Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid current controller”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Switching-Cycle-Based Startup for Grid-tied Inverters

This paper presents a novel switching cycle-based startup approach that eliminates the need for voltage sensors and phase-locked loops. Here, the proposed method surpasses the bandwidth limitations inherent in traditional PLL-based synchronization techniques and attains grid synchronization of the inverter within two switching cycles. Despite the absence of voltage sensors and PLLs, this synchronization is achieved without inrush currents. Furthermore, the startup method does not necessitate the addition of any hardware or an increase in software complexity. Simulation and experimental results are presented to verify the effectiveness of the proposed method.

42 ENGINEERING↗

An Optimal Power Control Strategy for Grid-Following Inverters in a Synchronous Frame

This work proposes a power control strategy based on the linear quadratic regulator with optimal reference tracking (LQR-ORT) for a three-phase inverter-based generator (IBG) using an LCL filter. The use of an LQR-ORT controller increases robustness margins and reduces the quadratic value of the power error and control inputs during transient response. A model in a synchronous reference frame that integrates power sharing and voltage–current (V–I) dynamics is also proposed. This model allows for analyzing closed-loop eigenvalue location and robustness margins. The proposed controller was compared against a classical droop approach using proportional-resonant controllers for the inner loops. Mathematical analysis and hardware-in-the-loop (HIL) experiments under variations in the LCL filter components demonstrate fulfillment of robustness and performance bounds of the LQR-ORT controller. Experimental results demonstrate accuracy of the proposed model and the effectiveness of the LQR-ORT controller in improving transient response, robustness, and power decoupling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A State-Space Model of an Inverter-Based Microgrid for Multivariable Feedback Control Analysis and Design

In this work, a synchronous model for grid-connected and islanded microgrids is presented. The grid-connected model is based on the premise that the reference frame is synchronized with the AC bus. The quadrature component of the AC bus voltage can be cancelled, which allows to express output power as a linear equation for nominal values in the AC bus amplitude voltage. The model for the islanded microgrid is developed by integrating all the inverter dynamics using a state-space model for the load currents. This model is presented in a comprehensive way such that it could be scalable to any number of inverter-based generators using inductor–capacitor–inductor (LCL) output filters. The use of these models allows designers to assess microgrid stability and robustness using modern control methods such as eigenvalue analysis and singular value diagrams. Both models were tested and validated in an experimental setup to demonstrate their accuracy in describing microgrid dynamics. In addition, three scenarios are presented: non-controlled model, Linear-Quadratic Integrator (LQI) power control, and Power-Voltage (PQ/Vdq) droop–boost controller. Experimental results demonstrate the effectiveness of the control strategies and the accuracy of the models to describe microgrid dynamics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recent Advancements and Prospects of Chemical Heat Pumps for Temperature Amplification for Nuclear Process Heat Applications

The energy economy is continually evolving, particularly in terms of primary energy sources, their conversions to useful forms such as electricity and heat, and their utilization in different sectors, in response to socio-political factors. Because nuclear energy source is a clean and non-carbon-emitting energy source, it is crucial to consider its role in the evolution of the energy economy. Integrated Energy Systems (IES) are collaboratively controlled systems that can dynamically apportion thermal and/or electrical energy to promote the production of various energy products and have the potential to reduce greenhouse gas (GHG) emissions, improve energy efficiency, improve electrical grid dependability, and enhance energy economics. To realize the benefits of IES with the current reactor fleets, selection and development of a complimentary temperature upgrading technology are necessary for providing process heat and improving economics.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an Integrated Energy System (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. A new RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization (HERON) has been developed for optimizing the production variables of the IES given the demand profile. Currently, only the limits that affect the production variables and their corresponding time rates of change are considered (explicit constraints). However, other variables are additionally subject to constraints, but the associated limits are not accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response effects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. The Reference Governor (RG) algorithm is traditionally used for enforcing state and control constraints by modifying the set-point trajectories supplied to the feedback regulators. In our application, the RG is coupled within an iterative loop with the HERON-power dispatcher to generate optimal trajectories that ensure the operational constraints are met. A data-driven procedure to derive a representation of the dynamics of the controlled system was developed. First, the variables that represented the state of the system are selected (PCA-based approach), and then state-space representation matrices are derived from the collected measurements (DMDc algorithm). A preliminary version of the developed workflow based on Linear Time Invariant matrices was assessed by adopting a two-unit test case. More sophisticated versions of this workflow foreseeing the on-line derivation of system matrices will be deployed in FY 2021. Finally, a “plug-and-play” library of controllers and state observers was developed in Dymola. Some aspects of the current configuration of the IES unit components, e.g., the encapsulation of the control schemes into dedicated blocks, are consistent with the “plug-and-play” philosophy. Other features, e.g., the system buses collecting the input and the output variables, are not. For this reason, once listed and described the limits of the current configuration, necessary modifications to the plant model interface are presented. As a test-case, the interfaces of the SES model in the RAVEN-based HYBRID framework were reworked accordingly, and two different control schemes were applied to the same plant model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of Grid Services Using Mixed Grid-Forming and Grid-Following Technologies at the Wheatridge Renewable Energy Facility (Final Technical Report)

