Search NASA⌕ Search

SEARCH · Search NASA

Results for “interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Evaluating Trade-offs in Potential Exascale Interconnect Topologies

This study looks at the high-level trade-offs for interconnect architectures that are likely to be available in HPC machines in the 2021-2022 timeframe. The study uses multiple simulation models to look at the effects of varying machine size, injection bandwidth and topology for a selected set of benchmark communication patterns. The studies show the sensitivity of various applications to these network parameters. This study can help inform decisions on node size versus number of nodes, which topology is most efficient for our applications, how much injection bandwidth to provision, etc. These simulations only look at interconnects with maximally configured global bandwidth, and studies of networks configured with less will be the subject of future milestones.

97 MATHEMATICS AND COMPUTING↗

Supporting the Nation's Electric Interconnections through Integration of Water into their Long-Term Transmission Planning.

Water is a critical resource in the production of electric power. The purpose of this plan is to extend support to the nation's three electric interconnections toward integrating water issues into their long-range transmission planning. This continued support is at the request of the interconnections. The proposed program leverages prior support as well as that of other similarly focused efforts funded across the Department of Energy (DOE). The effort will utilize a project team lead by Sandia National Laboratories and supported by Argonne National Laboratory, National Renewable Energy Laboratory, and Pacific Northwest National Laboratory. The activities recorded here are meant to provide a menu of potential projects that could be implemented as available resources permit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Trade-offs in Potential Exascale Interconnect Technologies

This report details work to study trade-offs in topology and network bandwidth for potential interconnects in the exascale (2021-2022) timeframe. The work was done using multiple interconnect models across two parallel discrete event simulators. Results from each independent simulator are shown and discussed and the areas of agreement and disagreement are explored.

97 MATHEMATICS AND COMPUTING↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Distributed Wind Interconnection Technology and Standards

The objectives of this report are to discuss the uniqueness of power converters in distributed wind (DW), identify challenges in complying with existing standards, prioritize technological innovations to facilitate interconnection of DW energy systems, and, where necessary, propose potential clarifications or revisions to standards. This report evaluates IEEE 1547-2018, IEEE 1547.1-2020, and UL 1741 SB standards and their implications for DW. A standards review and interviews of DW industry stakeholders were conducted to identify challenges in the application of current standards to DW. The study concludes with a combination of recommendations of pathways towards facilitating DW product commercialization and DW interconnection, which draws on participation from multiple stakeholders in the space. These solutions can continue to be explored to improve DW standards compliance, improve the applicability of the standards to DW, reduce certification testing barriers, and ensure the safe and reliable operation of DW energy resources and electric power systems.

17 WIND ENERGY↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗

Interconnections for fluidic circuits

Circuit elements are grouped on functional basis in rectangular two-dimensional planar arrays or modules. Another interconnection method brings all connections out to module edge. For smaller fluidic circuits, manifold and interconnections are fabricated as single blocks. Advantages of methods are given.

Mangion, C.↗

Manufacture and quality control of interconnecting wire hardnesses, Volume 1

A standard is presented for manufacture, installation, and quality control of eight types of interconnecting wire harnesses. The processes, process controls, and inspection and test requirements reflected are based on acknowledgment of harness design requirements, acknowledgment of harness installation requirements, identification of the various parts, materials, etc., utilized in harness manufacture, and formulation of a typical manufacturing flow diagram for identification of each manufacturing and quality control process, operation, inspection, and test. The document covers interconnecting wire harnesses defined in the design standard, including type 1, enclosed in fluorocarbon elastomer convolute, tubing; type 2, enclosed in TFE convolute tubing lines with fiberglass braid; type 3, enclosed in TFE convolute tubing; and type 5, combination of types 3 and 4. Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated.

Source record↗

Development of automatic through-insulation welding for microelectric interconnections

The capability to automatically route, remove insulation from, and weld small-diameter solid conductor wire is presented. This would facilitate the economical small-quantity production of complex miniature electronic assemblies. An engineering model of equipment having this capability was developed and evaluated. Whereas early work in the use of welded magnet wire interconnections was concentrated on opposed electrode systems, and generally used heat to melt the wire insulation, the present method is based on a concentric electrode system and a wire feed system which splits the insulation by application of pressure prior to welding. The work deals with the design, fabrication, and evaluation testing of an improved version of this concentric electrode system. Two different approaches to feeding the wire to the concentric electrodes were investigated. It was concluded that the process is feasible for the interconnection of complex miniature electronic assemblies.

Arnett, J. C.↗

Solar cell welded interconnection development program

Parallel gap welding and ultrasonic bonding techniques were developed for joining selected interconnect materials (silver, aluminum, copper, silver plated molybdenum and Kovar) to silver-titanium and aluminum contact cells. All process variables have been evaluated leading to establishment of optimum solar cell, interconnect, electrodes and equipment criteria for obtainment of consistent high quality welds. Applicability of nondestructive testing of solar cell welds has been studied. A pre-weld monitoring system is being built and will be utilized in the numerically controlled parallel gap weld station.

Katzeff, J. S.↗

Stability of interconnected dynamical systems described on Banach spaces

New stability results for a large class of interconnected dynamical systems (also called composite systems or large scale systems) described on Banach spaces are established. In the present approach, the objective is always the same: to analyze large scale systems in terms of their lower order and simpler subsystems and in terms of their interconnecting structure. The present results provide a systematic procedure of analyzing hybrid dynamical systems (i.e., systems that are described by a mixture of different types of equations). To demonstrate the method of analysis advanced, two specific examples are considered.

Rasmussen, R. D.↗

Panel C report: Standards needed for the use of ISO Open Systems Interconnection - basic reference model

The use of an International Standards Organization (ISO) Open Systems Interconnection (OSI) Reference Model and its relevance to interconnecting an Applications Data Service (ADS) pilot program for data sharing is discussed. A top level mapping between the conjectured ADS requirements and identified layers within the OSI Reference Model was performed. It was concluded that the OSI model represents an orderly architecture for the ADS networking planning and that the protocols being developed by the National Bureau of Standards offer the best available implementation approach.

Source record↗

Method for sequentially processing a multi-level interconnect circuit in a vacuum chamber

The processing of wafer devices to form multilevel interconnects for microelectronic circuits is described. The method is directed to performing the sequential steps of etching the via, removing the photo resist pattern, back sputtering the entire wafer surface and depositing the next layer of interconnect material under common vacuum conditions without exposure to atmospheric conditions. Apparatus for performing the method includes a vacuum system having a vacuum chamber in which wafers are processed on rotating turntables. The vacuum chamber is provided with an RF sputtering system and a DC magnetron sputtering system. A gas inlet is provided in the chamber for the introduction of various gases to the vacuum chamber and the creation of various gas plasma during the sputtering steps.

Routh, D. E.↗