Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Information Power Grid: Distributed High-Performance Computing and Large-Scale Data Management for Science and Engineering

We use the term "Grid" to refer to distributed, high performance computing and data handling infrastructure that incorporates geographically and organizationally dispersed, heterogeneous resources that are persistent and supported. This infrastructure includes: (1) Tools for constructing collaborative, application oriented Problem Solving Environments / Frameworks (the primary user interfaces for Grids); (2) Programming environments, tools, and services providing various approaches for building applications that use aggregated computing and storage resources, and federated data sources; (3) Comprehensive and consistent set of location independent tools and services for accessing and managing dynamic collections of widely distributed resources: heterogeneous computing systems, storage systems, real-time data sources and instruments, human collaborators, and communications systems; (4) Operational infrastructure including management tools for distributed systems and distributed resources, user services, accounting and auditing, strong and location independent user authentication and authorization, and overall system security services The vision for NASA's Information Power Grid - a computing and data Grid - is that it will provide significant new capabilities to scientists and engineers by facilitating routine construction of information based problem solving environments / frameworks. Such Grids will knit together widely distributed computing, data, instrument, and human resources into just-in-time systems that can address complex and large-scale computing and data analysis problems. Examples of these problems include: (1) Coupled, multidisciplinary simulations too large for single systems (e.g., multi-component NPSS turbomachine simulation); (2) Use of widely distributed, federated data archives (e.g., simultaneous access to metrological, topological, aircraft performance, and flight path scheduling databases supporting a National Air Space Simulation systems}; (3) Coupling large-scale computing and data systems to scientific and engineering instruments (e.g., realtime interaction with experiments through real-time data analysis and interpretation presented to the experimentalist in ways that allow direct interaction with the experiment (instead of just with instrument control); (5) Highly interactive, augmented reality and virtual reality remote collaborations (e.g., Ames / Boeing Remote Help Desk providing field maintenance use of coupled video and NDI to a remote, on-line airframe structures expert who uses this data to index into detailed design databases, and returns 3D internal aircraft geometry to the field); (5) Single computational problems too large for any single system (e.g. the rotocraft reference calculation). Grids also have the potential to provide pools of resources that could be called on in extraordinary / rapid response situations (such as disaster response) because they can provide common interfaces and access mechanisms, standardized management, and uniform user authentication and authorization, for large collections of distributed resources (whether or not they normally function in concert). IPG development and deployment is addressing requirements obtained by analyzing a number of different application areas, in particular from the NASA Aero-Space Technology Enterprise. This analysis has focussed primarily on two types of users: the scientist / design engineer whose primary interest is problem solving (e.g. determining wing aerodynamic characteristics in many different operating environments), and whose primary interface to IPG will be through various sorts of problem solving frameworks. The second type of user is the tool designer: the computational scientists who convert physics and mathematics into code that can simulate the physical world. These are the two primary users of IPG, and they have rather different requirements. The results of the analysis of the needs of these two types of users provides a broad set of requirements that gives rise to a general set of required capabilities. The IPG project is intended to address all of these requirements. In some cases the required computing technology exists, and in some cases it must be researched and developed. The project is using available technology to provide a prototype set of capabilities in a persistent distributed computing testbed. Beyond this, there are required capabilities that are not immediately available, and whose development spans the range from near-term engineering development (one to two years) to much longer term R&D (three to six years). Additional information is contained in the original.

Johnston, William E.↗

Future Missions for Gamma-Ray Astronomy

Gamma-ray astronomy has made great advances in recent years, due largely to the recently completed 9-year mission of the Compton Gamma Ray Observatory. In this talk I will give an overview of what advances we may expect in the near future, with particular emphasis on earth-orbiting missions scheduled for flight within the next 5 years. Two missions, the High Energy Transient Explorer and Swift, will provide important new information on the sources of gamma-ray bursts. The Gamma-Ray Large Area Space Telescope will investigate high energy emission from a wide variety of sources, including active galaxies and gamma-ray pulsars. The contributions of ground-based and multiwavelength observations will also be addressed.