This Final Technical Report summarizes the analytical, modeling, and engineering work performed to evaluate grid-forming (GFM) inverter capabilities within a large hybrid renewable energy facility. The project focused on assessing the ability of advanced inverter-based resources to provide essential reliability services through coordinated operation of grid-forming (GFM) and grid-following (GFL) technologies. During Budget Period 1, the project developed a comprehensive framework of GFM performance metrics, including angle support, voltage regulation, frequency response, damping behavior, and current-limiting performance. Extensive electromagnetic transient (EMT) studies and hardware-in-the-loop (HIL) testing were conducted to validate GFM behavior under a range of operating conditions, including weak-grid scenarios, voltage disturbances, and multi-resource interactions. The project also established validated modeling approaches, plant-level control integration strategies, commissioning frameworks, and high-speed measurement infrastructure to support future field demonstration. Although the project concluded prior to field demonstration, the results provide a utility-scale foundation for evaluating, modeling, and deploying grid-forming technologies. The methodologies and tools developed contribute to industry understanding of inverter-based resource behavior and support future power system reliability under increasing renewable penetration.

14 SOLAR ENERGY↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Control and Stability Analysis for a Nonisolated Grid-Tied DC Energy Router Integrating Energy Storage and Partial Distributed Generation

This article proposes a nonisolated dc converter-based energy router (dc-ER) and its operating strategy. Here, the intent is to integrate energy storage (ES), distributed generation (DG), local load, and dc power grid in an autonomous and more efficient way. The ES/DG power ports are coupled with each other in partial-type connections, which obtains higher voltage supply gain and direct input–output power transmission. High-voltage supply gain allows a wide solar power tracking range and the possibility of optimal battery charging/discharging. Direct input–output power transmission improves the energy conversion efficiency. In this article, the operating modes of dc-ER are first analyzed, followed by the optimal hardware design counting the DG current ripple minimization and the limitation caused by the power flow direction. Second, the mathematical model of dc-ER is deduced. The hierarchical control is then proposed to manage port energy in a flexible manner. The stability is analyzed by using impedance modeling. Finally, experimental and simulation results verify the superiorities of the proposed topology in terms of flexible operating mode transition and high-power conversion efficiency.

25 ENERGY STORAGE↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (control-lable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources: Preprint

Integration of a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problem requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs) including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperformed other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Generic and Multi-Functional Electromagnetic Transient Model for Grid-Following Inverter: Preprint

This article presents a generic and multi-functional electromagnetic transient (EMT) dynamic model of grid following (GFL) inverter-based resource (IBR) using the PSCAD TM software platform. The features of the developed model includes the flexibility in selecting various types and combinations of DC sources covering PV modules, battery modules, ideal DC source module, as well as flexibility in selecting either switched or averaged model of inverter. This model also covers exhaustive lists of controller logic covering open-loop/closed-loop PQ dispatch control, DC voltage and AC terminal voltage control along with the conventional current control designed in dq-domain, aB- domain and positive-negative sequence domain. Moreover, this model is equipped with the flexibility in selecting various types of current limiting schemes that includes saturation-based as well as latching-based current limiter, anti-windup protection. Moreover, the EMT model is agnostic to the MVA rating and is suitable for interfacing transmission systems by being complaint with the IEEE Std. 2800. The generality in the power circuits and the multi-functional options in operation and control of the developed EMT model makes it suitable for both academia and industry to study various power system aspects not limited to but such as fault behavior of GFL IBR and impacts on protection system, transient stability of a system interfaced with large number of GFL IBRs etc.

