Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight delay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Physiological Anatomical Rodent Experiment (PARE): 04 Flight Support

Rats were shipped to Kennedy Space Center (KSC), Florida, on day 2 of gestation [(G2) (day 1 = morning on which spermatozoa are present in the vagina)] and laparotomized on G7 to determine the number of implantation sites in each uterine horn. On G8, ten pregnant rats meeting flight criteria (at least five implantation sites each horn) were placed into NASA flight cages (animal enclosure modules, AEMS, five rats per cage), loaded onto the mid-deck of the space shuttle Atlantis, and on G9 (November 3, 1994) they were launched into orbit. On gestation day 20, (November 14, 1994) the shuttle returned to Edwards Air Force Base, California and the flight animals were recovered from the shuttle and subjected to unilateral hysterectomy to provide fetal material from one horn to investigators identified by NASA to study selected fetal parameters. After unilateral hysterectomy, the animals were allowed to recover and deliver vaginally. There were three groups (n = 10 each group) of control animals housed at KSC in the study. A synchronous control group, delayed 24 hours with reference to the flight group, received the same surgeries and was housed five rats per AEM and exposed to all flight conditions (identical temperatures, lighting and humidity) except microgravity. Vivarium control group I did not receive any surgery and was housed in the vivarium in clear polycarbonate cages. Vivarium control group 2 received only a unilateral hysterectomy on day 20 of gestation but otherwise was housed like the vivarium control group 1. Control groups were allowed to complete their pregnancy and deliver fetuses from the remaining horn (Synchronous control and vivarium control group 2) or horns (Vivarium control group 1). After surgery, the dams were euthanized and tissues recovered, and the neonates were assigned to foster dams.

Burden, Hubert W.↗

An experimental study of transmission, reflection and scattering of sound in a free-jet flight simulation facility and comparison with theory

Acoustic time delays across a free-jet shear layer are measured and compared with predictions based on (1) ray paths refracted abruptly across a cylindrical vortex sheet and (2) ray paths traced through a more realistic diverging flow model. The close agreement between measurement and theory confirms that Snell's law provides an accurate prediction of wavefront refraction or angle changes across a diverging shear layer. Microphones are placed on calculated ray paths to determine the coherent transmission and internal reflection characteristics of the shear layer and also the scattering of sound by the shear-layer turbulence. The transmission data essentially verify the proposed, theoretical calibration factor which forms part of a computational procedure that is being developed to convert model jet data from a free-jet facility to inflight conditions.

Ahuja, K. K.↗

Flow Cytometry Methods to Monitor Immune System Dysregulation in Astronauts

Persistent immune system dysregulation has been documented to occur in astronauts participating in orbital spaceflight onboard the International Space Station. The phenomenon consists of reductions in T and NK cell function, altered cytokine profiles, persistent inflammation, and the subclinical reactivation of latent herpesviruses. In select crewmembers the dysregulation does actually lead to clinical symptoms, primarily atypical allergy or atopic dermatitis/zoster. Flow cytometry has served a central role defining the ‘immune assessment’ panel of assays that allow monitoring of astronauts. The cytometry assays which have been utilized include: 1. Peripheral leukocyte subsets 2. T cell function 3. Monocyte function 4. NK cell function 5. Intracellular cytokine analysis 6. Virus-specific T cell number (tetramer assay) 7. Virus-specific T cell function (peptide stimulation) 8. Leukocyte-bacterial challenge cytometry 9. Cytometric bead/multiplex array (soluble proteins) The use of these assays has been validated through various ISS flight investigations to define, to varying degrees, both in-flight, and post-flight immune system alterations. The kinetics of the dysregulation through the various phases of spaceflight, as well as post-flight recovery, have also been documented. To allow the science to occur within the orbital constraints of a spaceflight investigation, particular sample collection and processing techniques were developed compatible with the delays associated with terrestrial processing of in-flight samples. A subset of the assays has been adapted to routine monitoring of astronauts via a NASA ‘ISS Standard Measures’ activity, with the data from a specific crew then provided to all science investigators for that particular mission. This battery of cytometry assays has also been applied, through ground investigations, to several terrestrial ‘spaceflight analog’ populations. The purpose was to validate the analog which most closely replicates the in-flight observed pattern of alterations, generally believed to be winterover at an Antarctica station. To assist in determination of clinical risk, the assay panel has also been applied to investigations of various terrestrial patient populations, particularly zoster patients. As NASA is initiating crewed lunar missions via the ‘Artemis’ program, deployment of a miniaturized, microgravity-compatible flow cytometer, would be extremely beneficial to allow real time monitoring of crewmembers. Real time medical data could influence use of several countermeasures options during deep space missions. Several such instruments have been developed and validated to varying degrees of success. Assay details and summary findings across the various flight and ground platforms will be presented, as will current status in developing such technology for in-flight use.

