Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF↗

Evaluating Protection System Performance for a Real-World Weak Grid Area With High Inverter-Based Resources

This paper evaluates an existing protection scheme implemented in a real-world weak grid area with a high penetration of inverter-based resources (IBRs). The study aims to assess the reliability and adequacy of protection schemes originally designed for traditional synchronous machine systems and determine whether they can continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with an IBR original equipment manufacturer black-box model is used to perform fault studies and generate COMTRADE data, which are replayed by a realtime digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBRonly scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. These findings provide utilities with valuable insights for improving their protection systems in high-IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Apollo experience report: The application of a computerized visualization capability to lunar missions

The development of a computerized capability to depict views from the Apollo spacecraft during a lunar mission was undertaken before the Apollo 8 mission. Such views were considered valuable because of the difficulties in visualizing the complex geometry of the Earth, Moon, Sun, and spacecraft. Such visualization capability originally was desired for spacecraft attitude verification and contingency situations. Improvements were added for later Apollo flights, and results were adopted for several real time and preflight applications. Some specific applications have included crewmember and ground control personnel familiarization, nominal and contingency mission planning, definition of secondary attitude checks for all major thrust maneuvers, and preflight star selection for navigation and for platform alinement. The use of this computerized visualization capability should prove valuable for any future space program as an aid to understanding the geometrical relationships between the spacecraft and the celestial surroundings.

Hyle, C. T.↗

A preliminary investigation of the environmental Control and Life Support Subsystems (EC/LSS) for animal and plant experiment payloads

A preliminary study of the environmental control and life support subsystems (EC/LSS) necessary for an earth orbital spacecraft to conduct biological experiments is presented. The primary spacecraft models available for conducting these biological experiments are the space shuttle and modular space station. The experiments would be housed in a separate module that would be contained in either the shuttle payload bay or attached to the modular space station. This module would be manned only for experiment-related tasks, and would contain a separate EC/LSS for the crew and animals. Metabolic data were tabulated on various animals that are considered useful for a typical experiment program. The minimum payload for the 30-day space shuttle module was found to require about the equivalent of a one-man EC/LSS; however, the selected two-man shuttle assemblies will give a growth and contingency factor of about 50 percent. The maximum payloads for the space station mission will require at least a seven-man EC/LSS for the laboratory colony and a nine-man EC/LSS for the centrifuge colony. There is practically no room for growth or contingencies in these areas.

Wells, H. B.↗

Some aversive characteristics of centrifugally generated gravity.

The effective weight of rats was manipulated by centrifugation. Two effective weight levels were obtained. In three escape avoidance conditions a lever press produced a change from a base level of 2.1 g to a response level of 1.1 g. In a punishment condition a response produced a change from a 1.1 g level to a 2.1 g level and in an extinction condition responses had no effect on the 2.1 g effective weight level present. All changes took 30 sec and were maintained for an additional 10 sec before a return to base level was initiated. When responses occurred closer together than the 40 sec, they delayed the return to base level by 40 sec. This 40 sec interval is referred to as response-contingent-time. The response rate and amount of response-contingent-time served as the data. The results confirmed previous data that centrifugation is aversive. The results are interpreted as indicating that the aversiveness is attributable to the increase in effective weight, and that rats can discriminate the different angular velocity-radius of rotation combinations used.

Altman, F.↗

Conditioned suppression, punishment, and aversion

The aversive action of visual stimuli was studied in two groups of pigeons which received response-contingent or noncontingent electric shocks in cages with translucent response keys. Presentation of grain for 3 sec, contingent on key pecking, was the visual stimulus associated with conditioned punishment or suppression. The responses of the pigeons in three different experiments are compared.

Orme-Johnson, D. W.↗

Evaluation criteria for software classification inventories, accuracies, and maps

Statistical criteria are presented for modifying the contingency table used to evaluate tabular classification results obtained from remote sensing and ground truth maps. This classification technique contains information on the spatial complexity of the test site, on the relative location of classification errors, on agreement of the classification maps with ground truth maps, and reduces back to the original information normally found in a contingency table.

Jayroe, R. R., Jr.↗

Space telescope neutral buoyancy simulations: The first two years

Neutral Buoyancy simulations which were conducted to validate the crew systems interface as it relates to space telescope on-orbit maintenance and contingency operations is discussed. The initial concept validation tests using low fidelity mockups is described. The entire spectrum of proposed space telescope refurbishment and selected contingencies using upgraded mockups which reflect flight hardware are reported. Findings which may be applicable to future efforts of a similar nature are presented.