Meegan, Charles↗

Extracting Olivine (Fo-Fa) Compositions from Raman Spectral Peak Positions

Olivine and pyroxene are two major basaltic minerals that have been identified at Gusev Crater and Meridiani Planum by the Mars Exploration Rovers. Full petrologic characterization of a sample (rock or soil), however, requires determining the range of mineral compositions, extent of zoning, range of grain sizes, mineral associations, presence of xenocrysts, etc. Information of this sort will aid the interpretation of sample crystallization and differentiation histories and help discriminate between lithologies. In Raman spectroscopic experiments, minerals are identified by their spectral patterns and mineral compositions can be inferred from the peak positions. Instruments currently in use or slated for impending surface exploration missions provide only average elemental compositions for relatively large rock or soil targets or bulk mineral analysis. No techniques currently in use or scheduled for flight can characterize both structure and composition of individual mineral grains, in-situ, like the Mars Microbeam Raman Spectrometer (MMRS). The MMRS is designed to take 100 spectra along a 1 cm linear traverse on the surface of a sample, with contributions from one or a few mineral phases per spectrum. We presented a method to extract structural and compositional information from the Raman spectra of quadrilateral pyroxenes. The pyroxene calibration was applied to a Raman spectroscopic study of Martian meteorite EETA79001 along with a preliminary olivine calibration, where we demonstrated the capability to discriminate related lithologies using Raman point counts. This paper presents an improved olivine calibration that will further aid sample characterization and the study of alteration processes.

Kuebler, K.↗

The MGS Avionics System Architecture: Exploring the Limits of Inheritance

Mars Global Surveyor (MGS) avionics system architecture comprises much of the electronics on board the spacecraft: electrical power, attitude and articulation control, command and data handling, telecommunications, and flight software. Schedule and cost constraints dictated a mix of new and inherited designs, especially hardware upgrades based on findings of the Mars Observer failure review boards.

Mars Global Surveyor MGS↗

NASA Global Hawk Project Overview

This viewgraph presentation reviews the Global Hawk project planning. Global Hawk is the only available system capable of simultaneously meeting the requirements for high altitude (65K ft), long endurance (>31 hours), power (10 KVA), and a large payload capacity (2000 lbs). There are important science data gathering and satellite validation requirements that can only be met with the combination of capabilities provided by the Global Hawk system. Global Hawk will give a unique range, shown in maps, at a high altitude. An overview of the design of the aircraft, and the ground station is given. The flights are scheduled to begin in 2009, and will carry instruments that will be used to validate the Aura satellite data and also be used in hurricane and severe storm research.

DelFrate, John↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

NASA Bioculture System: From Experiment Definition to Flight Payload

Starting in 2015, the NASA Bioculture System will be available to the science community to conduct cell biology and microbiology experiments on ISS. The Bioculture System carries ten environmentally independent Cassettes, which house the experiments. The closed loop fluids flow path subsystem in each Cassette provides a perfusion-based method for maintain specimen cultures in a shear-free environment by using a biochamber based on porous hollow fiber bioreactor technology. Each Cassette contains an incubator and separate insulated refrigerator compartment for storage of media, samples, nutrients and additives. The hardware is capable of fully automated or manual specimen culturing and processing, including in-flight experiment initiation, sampling and fixation, up to BSL-2 specimen culturing, and the ability to up to 10 independent cultures in parallel for statistical analysis. The incubation and culturing of specimens in the Bioculture System is a departure from standard laboratory culturing methods. Therefore, it is critical that the PI has an understanding the pre-flight test required for successfully using the Bioculture System to conduct an on-orbit experiment. Overall, the PI will conduct a series of ground tests to define flight experiment and on-orbit implementation requirements, verify biocompatibility, and determine base bioreactor conditions. The ground test processes for the utilization of the Bioculture System, from experiment selection to flight, will be reviewed. Also, pre-flight test schedules and use of COTS ground test equipment (CellMax and FiberCell systems) and the Bioculture System will be discussed.

