Search NASA⌕ Search

SEARCH · Search NASA

Results for “requirements verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Requirements for CFD validation experiments

A list of requirements for computational fluid dynamics verification is analyzed and evaluated. Requirements include: clearly defined physics and modeling, sensitivity studies, range, validation to real conditions, duplication of key experiments and computations, and combining experiments and computations. All results are presented in viewgraph format.

Bogdonoff, S. M.↗

From Livingstone to SMV: Formal Verification for Autonomous Spacecrafts

To fulfill the needs of its deep space exploration program, NASA is actively supporting research and development in autonomy software. However, the reliable and cost-effective development and validation of autonomy systems poses a tough challenge. Traditional scenario-based testing methods fall short because of the combinatorial explosion of possible situations to be analyzed, and formal verification techniques typically require a tedious, manual modelling by formal method experts. This paper presents the application of formal verification techniques in the development of autonomous controllers based on Livingstone, a model-based health-monitoring system that can detect and diagnose anomalies and suggest possible recovery actions. We present a translator that converts the models used by Livingstone into specifications that can be verified with the SMV model checker. The translation frees the Livingstone developer from the tedious conversion of his design to SMV, and isolates him from the technical details of the SMV program. We describe different aspects of the translation and briefly discuss its application to several NASA domains.

Pecheur, Charles↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

Verifying performance requirements

Today, it is impossible to verify performance requirements on Ada software, except in a very approximate sense. There are several reasons for this difficulty, of which the main reason is the lack of use of information on the mapping of the program onto the target machine. An approach to a partial solution to the verification of performance requirements on Ada software is proposed, called the rule based verification approach. This approach is suitable when the target machine is well defined and when additional effort and expense are justified in order to guarantee that the performance requirements will be met by the final system.

Cross, Joseph↗

The Ten Lockheed Martin Cyber-Physical Challenges: Formalized, Analyzed, and Explained

Capturing and analyzing requirements of Cyber-Physical Systems (CPS) can be challenging, since CPS models typically involve time-varying and real-valued variables, physical system dynamics, or even adaptive behavior. MATLAB/Simulinkis a development and simulation framework that is widely used in industry to capture such systems. In this paper, we report on the application of NASA Ames tools to perform end-to-end analysis of the Ten Lockheed Martin Challenge Problems (LMCPS). LMCPS is a set of industrial Simulink model benchmarks and natural language requirements developed by domain experts. Our framework, which integrates the tools FRET and COCOSIM, is used to: 1) elicit, explain, and formalize the semantics of the given natural language requirements; 2) generate verification code and monitors that can be automatically attached to the Simulink models; 3) perform verification by using SMT-based model checkers. FRET and COCOSIM are open source, and can be used by other researchers and practitioners to replicate our case study. We provide a categorization of recurring patterns in the formalization of the requirements and discuss the strengths and weaknesses of our automated verification approach.

Anastasia Mavridou↗

V. The X-15 flight research program in relation to the development of advanced military aircraft

The design, construction, and development of advanced military aircraft undoubtedly will involve the utilization of many relatively new concepts in several deafferent, but related, areas. In many cases, these new concepts will require new flight techniques or involve development problems inherent in the use of relatively unproven methods, materials, structures, systems, and configurations. Moreover, flight verification will be required of aircraft aerodynamics and flight behavior because of the usual uncertainties associated with predicted data. Solutions to these problems obviously would require flight testing involving extensive time and effort before the aircraft could become operationally acceptable. Upon the inception of the X-15 research airplane project, many new and far-reaching techniques and principles were studied and applied in the aircraft design and are currently being demonstrated and investigated. Because similar concepts are likely to be used in advanced military aircraft, the X-15 flight program will provide significant information, over a broad flight environment, pertinent to the development of these vehicles. This paper discusses the research objectives of the X-15 flight program, some of the flight aerodynamic characteristics currently being obtained, some development problems encountered, and the experience obtained with the advanced systems investigated.