Sanders, F. G.↗

Powerplant design for one-engine-inoperative operation

Regulatory changes are proposed for new engine certification for multi-engine helicopters to account for contingency operations when one engine goes out at take-off. The new rules are needed because current regulations define category A and B conditions as one-engine out, land immediately, or continue take-off, respectively. Category A is seldom feasible while Category B requires oversize engines, implying lowered fuel efficiencies. However, NASA studies have shown that engines with large contingency power can operate more efficiently in normal conditions due to decreased coolant flow. Techniques for realizing up to a 50 percent power augmentation with minor modifications of existing engines are described.

Hirschkron, R.↗

Benchmark data on the separability among crops in the southern San Joaquin Valley of California

Landsat MSS data were input to a discriminant analysis of 21 crops on each of eight dates in 1979 using a total of 4,142 fields in southern Fresno County, California. The 21 crops, which together account for over 70 percent of the agricultural acreage in the southern San Joaquin Valley, were analyzed to quantify the spectral separability, defined as omission error, between all pairs of crops. On each date the fields were segregated into six groups based on the mean value of the MSS7/MSS5 ratio, which is correlated with green biomass. Discriminant analysis was run on each group on each date. The resulting contingency tables offer information that can be profitably used in conjunction with crop calendars to pick the best dates for a classification. The tables show expected percent correct classification and error rates for all the crops. The patterns in the contingency tables show that the percent correct classification for crops generally increases with the amount of greenness in the fields being classified. However, there are exceptions to this general rule, notably grain.

Morse, A.↗

Behavioral and biological interactions with small groups in confined microsocieties

Research on small group performance in confined microsocieties was focused upon the development of principles and procedures relevant to the selection and training of space mission personnel, upon the investigation of behavioral programming, preventive monitoring and corrective procedures to enhance space mission performance effectiveness, and upon the evaluation of behavioral and physiological countermeasures to the potentially disruptive effects of unfamiliar and stressful environments. An experimental microsociety environment was designed and developed for continuous residence of human volunteers over extended time periods. Studies were then undertaken to analyze experimentally: (1) conditions that sustain group cohesion and productivity and that prevent social fragmentation and performance deterioration, (2) motivational effects performance requirements, and (3) behavioral and physiological effects resulting from changes in group size and composition. The results show that both individual and group productivity can be enhanced under such conditions by the direct application of contingency management principles to designated high-value tasks. Similarly, group cohesiveness can be promoted and individual social isolation and/or alienation prevented by the application of contingency management principles to social interaction segments of the program.

Brady, Joseph V.↗

Space Shuttle guidance for multiple main engine failures during first stage

This paper presents contingency abort guidance schemes recently developed for multiple Space Shuttle main engine failures during the first two minutes of flight (first stage). The ascent and entry guidance schemes greatly improve the possibility of the crew and/or the Orbiter surviving a first stage contingency abort. Both guidance schemes were required to meet certain structural and controllability constraints. In addition, the systems were designed with the flexibility to allow for seasonal variations in the atmosphere and wind. The ascent scheme guides the vehicle to a desirable, lofted state at solid rocket booster burnout while reducing the structural loads on the vehicle. After Orbiter separation from the solid rockets and the external tank, the entry scheme guides the Orbiter through one of two possible entries. If the proper altitude/range/velocity conditions have been met, a return-to-launch-site 'Split-S' maneuver may be attempted. Otherwise, a down-range abort to an equilibrium glide and subsequent crew bailout is performed.

Sponaugle, Steven J.↗

Geometric reasoning

Cognitive robot systems are ones in which sensing and representation occur, from which task plans and tactics are determined. Such a robot system accomplishes a task after being told what to do, but determines for itself how to do it. Cognition is required when the work environment is uncontrolled, when contingencies are prevalent, or when task complexity is large; it is useful in any robotic mission. A number of distinguishing features can be associated with cognitive robotics, and one emphasized here is the role of artificial intelligence in knowledge representation and in planning. While space telerobotics may elude some of the problems driving cognitive robotics, it shares many of the same demands, and it can be assumed that capabilities developed for cognitive robotics can be employed advantageously for telerobotics in general. The top level problem is task planning, and it is appropriate to introduce a hierarchical view of control. Presented with certain mission objectives, the system must generate plans (typically) at the strategic, tactical, and reflexive levels. The structure by which knowledge is used to construct and update these plans endows the system with its cognitive attributes, and with the ability to deal with contingencies, changes, unknowns, and so on. Issues of representation and reasoning which are absolutely fundamental to robot manipulation, decisions based upon geometry, are discussed here, not AI task planning per se.