Brian Crucian↗

The effect of space radiation on the induction of chromosome damage

To obtain information on the cytogenetic damage caused by space radiation, chromosome exchanges in lymphocytes from crewmembers of long-term Mir missions, and a shorter duration shuttle mission, were examined using fluorescence in situ hybridization. A significant increase in chromosomal aberrations was observed after the long duration flights. The ratio of aberrations identified as complex was higher post-flight for some crewmembers, which is thought to be an indication of exposure to high-LET radiation. Ground-based studies have shown that the frequency of aberrations measured post-flight could be influenced by a mitotic delay in cells damaged by high-LET radiation and this effect could lower biological dose estimates. To counteract this effect, prematurely condensed chromosome (PCC) spreads were collected. Frequencies of aberrations in PCC were compared with those in metaphase spreads.

long duration↗

Hard and Soft Safety Verifications

The purpose of this paper is to examine the differences between and the effects of hard and soft safety verifications. Initially, the terminology should be defined and clarified. A hard safety verification is datum which demonstrates how a safety control is enacted. An example of this is relief valve testing. A soft safety verification is something which is usually described as nice to have but it is not necessary to prove safe operation. An example of a soft verification is the loss of the Solid Rocket Booster (SRB) casings from Shuttle flight, STS-4. When the main parachutes failed, the casings impacted the water and sank. In the nose cap of the SRBs, video cameras recorded the release of the parachutes to determine safe operation and to provide information for potential anomaly resolution. Generally, examination of the casings and nozzles contributed to understanding of the newly developed boosters and their operation. Safety verification of SRB operation was demonstrated by examination for erosion or wear of the casings and nozzle. Loss of the SRBs and associated data did not delay the launch of the next Shuttle flight.

Wetherholt, Jon↗

Autonomous Mission Operations

NASA's Advanced Exploration Systems Autonomous Mission Operations (AMO) project conducted an empirical investigation of the impact of time-delay on todays mission operations, and of the effect of processes and mission support tools designed to mitigate time-delay related impacts. Mission operation scenarios were designed for NASA's Deep Space Habitat (DSH), an analog spacecraft habitat, covering a range of activities including nominal objectives, DSH system failures, and crew medical emergencies. The scenarios were simulated at time-delay values representative of Lunar (1.2-5 sec), Near Earth Object (NEO) (50 sec) and Mars (300 sec) missions. Each combination of operational scenario and time-delay was tested in a Baseline configuration, designed to reflect present-day operations of the International Space Station, and a Mitigation configuration in which a variety of software tools, information displays, and crew-ground communications protocols were employed to assist both crews and Flight Control Team (FCT) members with the long-delay conditions. Preliminary findings indicate: 1) Workload of both crew members and FCT members generally increased along with increasing time delay. 2) Advanced procedure execution viewers, caution and warning tools, and communications protocols such as text messaging decreased the workload of both flight controllers and crew, and decreased the difficulty of coordinating activities. 3) Whereas crew workload ratings increased between 50 sec and 300 sec of time-delay in the Baseline configuration, workload ratings decreased (or remained flat) in the Mitigation configuration.

Mission Operations↗

Materials processing in low gravity

Work is reported on the Materials Processing Low Gravity Program in which the University of Alabama worked with scientists and engineers at Marshall Space Flight Center to design, implement and perform low gravity experiments with various scientific investigators in materials processing science through March 15, 1989. The facilities used in these short duration low gravity experiments include the Drop Tube and Drop Tower at MSFC, and the KC-135 aircraft at Ellington Field. The utilization of these ground-based low gravity facilities for materials processing was instrumental in determining the feasibility of either performing a particular experiment in the microgravity of Space or continuing on-going activities which may have been delayed due to the absence of shuttle flights during this contractual effort.