Military aircraft↗

Control System Modeling for the Thirty Meter Telescope Primary Mirror

The Thirty Meter Telescope primary mirror is composed of 492 segments that are controlled to high precision in the presence of wind and vibration disturbances, despite the interaction with structural dynamics. The higher bandwidth and larger number of segments compared with the Keck telescopes requires greater attention to modeling to ensure success. We focus here on the development and validation of a suite of quasi-static and dynamic modeling tools required to support the design process, including robustness verification, performance estimation, and requirements flowdown. Models are used to predict the dynamic response due to wind and vibration disturbances, estimate achievable bandwidth in the presence of control-structure-interaction (CSI) and uncertainty in the interaction matrix, and simulate and analyze control algorithms and strategies, e.g. for control of focus-mode, and sensor calibration. Representative results illustrate TMT performance scaling with parameters, but the emphasis is on the modeling framework itself.

uncetainty↗

Accuracy requirements and benchmark experiments for CFD validation

The role of experiment in the development of Computation Fluid Dynamics (CFD) for aerodynamic flow prediction is discussed. The CFD verification is a concept that depends on closely coordinated planning between computational and experimental disciplines. Because code applications are becoming more complex and their potential for design more feasible, it no longer suffices to use experimental data from surface or integral measurements alone to provide the required verification. Flow physics and modeling, flow field, and boundary condition measurements are emerging as critical data. Four types of experiments are introduced and examples given that meet the challenge of validation: flow physics experiments; flow modeling experiments; calibration experiments; and verification experiments. Measurement and accuracy requirements for each of these differ and are discussed. A comprehensive program of validation is described, some examples given, and it is concluded that the future prospects are encouraging.

Marvin, Joseph G.↗

Accuracy requirements and benchmark experiments for CFD validation

The role of experiment in the development of Computational Fluid Dynamics (CFD) for aerodynamic flow prediction is discussed. The CFD verification is a concept that depends on closely coordinated planning between computational and experimental disciplines. Because code applications are becoming more complex and their potential for design more feasible, it no longer suffices to use experimental data from surface or integral measurements alone to provide the required verification. Flow physics and modeling, flow field, and boundary condition measurements are emerging as critical data. Four types of experiments are introduced and examples are given that meet the challenge of validation: flow physics experiments; flow modeling experiments; calibration experiments; and verification experiments. Measurement and accuracy requirements for each of these differ and are discussed. A comprehensive program of validation is described, some examples given, and it is concluded that the future prospects are encouraging.

Marvin, Joseph G.↗

Synthesizing Certified Code

Code certification is a lightweight approach to demonstrate software quality on a formal level. Its basic idea is to require producers to provide formal proofs that their code satisfies certain quality properties. These proofs serve as certificates which can be checked independently. Since code certification uses the same underlying technology as program verification, it also requires many detailed annotations (e.g., loop invariants) to make the proofs possible. However, manually adding theses annotations to the code is time-consuming and error-prone. We address this problem by combining code certification with automatic program synthesis. We propose an approach to generate simultaneously, from a high-level specification, code and all annotations required to certify generated code. Here, we describe a certification extension of AUTOBAYES, a synthesis tool which automatically generates complex data analysis programs from compact specifications. AUTOBAYES contains sufficient high-level domain knowledge to generate detailed annotations. This allows us to use a general-purpose verification condition generator to produce a set of proof obligations in first-order logic. The obligations are then discharged using the automated theorem E-SETHEO. We demonstrate our approach by certifying operator safety for a generated iterative data classification program without manual annotation of the code.