Bioculture System↗

Supersonic Flight Dynamics Test 1 - Post-Flight Assessment of Simulation Performance

NASA's Low Density Supersonic Decelerator (LDSD) project conducted its first Supersonic Flight Dynamics Test (SFDT-1) on June 28, 2014. Program to Optimize Simulated Trajectories II (POST2) was one of the flight dynamics codes used to simulate and predict the flight performance and Monte Carlo analysis was used to characterize the potential flight conditions experienced by the test vehicle. This paper compares the simulation predictions with the reconstructed trajectory of SFDT-1. Additionally, off-nominal conditions seen during flight are modeled in post-flight simulations to find the primary contributors that reconcile the simulation with flight data. The results of these analyses are beneficial for the pre-flight simulation and targeting of the follow-on SFDT flights currently scheduled for summer 2015.

Dutta, Soumyo↗

Sleep in High Stress Occupations

High stress occupations are associated with sleep restriction, circadian misalignment and demanding workload. This presentation will provide an overview of sleep duration, circadian misalignment and fatigue countermeasures and performance outcomes during spaceflight and commercial aviation.

spaceflight↗

Analysis of CrIS ATMS and AIRS AMSU Data Using Scientifically Equivalent Retrieval Algorithms

Monthly mean August 2014 Version-6.28 AIRS and CrIS products agree well with OMPS and CERES, and reasonably well with each other. Version-6.28 CrIS total precipitable water is biased dry compared to AIRS. AIRS and CrIS Version-6.36 water vapor products are both improved compared to Version-6.28. Version-6.36 AIRS and CrIS total precipitable water also shows improved agreement with each other. AIRS Version-6.36 total ozone agrees even better with OMPS than does AIRS Version-6.28, and gives reasonable results during polar winter where OMPS does not generate products. CrIS and ATMS are high spectral resolution IR and Microwave atmospheric sounders currently flying on the SNPP satellite, and are also scheduled for flight on future NPOESS satellites. CrIS/ATMS have similar sounding capabilities to those of the AIRS/AMSU sounder suite flying on EOS Aqua. The objective of this research is to develop and implement scientifically equivalent AIRS/AMSU and CrIS/ATMS retrieval algorithms with the goal of generating a continuous data record of AIRS/AMSU and CrIS/ATMS level-3 data products with a seamless transition between them in time. To achieve this, monthly mean AIRS/AMSU and CrIS/ATMS retrieved products, and more importantly their interannual differences, should show excellent agreement with each other. The currently operational AIRS Science Team Version-6 retrieval algorithm has generated 14 years of level-3 data products. A scientifically improved AIRS Version-7 retrieval algorithm is expected to become operational in 2017. We see significant improvements in water vapor and ozone in Version-7 retrieval methodology compared to Version-6.We are working toward finalization and implementation of scientifically equivalent AIRS/AMSU and CrIS/ATMS Version-7 retrieval algorithms to be used for the eventual processing of all AIRS/AMSU and CrIS/ATMS data. The latest version of our retrieval algorithm is Verison-6.36, which includes almost all the improvements we want in Version-7. Version-6.28 has been used to process both AIRS and CrIS data for August 2014. This poster compares August 2014 monthly mean Version-6.28 AIRS/AMSU and CrIS/ATMS products with each other, and also with monthly mean products obtained using AIRS Version-6. AIRS and CrIS results using Version-6.36 are presented for April 15, 2016. These demonstrate further improvements since Version-6.28. The new results also show improved agreement of Version-6.36 AIRS and CrIS products with each other. Version-6.36 is not yet optimized for CrIS ozone products.

AIRS↗

ATD-2 Surface Scheduling and Metering Concept

This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

Departure↗

Validation of Fatigue Modeling Predictions in Aviation Operations

Bio-mathematical fatigue models that predict levels of alertness and performance are one potential tool for use within integrated fatigue risk management approaches. A number of models have been developed that provide predictions based on acute and chronic sleep loss, circadian desynchronization, and sleep inertia. Some are publicly available and gaining traction in settings such as commercial aviation as a means of evaluating flight crew schedules for potential fatigue-related risks. Yet, most models have not been rigorously evaluated and independently validated for the operations to which they are being applied and many users are not fully aware of the limitations in which model results should be interpreted and applied.

operational safety↗

International Life Sciences Research Announcement 'Pick and Eat' Project Contributions

