Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

EPICS Channel Access Server for LabVIEW

It can be challenging to interface National Instruments LabVIEW (http://www.ni.com/labview/) with EPICS (http://www.aps.anl.gov/epics/). Such interface is required when an instrument control program was developed in LabVIEW but it also has to be part of global control system. This is frequently useful in big accelerator facilities. The Channel Access Server is written in LabVIEW, so it works on any hardware/software platform where LabVIEW is available. It provides full server functionality, so any EPICS client can communicate with it.

Zhukov, Alexander P.↗

Neutron generation using pyroelectric crystals

According to one embodiment, a method for producing a directed neutron beam includes producing a voltage of negative polarity of at least −100 keV on a surface of a deuterated or tritiated target in response to a temperature change of a pyroelectric crystal of less than about 40° C., the pyroelectric crystal having the deuterated or tritiated target coupled thereto, pulsing a deuterium ion source to produce a deuterium ion beam, accelerating the deuterium ion beam to the deuterated or tritiated target to produce a neutron beam, and directing the ion beam onto the deuterated or tritiated target to make neutrons using at least one of a voltage of the pyroelectric crystal, and a high gradient insulator (HGI) surrounding the pyroelectric crystal. The directionality of the neutron beam is controlled by changing the accelerating voltage of the system. Other methods are presented as well.

Tang, Vincent↗

Implementation and experimental results of 4D tumor tracking using robotic couch

Purpose: This study presents the implementation and experimental results of a novel technique for 4D tumor tracking using a commercially available and commonly used treatment couch and evaluates the tumor tracking accuracy in clinical settings. Methods: Commercially available couch is capable of positioning the patient accurately; however, currently there is no provision for compensating physiological movement using the treatment couch in real-time. In this paper, a real-time couch tracking control technique is presented together with experimental results in tumor motion compensation in four dimensions (superior-inferior, lateral, anterior-posterior, and time). To implement real-time couch motion for tracking, a novel control system for the treatment couch was developed. The primary functional requirements for this novel technique were: (a) the treatment couch should maintain all previous/normal features for patient setup and positioning, (b) the new control system should be used as a parallel system when tumor tracking would be deployed, and (c) tracking could be performed in a single direction and/or concurrently in all three directions of the couch motion (longitudinal, lateral, and vertical). To the authors' best knowledge, the implementation of such technique to a regular treatment couch for tumor tracking has not been reported so far. To evaluate the performance of the tracking couch, we investigated the mechanical characteristics of the system such as system positioning resolution, repeatability, accuracy, and tracking performance. Performance of the tracking system was evaluated using dosimetric test as an endpoint. To investigate the accuracy of real-time tracking in the clinical setting, the existing clinical treatment couch was replaced with our experimental couch and the linear accelerator was used to deliver 3D conformal radiation therapy (3D-CRT) and intensity modulated radiation therapy (IMRT) treatment plans with and without tracking. The results of radiation dose distribution from these two sets of experiments were compared and presented here. Results: The mechanical accuracies were 0.12, 0.14, and 0.18 mm in X, Y, and Z directions. The repeatability of the desired motion was within {+-}0.2 mm. The differences of central axis dose between the 3D-CRT stationary plan and two tracking plans with different motion trajectories were 0.21% and 1.19%. The absolute dose differences of both 3D tracking plans comparing to the stationary plan were 1.09% and 1.20%. Comparing the stationary IMRT plan with the tracking IMRT plan, it was observed that the central axis dose difference was -0.87% and the absolute difference of both IMRT plans was 0.55%. Conclusions: The experimental results revealed that the treatment couch could be successfully used for real-time tumor tracking with a high level of accuracy. It was demonstrated that 4D tumor tracking was feasible using existing couch with implementation of appropriate tracking methodology and with modifications in the control system.

60 APPLIED LIFE SCIENCES↗

SU-F-J-121: Dosimetric Evaluation of Active Breathing Coordinator-Response Gating System Linked to Linear Accelerator in Volumetric Modulated Arc Therapy

Purpose: To reduce internal target volume (ITV), respiratory management is a must in imaging and treatment for lung, liver, and breast cancers. We investigated the dosimetric accuracy of VMAT treatment delivery with a Response™ gating system linked to linear accelerator. Methods: The Response™ gating module designed to directly control radiation beam by breath-holding with a ABC system (Elekta AB, Stockholm, Sweden) was tested for VMAT treatments. Seven VMAT plans including three conventional and four stereotactic body radiotherapy (SBRT) cases were evaluated. Each plan was composed of two or four arcs of 6MV radiation beam with prescribed dose ranged from 1.8 to 9 Gy per fraction. Each plan was delivered continuously without gating and delivered with multiple interruptions by the ResponseTM gating module with a 20 or 30 second breath-holding period. MapCheck2 and Gafchromic EBT3 films sandwiched in MapPHAN were used to measure the delivered dose with and without gating. Films were scanned on a flatbed color scanner, and red channel was extracted for film dosimetry. Gamma analysis was performed to analyze the dosimetrical accuracy of the radiation delivery with gating. Results: The measured doses with gating remarkably agree with the planned dose distributions in the results of gamma index passing rate (within 20% isodose; >98% for 3%/3mm and >92% for 2%/2mm in MapCheck2, and >91% for 3%/3mm criteria in EBT3 film except one case which was for large target and highly modulated). No significant difference (student t-test: p-value < 0.0005) was shown between the doses delivered with and without gating. There was no indication of radiation gap or overlapping during deliver interruption in film dosimetry. Conclusion: The Response™ gating system can be safely used during VMAT treatment. The accurate performance of the gating system linked to ABC can contribute to ITV reduction for SBRT using VMAT.