Whalen, Michael↗

Independent Verification Plan for Clearance of Real Property of the Operation Roller Coaster Sites

The U.S. Department of Energy (DOE) is pursuing release of the Operation Roller Coaster sites under DOE O 458.1, “Radiation Protection of the Public and the Environment.” The requirements for clearance and release of property under DOE O 458.1 are implemented when DOE intends to facilitate transfer of responsibility or control of real property from DOE. DOE O 458.1 prescribes that all radiological monitoring or surveys performed in support of clearance of property must use methods such as the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) method or other methods approved by DOE. DOE O 458.1 requires an Independent Verification for the clearance of real property. This Independent Verification Plan outlines the process for validating the method and implementation of the MARRSIM process for release of the Operation Roller Coaster sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cryogenic Thermal Distortion Performance Characterization for the JWST ISIM Structure

The James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Structure is a precision optical metering structure for the JWST science instruments. Optomechanical performance requirements place stringent limits on the allowable thermal distortion of the metering structure between ambient and cryogenic operating temperature (~35 K). This paper focuses on thermal distortion testing and successful verification of performance requirements for the flight ISIM Structure. The ISIM Structure Cryoset Test was completed in Spring 2010 at NASA Goddard Space Flight Center in the Space Environment Simulator Chamber. During the test, the ISIM Structure was thermal cycled twice between ambient and cryogenic (~35 K) temperatures. Photogrammetry was used to measure the Structure in the ambient and cryogenic states for each cycle to assess both cooldown thermal distortion and repeatability. This paper will provide details on the post-processing of the metrology datasets completed to compare measurements with performance requirements.

Johnston, John D.↗

Behavioral model simulation studies of an image compressor

The high initial cost of prototype Very Large Scaled Integrated (VLSI) parts requires that sufficient verifications be made to eliminate design errors before actually producing the prototypes. Logic simulation is the means by which the VLSI engineer can ensure that the design will function properly. The computer time required for logic simulation can be reduced through the use of behavioral models. Behavioral models, however, require time to write and verify and they do not always produce a dramatic speed up in logic simulation time. This paper presents a study of behavioral modeling aimed at discovering which circuit types benefit most from the use of behavioral models for logic simulation.

Madani, Navid↗

SSME lifetime prediction and verification, integrating environments, structures, materials: The challenge

The planned missions for the space shuttle dictated a unique and technology-extending rocket engine. The high specific impulse requirements in conjunction with a 55-mission lifetime, plus volume and weight constraints, produced unique structural design, manufacturing, and verification requirements. Operations from Earth to orbit produce severe dynamic environments, which couple with the extreme pressure and thermal environments associated with the high performance, creating large low cycle loads and high alternating stresses above endurance limit which result in high sensitivity to alternating stresses. Combining all of these effects resulted in the requirements for exotic materials, which are more susceptible to manufacturing problems, and the use of an all-welded structure. The challenge of integrating environments, dynamics, structures, and materials into a verified SSME structure is discussed. The verification program and developmental flight results are included. The first six shuttle flights had engine performance as predicted with no failures. The engine system has met the basic design challenges.

Ryan, R. S.↗

Integrated guidance, navigation and control verification plan primary flight system

The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.

Source record↗

Critical Surface Cleaning and Verification Alternatives

As a result of federal and state requirements, historical critical cleaning and verification solvents such as Freon 113, Freon TMC, and Trichloroethylene (TCE) are either highly regulated or no longer 0 C available. Interim replacements such as HCFC 225 have been qualified, however toxicity and future phase-out regulations necessitate long term solutions. The scope of this project was to qualify a safe and environmentally compliant LOX surface verification alternative to Freon 113, TCE and HCFC 225. The main effort was focused on initiating the evaluation and qualification of HCFC 225G as an alternate LOX verification solvent. The project was scoped in FY 99/00 to perform LOX compatibility, cleaning efficiency and qualification on flight hardware.

Melton, Donald M.↗

The development and verification of shuttle orbiter random vibration test requirements

The unique space shuttle vehicle size, weight, and configuration gave rise to problems in determining vibration requirements and in verifying structural integrity for anticipated mission environments. The applications of large-scale vibration testing played a prominent part in qualifying the shuttle for its intended missions. Severe vibration excitation from rocket engines, aerodynamic noise, and onboard equipment are expected on each shuttle flight. Scale-model wind tunnel and rocket firing tests, as well as full-size rocket engine tests were relied on to define the random forcing functions. The determination of structural response to these environments is described as well as evaluations of measured flight data and comparison with predicted design and test criteria.

Coody, M. C.↗