The International Life Sciences Research Announcement (ILSRA) is a grant which focuses on 'Pick and Eat' salad-crop productivity, nutritional value, and acceptability to supplement the International Space Station (ISS) food system. My contributions into this project were to 1) manage the Veggie chambers to maintain optimal plant growth and attend to any plant needs, 2) analyze data for the VEG-04 Science Verification Test to create a water delivery schedule for the astronauts aboard the ISS, and 3) assume the role as a VEG-04 Experiment Verification Test (EVT) 'pseudonaut' to confirm that all schedules and flight procedures produce quality results. The VEG-04 EVT will continue up until the last day of my internship. Additionally, I'm currently working on two independent research projects, both of which provide insight to potential plant growth hardware options for lunar or Martian surfaces. One of which is a cable culture hydroponics system (favorable in areas with highly limited space), and the other are two aeroponic systems (a subset of hydroponics which uses no media and misting as its delivery for water and nutrients). All independent projects are still being tested and therefore results are not yet established. Lastly, I have been in charge of maintaining the AeroGarden (Registered Trademark), a hydroponic-aeroponic hybrid system which is currently being investigated as a concept to the potential for minimizing human involvement in the process of growing plants. This has the potential to play a major role in future technological project designs for spaceflight hardware. This system is an ongoing project that will continue once my internship ends.

Moore, Jessica↗

An Overview of the Volatiles Investigating Polar Exploration Rover (VIPER) Mission

A critical goal to both science and exploration is to understand the form and location of lunar polar volatiles. The lateral and vertical distributions of these volatiles inform us of the processes that control the emplacement and retention of these volatiles, as well as helping to formulate in-situ resource utilization (ISRU) architectures. While significant progress has been made from orbital observations, measurements at a range of scales from centimeters to kilometers across the lunar surface are needed to generate adequate "volatile mineral models" for use in evaluating the resource potential of volatiles at the Moon. VIPER is a solar and battery powered rover mission designed to operate over multiple lunar days, traversing several kilometers as it continuously monitors for subsurface hydrogen and other surface volatiles. In specific thermal terrain types, including permanently shadowed terrain and locales that permit near-surface ice stability, subsurface samples will be examined for volatile content using a one-meter drill. This talk will provide an overview of the VIPER mission which is scheduled for flight to the Lunar South Pole in December 2022.

Colaprete, Anthony↗

Flight Test of the Engine Fuel Schedules of the X-43A Hyper-X Research Vehicles

The Hyper-X program flew two X-43A Hyper-X Research Vehicles (HXRVs) in 2004, referred to as Ship 2 and Ship 3. The scramjet engine of the X-43A research vehicle was autonomously controlled in flight to track a predetermined fueling schedule. Ship 2 flew at approximately Mach 7 and Ship 3 flew at approximately Mach 10.

Jones, Thomas↗

Controlled Rest: Investigating the Use of an In-Flight Sleepiness Countermeasure

INTRODUCTION: Sleepiness is commonly reported amongst commercial airline pilots and is recognized as a safety risk due to its impact on performance. Controlled Rest (CR) refers to a short, voluntary nap opportunity taken by pilots on the flight deck as a countermeasure to unanticipated sleepiness in flight. This study explores the profile of CR use in a long-haul commercial airline. METHODS: Forty-four pilots filled in an application-based sleep/work diary and wore actiwatches for approximately 2 weeks. Complete data sets from 239 flights including sleep diaries, actigraphy, and schedules were merged and analyzed. Sleep diary entries were used to set CR intervals in the actigraphy software, which was then used to predict sleep within these intervals. All time-stamps of sleep periods and flight schedules were adjusted for home-base time of the pilots. Pearson Correlations were used to assess the influence of pilot demographics on CR use. A mixed-effects logistic regression was used to analyze the impact of schedule factors on CR. RESULTS: Pilots reported taking CR on 46% (n=110) of observed flights. Average CR attempt duration was 43.1 ± 11.0 minutes. Eighty-percent (n=106/133) of all CR attempts were estimated by actigraphy to have successfully achieved sleep with an average sleep duration during successful rest periods of 31.7 ± 12.2 minutes. Captains reported taking CR on 38% of flights (n=39/102), compared to First Officers reporting 52% (n=71/137) of flights with CR (p=0.131). Age, experience, BMI, and sleep need were not associated with the percentage of flights with CR (all p>0.244). The following schedule factors were associated with a higher frequency of CR: night (55%, n=76) vs. day flights (34%, n=34); <10h (63%, n=80) vs. >10h duration flights (27%, n=30); return (60%, n=71) vs. outbound flights (33%, n=39); and 2-pilot (69%, n=83) vs. >2-pilot flights (23%, n=27) (all p≤0.001). There was a trend for more CR on eastbound flights, but this was not significant (eastbound: 51%, n= 57; westbound: 40%, n= 44; p=0.059). Of note, 22% (n=26) of augmented flights (>2-pilots) contained both CR and Bunk Rest (in a designated rest facility). DISCUSSION: Data from this airline show that pilots commonly use CR to mitigate sleepiness in-flight, especially on flights <10h duration and during home-base nighttime flights. Future studies are required to determine generalizability of these results to other airlines.