grid following inverter↗

Recursive Dynamic Compressive Sensing in Smart Distribution Systems

With a transition to a smarter grid, we are witnessing a significant growth in smart metering infrastructure and sensor deployment in the distribution system. The underlying communication infrastructure is stressed due to the large volume of data that is generated by the smart meters/sensors. Furthermore, real time operations such as state estimation and control are impaired due to the lack of reliable aggregation of the data. In this paper, we exploit the underlying sparsity in grid data to implement two recursive dynamic compressive sensing (CS) approaches-streaming modified weighted-`1 CS and Kalman filtered CS. These approaches aim to reconstruct the sparse signal using the current underdetermined measurements and the prior information about the sparse signal and its support set. Slow signal and support change is in distribution grid data is validated using Pecan Street data. Both the IEEE 34 node test feeder system and PecanStreet data are considered as two examples to validate the superior performance of the two recursive CS techniques relative to classic CS.

Karimi, Hazhar Sufi↗

Putting Our Industry's Data to Work: A Case Study of Large-Scale Data Aggregation: Preprint

With increasing deployment of Advanced Metering Infrastructure (AMI), Building Automation System (BAS) controls, Internet of Things (IoT) network devices, and data-driven evaluation, measurement, and verification studies, the building sector is currently generating a staggering amount of energy-related data. In the right hands, these data sets can contribute to increased comfort and energy savings for building occupants and a more reliable electrical grid; however, due to a combination of factors, including significant privacy concerns, much of the data that are presently generated and stored are not used outside of basic operational applications. In the past year, our team has dedicated over 2,000 person-hours to accessing building energy data for a project funded by the U.S. Department of Energy (DOE) Building Technologies Office. We sought whole-building or end-use (e.g., lighting) timeseries data at the individual-building or equipment level where possible or aggregated information, such as timeseries averages and quartiles by building type (e.g., office, retail, hospital), where sharing individual building information was not an option. We are additionally working with IoT and BAS data sets to derive information important to the project. We have assembled an extensive data set that will enable the development of publicly available end-use load profiles to benefit the U.S. building and electricity industries. Here we present an overview of the data set that we have assembled to date, the motivators and approaches that got us here, and the lessons we learned through our efforts. We also discuss work underway that presents additional options for future data access.

building energy data↗

Distributed, Intelligent Edge-Sensing for a Smarter Grid

The electric grid is undergoing major transformations and developments resulting in unprecedented levels of volatility, uncertainty, and stress on grid infrastructure. Smart sensors and methods aiding in advanced visibility and situational awareness are key for tackling these issues. In this work, a decentralized architecture is proposed, where sensing, local computation and control capability are embedded in the edge devices, communicating with a set of trusted 'data mules' in a 'delay-tolerant' manner, while functioning autonomously. This system has been designed and implemented as an overall platform – called Global Asset Monitoring, Management and Analytics (GAMMA) Platform intended to provide the backbone for a global array of sensors and actuators. Further, as a building block for advanced current sensing solutions, a smart, low-cost ‘clip-on’ current sensor based on PCB-embedded Rogowski coil has been developed. The sensor hosts a novel signal conditioning stage allowing an 'auto-tuning' feature, resulting in a universal current sensor design for measuring a wide range of currents, including faults for smart grid applications. Finally, the research proposes a method to instrument and monitor key parameters for the most common electric utility asset – the pole-top distribution transformer. The work done in this research enables scalable, edge-intelligent sensing solutions for monitoring grid infrastructure, allowing utility operators to gain advanced visibility in an economical way.

Kulkarni, Shreyas Bhalchandra↗