Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

An OVERVIEW of MICROPHONICS in CEBAF and CURRENT MODERATION TECHNIQUES

Superconducting RF (SRF) structures are susceptible to frequency detuning from external vibrations and modal mechanical resonances in the structure. These small disturbances, known as microphonics, require additional RF power in CW accelerating structures since the frequency is constantly shifting. In the Jefferson Lab CEBAF accelerator, time and frequency data of this frequency shift have been recorded for many years, allowing a retrospective analysis of different microphonics-mitigation techniques. Some of these techniques are specific to the design of each CEBAF cryomodule, for example implementing BNNT damping material on the cavity string. Other techniques are universal such as affixing vacuum lines and reinforcing waveguide structures.

Powers, Tom↗

Distributed Magnetic Field and Temperature Monitoring for Superconducting Radio Frequency Cavities

The overall objective of the proposed Phase I program was to design, construct and demonstrate a fiber optic sensing system capable of providing temperature and magnetic field measurements with an enhanced spatial resolution that can be implemented over a large surface area (cryomodules) to survey superconducting radio frequency cavities and magnets. A magnetic field sensor capable of detecting fluxes on the order of 1 μT is required to detect the distribution of trapped flux on the cavity surface. A unique distributed magnetic field sensor was successfully designed and constructed to demonstrate the detection of magnetic fluxes less than 500 nT. The sensor leveraged the ultra-high sensitivity of Sentek’s picoDAS to measure the magnetostriction induced vibrations in a commercially available Metglas 2605 SC ribbon that was in physical contact with sensing fiber. Static magnetic fields were detected by applying an alternating current a copper wire proximate to the Metglas 2605SC ribbon to create an AC bias magnetic field. In an alternative approach, an AC bias magnetic field was applied to a special magnetic field sensing fiber with Metglas 2605SC cladding successfully detect a magnetic field flux of a 3 μT. Exhaustive testing was performed to characterize the dependency of sensor response on the direction of the applied magnetic field. Although the special sensing fiber based magnetic field sensor did not exhibit an observable dependence on the direction of the magnetic field, the Metglas 2605SC ribbon sensor exhibited a clear directional dependence. A wide variety of polymer materials were evaluated to enhance the temperature response of an FBG based sensor at cryogenic temperatures. The processing and performance challenges provided the motivation to develop a new simple cryogenic temperature sensor that uses a commercially available fiber optic splice protector. The EVA hot melt tube that becomes adhered to the optical fiber and the polyolefin outer tube that shrinks upon heating in the fusion splicer heater provide the high thermal expansion coefficient necessary to impart a significant strain on the FBG when exposed to cryogenic temperatures. The temperature sensitivity (Δ𝜆𝐵𝑟𝑎𝑔𝑔~ 62 𝑝𝑝𝑚/℃) of the FBG-based sensor was on par with the best reported to date. The simple design, use of readily available cost-effective materials, and well-established processing techniques lends this approach to the creation of hundreds to thousands of temperature sensors on one single optical fiber length. The inherently small form factor also allows for co-location with the distributed magnetic field sensor. In preparation for field testing of the prototype sensing system at the Jefferson Labs in potential Phase II program, several different cable designs were evaluated to package the sensors. The preliminary successful demonstration of fully functional sensing cables provides the foundation for subsequent development efforts to advance the Technology Readiness Level of the technology. The technical feasibility of the proposed approach was successfully demonstrated in this Phase I effort.

43 PARTICLE ACCELERATORS↗

Progress in $Nb_3Sn$ SRF Technology: Opportunities and Outlook

Nb3Sn superconducting radiofrequency (SRF) cavities can expand performance capabilities of particle accelerators for both the fundamental research and the industrial applications. The technology holds a great appeal especially to small-scale applications, where it can enable a turn-key compact cryocooler operation eliminating the need for complex sub-atmospheric liquid helium cryogenic plants. Since the research into Nb3Sn SRF coatings using vapor diffusion technique restarted in 2009 at Cornell University, there has been a growing number of SRF groups around the world developing this technology with a steady increase in cavity performance and system complexity. In this talk, after a short overview of SRF technology, I will present on some of the recent developments in Nb3Sn SRF cavities, focusing on recent efforts to complete the first-of-its-kind Nb3Sn 2-cavity CEBAF-type cryomodule, which was assembled and tested last year. The talk will conclude with a short overview on some of the ongoing projects and the future possibilities for Nb3Sn cavities in accelerator applications.

43 PARTICLE ACCELERATORS↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The New Muon Laboratory (NML) cools two individually cryostated superconducting radio frequency (SRF) capture cavities (CC) and one prototype ILC cryomodule (CM) with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. Since 2019, this R&D accelerator complex has gone through four science runs.

Wallace, T. [Fermilab]↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

43 PARTICLE ACCELERATORS↗

Design of a Non-Invasive Laser-based Beam Profile Monitor System for the New Fermilab PIP-II Superconducting H- Linac

As part of the new Proton Improvement Plan (PIP-II), Fermilab is undertaking the development of a new 800 MeV, 2 mA H- superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a series of superconducting RF cryomodules from 2.1 MeV to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize non-invasive laser-based monitors (laserwires) to obtain beam profiles via photoionization. This paper will present the design of this PIP-II laserwire system including the picosecond pulsed laser, optical transport line, 13 individual laserwire stations, laser feedback and timing controls.