sleepiness↗

Continuation of the University of Michigan Sounding Rocket Program

This interim report gives the activity on this grant through 31 October 1998, and the planned activities for the next fiscal year. A Project Initiation Conference (PIC) was held at the Wallops Flight Facility (WFF), with planning for the launch of flight 36.174 in Fall 1998. However, following the PIC, the WFF personnel decided that the experiment telemetry system had to be completely rewired, which required substantial design and wiring changes on the experiment side of the payload. These costs had not been anticipated in the FY98 budget, and used up considerable resources of the experimenters. In addition, the telemetry re-design was not completed until Fall 1998, so that there was no opportunity for a launch in 1998 (the Jupiter window closes in late November 1998 and it will reopen in late summer 1999). A Design Review was held by telecon with WFF personnel on 26 October 1998, with plans for the 36.174 launch now in late August 1999 with a launch window which extends into winter 2000. On a more positive note, we have been developing a vacuum UV calibration chamber in Michigan's Space Physics Research Lab, for future measurements of our experiment components, and this facility is now undergoing initial measurements of various calibration lamps in preparation for testing of the telescope UV reflective efficiency. This facility will greatly increase our ability to optimize our experiment for UV efficiency, which has been lacking in the past, and it will be made available for support of other NASA missions at Michigan and for visitors from other institutions. For the next flight 36.174, the following activities will be accomplished: (1) prepare the experiment, including replacement and upgrading of critical components, at University of Michigan; (2) pre-integrate the payload at the Wallops Flight Facility; (3) perform final far-UV calibration of instrument (4) perform final alignment, integration, and electrical checks at WSMR; (5) launch payload from WSMR and check condition of recovered payload; (6) perform post-flight calibration, if necessary and applicable (7) reduce and analyze flight data. The following pages contain information from the experimenter package for the Design Review for the next flight, 36.174, listing the plans, changes, and schedule for this flight.

Clarke, John↗

The NASA Human Space Flight Supply Chain, Current and Future

The current NASA Human Space Flight transportation system, the Space Shuttle, is scheduled for final flight in 2010. The Exploration initiative will create a new capability with a combination of existing systems and new flight and ground elements. To fully understand and act on the implications of such change it is necessary to understand what, how, when and where such changes occur and more importantly, how all these interact. This paper presents Human Space Flight, with an emphasis on KSC Launch and Landing, as a Supply Chain of both information and materials. A supply chain methodology for understanding the flow of information and materials is presented. Further, modeling and simulation projects funded by the Exploration initiative to understand the NASA Exploration Supply Chain are explained. Key concepts and their purpose, including the Enterprise, Locations, Physical and Organizational Functional Units, Products, and Resources, are explained. It is shown that the art, science and perspective of Supply Chain Management is not only applicable to such a government & contractor operation, it is also an invaluable approach for understanding, focusing improvement and growth. It is shown that such commercial practice applies to Human Space Flight and is invaluable towards one day creating routine, affordable access to and from space.

supply chain managemen↗