Woodbury, R. F.↗

Deterministic errors in the Magellan orbit due to attitude control thruster activity

The pitch and yaw attitude control thrusters of the Magellan spacecraft generate uncoupled moments about the spacecraft center of mass, perturbing the spacecraft's orbit. A strategy to model these perturbing forces in the spacecraft equations of motion is presented. This strategy can model the thruster forces occurring in the nominal and contingency modes of attitude control operation. In the nominal mode, the thrusters fire only to balance the daily unloading of the momentum wheels. The contingency case will occur if a pitch or yaw axis momentum wheel fails, and the thrusters could fire up to 1200 times around the orbit to replace the failed wheel's momentum contribution. Deterministic errors are computed and shown to be under specified error requirements.

Engelhardt, Douglas B.↗

Impact of tether cutting on onboard navigation during the Tethered Satellite Mission-1

The first Tethered Satellite System mission (TSS-1) is manifested for Shuttle Flight STS-44 in January of 1991. The TSS mission presents a new challenge to engineers, requiring advanced guidance, navigation and control concepts. Current NASA flight rules require that the navigational state of the Orbiter at deorbit burn be known to an accuracy of 20 nautical miles. Response of the Shuttle crew to this contingency may involve cutting the tether prior to a complete retrieval. The degradation of the navigational state accuracy as modelled by Shuttle navigation system is examined. Responses to the loss of communication scenario are proposed for two cases. The first case examines navigational performance during a nominal attitude profile. The second case is identical to the first, with the inclusion of modelled tether electrodynamical forces. Comparisons of trajectories propagated from the onboard navigational state vector and a reference ephemeris state vector were performed, with the tether cut simulated at various points during the mission. Additionally, updates to the onboard navigational state via ground uplinks were provided prior to the assumed loss of communication. Through these comparisons, the onboard navigation state error was determined. Alternative responses result from efforts to minimize this error during the various phases of TSS-1 deployment. These results demonstrated existing NASA flight rules could be violated by cutting the tether, and suggests reponses to a loss of communications contingency to maintain a more accurate navigational state.

Pirker, Dana M.↗

The design and fabrication of the Centaur neutral buoyancy trainer and related hardware

Two full scale mockups of the Centaur upper stage were designed, fabricated and delivered to NASA. One was the Centaur Weightless Environment Training Facility (WETF) trainer and the other was the Centaur 1-G mockup. The Centaur upper stage booster is designed to carry the spacecraft Galileo to Jupiter, and the spacecraft Ulysses to an orbit around the Sun after launch from the Space Shuttle. The flight vehicle has several Extravehicular Activity (EVA) contingency tasks that require crew training. This need for crew training generated the requirement for the Centaur WETF crew trainer, which is high fidelity in areas of expected crew interface. During the production of the Centaur WETF crew trainer, the need for a jumper cable from Centaur to the Orbiter was identified. This EVA contingency task would be the installation of a cable from the Orbiter cargo bay sill to various command data boxes on Centaur to allow crew control deployment should a failure occur. This task required the upgrading of volumetric boxes on the trainer to a high fidelity configuration including electrical connector installation and cable routing.

Ware, Alan S.↗

Engineering Test Satellite VI (ETS-VI)

The Engineering Test Satellite-VI (ETS-VI) is being developed as the third Japanese three-axis stabilized engineering test satellite to establish the 2-ton geostationary operational satellite bus system and to demonstrate the high performance satellite communication technology for future operational satellites. The satellite is expected to be stationed at 154 deg east latitude. It will be launched from the Tanegashima Space Center in Japan by a type H-II launch vehicle. The Deep Space Network (DSN) will support the prelaunch compatibility test, data interface verification testing, and launch rehersals. The DSN primary support period is from launch through the final AEF plus 1 hour. Contingency support is from final AEF plus 1 hour until launch plus 1 month. The coverage will consist of all the 26-m antennas as prime and the 34-m antennas at Madrid and Canberra as backup. Maximum support will consist of two 8-hour tracks per station for a 7-day period, plus the contingency support, if required. Information is given in tabular form for DSN support, telemetry, command, and tracking support responsibility.

Horii, M.↗

Geostationary Operational Environmental Satellite (GOES I-M) METSAT project

The primary objective of the METSAT project is to provide a satellite system that meets the National Environmental Satellite Data and Information Service (NESDIS) requirements as specified by NOAA. For the GOES I-M spacecraft, these requirements include an imager and sounder system, a data collection system, and a search and rescue system. The Space Transportation System and GOES I-M development philosophy and the satellite transfer orbit philosophy are explained. The spacecraft will be launched from the Kennedy Space Center using Atlas G/Centaur D-1A expendable launch vehicles. The coverage required for launch and the support of transfer and drift orbits will consist of the 26-m antenna as prime and the TBD antenna as backup for 11 days at all complexes. There will be contingency support 15 days for on-station spacecraft checkout. After the initial 30 to 45 days, the Deep Space Network (DSN) is committed for emergency support. Contingency and emergency support will be provided by Goldstone only. Information is given in tabular form for DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Blaney, K.↗