Workman, Gary L.↗

Reducing Departure Delays for Adjacent Center Airports using Time-Based Flow Management Scheduler: Checkbox On or Off?

The Federal Aviation Administration (FAA) has enhanced the Time-Based Flow Management (TBFM) scheduling tool with a "Checkbox ON" vs. "OFF" function which allows Traffic Management Coordinators (TMCs) to make room in a crowded arrival stream for a departure. When scheduling a departure, having the checkbox ON can delay the Scheduled Times of Arrivals (STAs) of the airborne flights upstream of the TBFM freeze horizons and can compress these flights to their minimum required spacing, thereby creating a slot for a departure. Hence, having the checkbox ON can reduce the frequent ground delays of aircraft departing near high volume airports but can increase delays for airborne arrivals. A Human-in-the-Loop (HITL) simulation compared arrival and departure delays to Newark Airport (EWR) with the checkbox ON vs. OFF as the default position. Three other conditions in this HITL involved various National Airspace System (NAS)-wide approaches for timely delivery of aircraft to the TBFM region. These conditions were: Baseline, using current Mile-in-Trail (MIT) spacing restrictions; Integrated Demand Management (IDM), where all aircraft were given departure times (Expect Departure Clearance Times, or EDCTs), ultimately based on the EWR Airport Arrival Rate; and IDM plus Required Time of Arrival (RTA), a flight deck tool which allowed some aircraft to meet a controlled time of arrival to the TBFM area more precisely. Results showed that the checkbox tool was powerful: with the checkbox ON, departure delays decreased and airborne delays increased, as predicted. However, assuming that the cost ratio of a minute of airborne delay to a minute of departure delay is in the range of 1.2 to 3, as commonly indicated by the literature, checkbox ON and checkbox OFF conditions showed approximately equal total delay costs, i.e., the cost of delays in the air balanced the cost of the delay on the ground. The three scheduling conditions also had approximately equal total delay costs, although a simulation artifact may have reduced the delays in the Baseline condition. In the debrief following the simulation, the TMCs concluded that the checkbox should be used flexibly depending on the current delay situation, and suggested modifications to the checkbox tool which would help them use it in this way, along with enhanced training. The relatively similar total cost of both checkbox default options in this simulation indicates that this might be a fruitful approach, and replace the necessity to have the checkbox rigidly set to either ON or OFF.

departure delay↗

Mission Planner Algorithm for Urban Air Mobility – Initial Performance Characterization

In this paper, an initial characterization was performed of the Mission Planner algorithm developed by NASA for Urban Air Mobility (UAM) operations research. The algorithm plans conflict-free trajectories for flights to support a given set of UAM passenger trips. The UAM trips are planned in an on-demand, first-come, first-served manner, such that any given trip is subject to the constraints imposed by previously planned trips. For this analysis, the mission planning algorithm considered only the trajectory constraints from previously-planned trips in one test condition and added vertiport constraints for the second test condition. The conflict and constraint resolution strategies used by the Mission Planner were characterized by their percentage contribution to planning iterations, their percentage effectiveness in those iterations, and their contributions to the departure delay applied to each UAM trip’s flight. With the exception of the climb and descent vertical speed strategies, most strategies showed reasonable or good performance in all test scenarios. In the test condition with vertipad constraints enabled, both the total number of iterations executed, and the number of flights that required planning iterations, was reduced for all scenarios. This was the result of the natural conditioning of the traffic achieved with scheduling and the additional information available to the Mission Planner from the vertiport scheduler. The next steps for this work will include improvements to the mission planning strategies and analyses with additional constraints and under other demand scenarios.

Guerreiro, Nelson M.↗

A Control Allocation System for Automatic Detection and Compensation of Phase Shift Due to Actuator Rate Limiting

This paper proposes a control allocation system that can detect and compensate the phase shift between the desired and the actual total control effort due to rate limiting of the actuators. Phase shifting is an important problem in control system applications since it effectively introduces a time delay which may destabilize the closed loop dynamics. A relevant example comes from flight control where aggressive pilot commands, high gain of the flight control system or some anomaly in the system may cause actuator rate limiting and effective time delay introduction. This time delay can instigate Pilot Induced Oscillations (PIO), which is an abnormal coupling between the pilot and the aircraft resulting in unintentional and undesired oscillations. The proposed control allocation system reduces the effective time delay by first detecting the phase shift and then minimizing it using constrained optimization techniques. Flight control simulation results for an unstable aircraft with inertial cross coupling are reported, which demonstrate phase shift minimization and recovery from a PIO event.