Scarpine, V. [Fermilab]↗

Development of an FGPA-Based Cavity Simulator for Testing RF Controls

LLRF is used to precisely control the amplitude and phase of the RF field in cavities. Often times, access to test the control algorithms with RF equipment, especially in the presence of beam, is limited or beyond reach. In such cases, testing must be done through computer modeling or simulations. Computer modeling is often too slow and difficult to interface with the LLRF hardware. Analog or digital cavity simulators are preferred as they allow for interaction with the LLRF controls platform in real-time, and compared to their analog counterparts, FPGA-based digital cavity simulators allow for a more adjustable and sophisticated implementation. The newly developed FPGA-based cavity simulator includes the cavity electrical model, the cavity mechanical model including Lorentz Force Detuning and microphonics, an amplifier model which can simulate real amplifier nonlinearities, and a beam model. The simulator has been validated using measurements from BNL’s CeC 704 MHz 5-cell SRF cryomodule.

43 PARTICLE ACCELERATORS↗

Warm Front End Upgrade for the PIP-II Linac

The warm front end for the PIP-II Linac consists of an Ion-source, an RFQ, and four buncher cavities. The LLRF systems for these were the first ones developed more than a decade ago for use at the test stands. Some were VXI crate based, and others used early generation FPGA boards that are light in resources. These LLRF systems and the one for the first superconducting cryomodule, the HWR will be upgraded with the ARRIA 10 SOC-FPGA chassis with EPICS interfaces like the rest of the PIP-II Linac. The RFQ and the HWR have unique resonance control systems which are integrated into the LLRF controller hardware. The results of the initial testing with a cavity emulator will be presented.

Reyes, Lennon [Fermilab] (ORCID:0009000891155652)↗

Robotic Systems integration for cleanroom SRF assembly at Fermilab

Superconducting Radio Frequency (SRF) cryomodule assembly is a critical process that demands the highest levels of contamination control in a cleanroom to ensure product quality and reliability. Within the cleanroom environment, human-driven activities remain the major source of uncontrolled particulate. Moreover, the precise manual alignment of components often exceeds expected timeframes, increasing the risk of particulate migration into the critical inner space of the SRF resonant cavity, and causing extended discomfort for workers. Automation comes as a natural solution to address these challenges. The goal of this activity is to set up and integrate a robotic system to support cavity coupler installation in the cleanroom environment. Initially, remote control of a 6-axis collaborative robot arm will be implemented as an introductory step towards automation in the cleanroom. Subsequently, the system will be further enhanced by integrating manipulation capabilities through an appropriate end-effector, and computer vision technology to enable accurate pose estimation. This comprehensive approach aims to achieve a fully automated and adaptable assembly process in the partially structured cleanroom environment, thereby enhancing efficiency and mitigating existing challenges for better product quality and workers safety.

42 ENGINEERING↗

Preparation and Qualification of Preproduction SSR2 Jacketed Cavities for PIP-II

The qualification of 325 MHz Single Spoke Resonators type 2 (SSR2) jacketed cavities to meet technical requirements represents a significant milestone in the development of the SSR2 cryomodules for the PIP-II Project at Fermilab. This poster reports the procedures and lessons learned in processing and preparing these cavities for horizontal cold testing prior to integration into a cavity string assembly, with a focus on addressing the field emission issues observed during the cold testing. A comprehensive root cause analysis identified critical fabrication, processing, and handling factors impacting field emission onset. New techniques were successfully developed and implemented to achieve field emission-free SSR2 cavities, and efforts were made to correlate radiation levels measured at the test stand with expected levels in the LINAC tunnel. Additionally, the evolution of field emission through assembly steps was thoroughly investigated, leading to a reassessment of design choices and enhancing our understanding of their effects on cavity performance.

Grassellino, L. [Fermilab]↗

Deep Learning Based Superconducting Radio-Frequency Cavity Fault Classification at Jefferson Laboratory

This work investigates the efficacy of deep learning (DL) for classifying C100 superconducting radio-frequency (SRF) cavity faults in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. CEBAF is a large, high-power continuous wave recirculating linac that utilizes 418 SRF cavities to accelerate electrons up to 12 GeV. Recent upgrades to CEBAF include installation of 11 new cryomodules (88 cavities) equipped with a low-level RF system that records RF time-series data from each cavity at the onset of an RF failure. Typically, subject matter experts (SME) analyze this data to determine the fault type and identify the cavity of origin. This information is subsequently utilized to identify failure trends and to implement corrective measures on the offending cavity. Manual inspection of large-scale, time-series data, generated by frequent system failures is tedious and time consuming, and thereby motivates the use of machine learning (ML) to automate the task. This study extends work on a previously developed system based on traditional ML methods (Tennant and Carpenter and Powers and Shabalina Solopova and Vidyaratne and Iftekharuddin, Phys. Rev. Accel. Beams, 2020, 23, 114601), and investigates the effectiveness of deep learning approaches. The transition to a DL model is driven by the goal of developing a system with sufficiently fast inference that it could be used to predict a fault event and take actionable information before the onset (on the order of a few hundred milliseconds). Because features are learned, rather than explicitly computed, DL offers a potential advantage over traditional ML. Specifically, two seminal DL architecture types are explored: deep recurrent neural networks (RNN) and deep convolutional neural networks (CNN). We provide a detailed analysis on the performance of individual models using an RF waveform dataset built from past operational runs of CEBAF. In particular, the performance of RNN models incorporating long short-term memory (LSTM) are analyzed along with the CNN performance. Furthermore, comparing these DL models with a state-of-the-art fault ML model shows that DL architectures obtain similar performance for cavity identification, do not perform quite as well for fault classification, but provide an advantage in inference speed.

