT scanned while inside of containers that hold a nitrogen atmosphere. The initial OSIRIS-REx sample catalog was released in spring 2024 with an update in fall 2024. The curation team will be busy working to allocate samples to scientists around the world for the foreseeable future.

Curation↗

The NASA OSIRIS-REx Sample Catalog: Samples Returned from Investigators

OSIRIS-REx is a sample return mission that collected carbon-rich material from B-type asteroid Bennu. After landing on September 24th, 2023, the science canister was transported to NASA Johnson Space Center (JSC) in Houston, Texas where it was opened and samples were processed by the curation team in pristine sample nitrogen gloveboxes. As the sample analysis phase of the OSIRIS-REx mission concludes, the Sample Analysis Team (SAT) has returned the majority of mission samples to NASA JSC curation and will return the remaining samples on a defined timetable. The curation team processed and documented as many of these samples as possible to include in the spring 2026 catalog update and are steadily working to process hundreds of more samples to include in the fall 2026 catalog update.

OSIRIS-REx↗