Yildiz, Yidiray↗

TOPEX/POSEIDON microwave radiometer performance and in-flight calibration

Results of the in-flight calibration and performance evaluation campaign for the TOPEX/POSEIDON microwave radiometer (TMR) are presented. Intercomparisons are made between TMR and various sources of ground truth, including ground-based microwave water vapor radiometers, radiosondes, global climatological models, special sensor microwave imager data over the Amazon rain forest, and models of clear, calm, subpolar ocean regions. After correction for preflight errors in the processing of thermal/vacuum data, relative channel offsets in the open ocean TMR brightness temperatures were noted at the approximately = 1 K level for the three TMR frequencies. Larger absolute offsets of 6-9 K over the rain forest indicated a approximately = 5% gain error in the three channel calibrations. This was corrected by adjusting the antenna pattern correction (APC) algorithm. AS 10% scale error in the TMR path delay estimates, relative to coincident radiosondes, was corrected in part by the APC adjustment and in part by a 5% modification to the value assumed for the 22.235 FGHz water vapor line strength in the path delay retrieval algorithm. After all in-flight corrections to the calibration, TMR global retrieval accuracy for the wet tropospheric range correction is estimated at 1.1 cm root mean square (RMS) with consistent peformance under clear, cloudy, and windy conditions.

Ruf, C. S.↗

In-flight simulation studies at the NASA Dryden Flight Research Facility

Since the late 1950's, the National Aeronautics and Space Administration's Dryden Flight Research Facility has found in-flight simulation to be an invaluable tool. In-flight simulation has been used to address a wide variety of flying qualities questions, including low-lift-to-drag ratio approach characteristics for vehicles like the X-15, the lifting bodies, and the Space Shuttle; the effects of time delays on controllability of aircraft with digital flight-control systems, the causes and cures of pilot-induced oscillation in a variety of aircraft, and flight-control systems for such diverse aircraft as the X-15 and the X-29. In-flight simulation has also been used to anticipate problems and to avoid them and to solve problems once they appear. Presented here is an account of the in-flight simulation at the Dryden Flight Research Facility and some discussion. An extensive bibliography is included.

Shafer, Mary F.↗

In-flight simulation at the NASA Dryden Flight Research Facility

An account of the in-flight simulation at the Dryden Flight Research Facility is presented and various aircraft and tests performed are discussed. In-flight simulation has been utilized for a variety of flying quality investigations including low-lift-to-drag ratio approach characteristics for vehicles like the X-15, the lifting bodies, and the Space Shuttle. Consideration is given to the effects of time delays on controllability of aircraft with digital flight-control systems, flight control systems for such aircraft as the X-29, and the causes and cures of pilot-induced oscillation in diverse aircraft.

Shafer, Mary F.↗

A Near-Term Concept for Trajectory Based Operations with Air/Ground Data Link Communication

An operating concept and required system components for trajectory-based operations with air/ground data link for today's en route and transition airspace is proposed. Controllers are fully responsible for separation as they are today, and no new aircraft equipage is required. Trajectory automation computes integrated solutions to problems like metering, weather avoidance, traffic conflicts and the desire to find and fly more time/fuel efficient flight trajectories. A common ground-based system supports all levels of aircraft equipage and performance including those equipped and not equipped for data link. User interface functions for the radar controller's display make trajectory-based clearance advisories easy to visualize, modify if necessary, and implement. Laboratory simulations (without human operators) were conducted to test integrated operation of selected system components with uncertainty modeling. Results are based on 102 hours of Fort Worth Center traffic recordings involving over 37,000 individual flights. The presence of uncertainty had a marginal effect (5%) on minimum-delay conflict resolution performance, and windfavorable routes had no effect on detection and resolution metrics. Flight plan amendments and clearances were substantially reduced compared to today s operations. Top-of-descent prediction errors are the largest cause of failure indicating that better descent predictions are needed to reliably achieve fuel-efficient descent profiles in medium to heavy traffic. Improved conflict detections for climbing flights could enable substantially more continuous climbs to cruise altitude. Unlike today s Conflict Alert, tactical automation must alert when an altitude amendment is entered, but before the aircraft starts the maneuver. In every other failure case tactical automation prevented losses of separation. A real-time prototype trajectory trajectory-automation system is running now and could be made ready for operational testing at an en route Center in 1-2 years.