97 MATHEMATICS AND COMPUTING↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Combining Particle Tracking with Electromagnetic Radiation Showers: Merging GPT and Geant4 with Visualization

Field emitted electrons can seriously affect the operation of high-field, high-duty factor electron accelerators. Accelerated field emission can result in high average power beams which can radiation damage beamline components. In addition, localized losses generate thermal hot spots whose outgassing degrades the ultra-high vacuum required in photoinjectors and cryomodules. However, despite their importance, the effects of field emission are rarely included in the design and engineering of electron injectors. This work attempts to remedy this situation by combining two well-known and well-documented programs, GPT and Geant4, to track electrons and their losses in an injector beamline. This paper describes a system of programs which simulates electron paths and losses along the beamline. In addition, the tracking results can be zoomed and panned along and about the beampipe envelope using an open-source 3D CAD program. The scattering albedo calculations of the combined program, GPT-Geant4, are shown to be in good agreement with the literature albedos. The paper concludes with a dark current simulation for the LCLS-II injector from the cathode to the collimator at 1.5 m from the cathode.

Dowell, David H.↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The NML cryogenic plant cools two individually cryostated superconducting radio frequency (SRF) capture cavities and one prototype ILC cryomodule with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. The cryogenic plant is composed of two nitrogen precooled Tevatron satellite refrigerators, two Mycom 2016C compressors, a cryogenic distribution system, a Frick purifier compressor, two charcoal bed adsorber purifiers, and a liquid ring vacuum pump with a roots booster. The SRF cavities are immersed in a 2.0 K liquid helium bath, shielded with a 5 K gaseous helium shield and a liquid nitrogen cooled thermal shield. Since 2019, this R&D accelerator complex has gone through four science runs with an average duration of 12 months. Operational experience for each run, availability metrics, performance data and common outages are presented in this paper.

Wallace, Timothy [Fermilab] (ORCID:000900051589302↗

Growth and Properties of Vapor Diffused Nb3Sn Coating for Superconducting Radiofrequency Accelerator Cavity Applications

The desire to reduce construction and operating costs of future SRF accelerators motivates the search for higher-performing alternative materials. Nb3Sn (Tc ~ 18.3 K and Hsh ~ 425 mT) is the front runner. The tin vapor diffusion process is currently the technique of choice to produce promising Nb3Sn-coated cavities. Understanding Nb3Sn nucleation and growth in this process is essential to progress. Samples representing different stages of Nb3Sn formation have been produced and studied to elucidate the effects of nucleation, growth, process conditions, and impurities. Nb3Sn films with thickness from a few hundred nm up to ~15 µm were grown and characterized. The microscopic examination of samples suggests the mechanisms of thin film nucleation and growth. Broadly, nucleation deposits tin as a thin surface phase and, under some conditions, a few hundred nanometer sized particles as well. Conditions that impair nucleation promote the formation of defects, such as ?patches?, in subsequent coating growth. Analysis of coated samples is consistent with the model of Nb3Sn grown in which tin diffuses via grain boundaries to Nb3Sn-Nb interface, where the growth Nb3Sn into the niobium bulk takes place. Similar scaling laws are found for grain growth and layer thickness. Non-parabolic layer growth is consistent with significant grain growth, which reduces the number of Sn-transport channels. Examination of patchy region in Nb3Sn coating revealed it to be large single crystalline grains, pointing to impeded Nb3Sn layer growth due to low grain boundary density, resulting in a significantly thin coating in those areas. Examination of RF loss regions from a coated cavity, identified with a thermometry mapping system showed patchy regions and carbonus defects were associated with strong local field-dependent surface resistance. RF measurements of coated cavities were combined with material characterization of witness samples and coated-cavity cutouts to improve the coating process. Understanding obtained and applied to cavity coatings, resulted in single-cell Nb3Sn cavities with a quality factor of ~2 ×1010 up to 15 MV/m accelerating gradient at 4 K, without "Wuppertal" Q-slope. We have also produced Nb3Sn-coated CEBAF 5-cell cavities with accelerating gradients useful for accelerator cryomodules. This dissertation will discuss the genesis of the Nb3Sn coating in a typical tin vapor diffusion process, effects of different process parameters, and its consequences to the coating of single-cell and multi-cell SRF cavities.

Pudasaini, Uttar↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