McNally, David↗

SHARP Demonstration Flight: Video Broadcast System for Research in Intelligent Flight Characterization and Control

The NASA Ames Research Center (Thermal Protection Materials and Systems Branch) is investigating new ceramic materials for the thermal protection of atmospheric entry vehicles. An incremental approach to proving the capabilities of these materials calls for a lifting entry flight test of a sharp leading edge component on the proposed SHARP (Slender Hypervelocity Aerothermodynamic Research Probe) vehicle. This flight test will establish the aerothermal performance constraint under real lifting entry conditions. NASA Ames has been developing the SHARP test flight with SSDL (responsible for the SHARP S I vehicle avionics), Montana State University (responsible for the SHARP S I vehicle airframe), the Wickman Spacecraft and Propulsion Company (responsible for the sounding rocket and launch operations), and with the SCU Intelligent Robotics Program, The SCU team was added well after the rest of the development team had formed. The SCU role was to assist with the development of a real-time video broadcast system which would relay onboard flight video to a communication groundstation. The SCU team would also assist with general vehicle preparation as well as flight operations. At the time of the submission of the original SCU proposal, a test flight in Wyoming was originally targeted for September 2000. This date was moved several times into the Fall of 2000. It was then postponed until the Spring of 2001, and later pushed into late Summer 2001. To date, the flight has still not taken place. These project delays resulted in SCU requesting several no-cost extensions to the project. Based on the most recent conversations with the project technical lead, Paul Kolodjiez, the current plan is for the overall SHARP team to assemble what exists of the vehicle, to document the system, and to 'mothball' the vehicle in anticipation of future flight and funding opportunities.

Kitts, Christopher↗

A parametric study of supersonic laminar flow for swept wings using linear stability analysis

A parametric study to predict the extent of laminar flow on the upper surface of a generic swept-back wing (NACA 64A010 airfoil section) at supersonic speeds was conducted. The results were obtained by using surface pressure predictions from an Euler/Navier-Stokes computational fluid dynamics code coupled with a boundary layer code, which predicts detailed boundary layer profiles, and finally with a linear stability code to determine the extent of laminar flow. The parameters addressed are Reynolds number, angle of attack, and leading-edge wing sweep. The results of this study show that an increase in angle of attack, for specific Reynolds numbers, can actually delay transition. Therefore, higher lift capability, caused by the increased angle of attack, as well as a reduction in viscous drag due to the delay in transition is possible for certain flight conditions.

Cummings, Russell M.↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Safety Risk Knowledge Elicitation in Support of Aeronautical R and D Portfolio Management: A Case Study

Aviation is a problem domain characterized by a high level of system complexity and uncertainty. Safety risk analysis in such a domain is especially challenging given the multitude of operations and diverse stakeholders. The Federal Aviation Administration (FAA) projects that by 2025 air traffic will increase by more than 50 percent with 1.1 billion passengers a year and more than 85,000 flights every 24 hours contributing to further delays and congestion in the sky (Circelli, 2011). This increased system complexity necessitates the application of structured safety risk analysis methods to understand and eliminate where possible, reduce, and/or mitigate risk factors. The use of expert judgments for probabilistic safety analysis in such a complex domain is necessary especially when evaluating the projected impact of future technologies, capabilities, and procedures for which current operational data may be scarce. Management of an R&D product portfolio in such a dynamic domain needs a systematic process to elicit these expert judgments, process modeling results, perform sensitivity analyses, and efficiently communicate the modeling results to decision makers. In this paper a case study focusing on the application of an R&D portfolio of aeronautical products intended to mitigate aircraft Loss of Control (LOC) accidents is presented. In particular, the knowledge elicitation process with three subject matter experts who contributed to the safety risk model is emphasized. The application and refinement of a verbal-numerical scale for conditional probability elicitation in a Bayesian Belief Network (BBN) is discussed. The preliminary findings from this initial step of a three-part elicitation are important to project management practitioners as they illustrate the vital contribution of systematic knowledge elicitation in complex domains.

Shih, Ann T.↗