60 APPLIED LIFE SCIENCES↗

Real-time data-intensive computing

Today users visit synchrotrons as sources of understanding and discovery—not as sources of just light, and not as sources of data. To achieve this, the synchrotron facilities frequently provide not just light but often the entire end station and increasingly, advanced computational facilities that can reduce terabytes of data into a form that can reveal a new key insight. The Advanced Light Source (ALS) has partnered with high performance computing, fast networking, and applied mathematics groups to create a “super-facility”, giving users simultaneous access to the experimental, computational, and algorithmic resources to make this possible. This combination forms an efficient closed loop, where data—despite its high rate and volume—is transferred and processed immediately and automatically on appropriate computing resources, and results are extracted, visualized, and presented to users or to the experimental control system, both to provide immediate insight and to guide decisions about subsequent experiments during beamtime. We will describe our work at the ALS ptychography, scattering, micro-diffraction, and micro-tomography beamlines.

43 PARTICLE ACCELERATORS↗

Full Energy Injection and Top-up Operation at UVSOR-II

Top-up operation was successfully demonstrated at UVSOR-II, which will remove the short beam-lifetime problem caused by strong Touschek effect due to the small emittance, 27 nm-rad, and the low electron energy, 750 MeV. In these years, we have improved the accelerators, step by step, towards top-up operation. The radiation shielding wall was reconstructed. The energy of the booster synchrotron and the beam transport line were successfully upgraded from 600 MeV to 750 MeV, by replacing the magnet power supplies in 2006. Soon after, we succeeded in injecting the electron beam at the full energy. We improved the radiation safety system and constructed a injection control system. In autumn, 2008, we succeeded in operating the ring for 12 hours as keeping the beam current quasi-constant at 300 mA. Currently, we operated the ring in the top-up mode for 12 hours on every Thursday night, to check the effects on the users' experiments. In 2009, we have succeeded in the top-up operation in single bunch mode. Free electron laser oscillation with the top-up mode was also successfully demonstrated.

43 PARTICLE ACCELERATORS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Human-System Interface Style Guide for ACORN Digital Control System

The purpose of this style guide is to assist developers in designing effective and consistent-looking user interfaces for accelerator control rooms. A similar purpose is to help developers avoid the creation of user interfaces that needlessly stray from the accepted standard set forth in this document. This way, all interfaces combined will look congruous. This is especially beneficial for development that spans multiple years by many different contributors. This document is intended as a ready reference source for all user interface design for the Fermilab accelerator complex.

43 PARTICLE ACCELERATORS↗

Adaptive control of laser-wakefield accelerators driven by mid-IR laser pulses

There has been growing interest both in studying high intensity ultrafast laser plasma interactions with adaptive control systems as well as using long wavelength driver beams. We demonstrate the coherent control of the dynamics of laser-wakefield acceleration driven by ultrashort (~ 100 fs) mid-infrared (~ 3.9 μ m) laser pulses. The critical density at this wavelength is 7.3 × 10 19 cm -3 , which is achievable with an ordinary gas target system. Interactions between mid-infrared laser pulses and such near-critical-density plasma may be beneficial due to much higher absorption of laser energy. In addition, the normalized vector potential of the laser field a 0 increases with longer laser wavelength, lowering the required peak laser intensity to drive non-linear laser-wakefield acceleration. Here, MeV level, collimated electron beams with non-thermal, peaked energy spectra are generated. Optimization of electron beam qualities are realized through adaptive control of the laser wavefront. A genetic algorithm controlling a deformable mirror improves the electron total charge, energy spectra, beam pointing and stability at various plasma density profiles. Particle-in-cell simulations reveal that the optimal wavefront causes an earlier injection on the density up-ramp and thus higher energy gain as well as less filamentation during the interaction, which leads to the improvement in electron beam collimation and energy spectra.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Radiation Protection Aspects of the SPES Project at LNL

The SPES (Selective Production of Exotic Species) project will be built at the National Laboratories in Legnaro (Italy) of the National Institute of Nuclear Physics (INFN). Its goal will be the development of radioactive ion beams and the consequent re-acceleration with the existing linac to perform forefront research in nuclear physics. Radiation protection aspects are being considered at every stage of the project, e.g. civil construction planning, control system design and special technological plants. These aspects have been studied with the Monte Carlo transport code FLUKA and are presented in this paper.

43 PARTICLE ACCELERATORS↗

ICFA Beam Dynamics Newsletter

The Collider-Accelerator Department at Brookhaven National Laboratory is building a high-brightness 500 mA capable Energy Recovery Linac (ERL) as one of its main R&D thrusts towards eRHIC, the polarized electron - hadron collider as an upgrade of the operating RHIC facility. The ERL is in final assembly stages, with injection commisioning starting in October 2012. The objective of this ERL is to serve as a platform for R&D into high current ERL, in particular issues of halo generation and control, Higher-Order Mode (HOM) issues, coherent emissions for the beam and high-brightness, high-power beam generation and preservation. The R&D ERL features a superconducting laser-photocathode RF gun with a high quantum efficiency photoccathode served with a load-lock cathode delivery system, a highly damped 5-cell accelerating cavity, a highly flexible single-pass loop and a comprehensive system of beam instrumentation. In this ICFA Beam Dynamics Newsletter article we will describe the ERL in a degree of detail that is not usually found in regular publications. We will discuss the various systems of the ERL, following the electrons from the photocathode to the beam dump, cover the control system, machine protection etc and summarize with the status of the ERL systems.

43 PARTICLE ACCELERATORS↗

Experimental study for 15-20 mA dc H{sup -} multicusp source

Recently, a new H- source and test stand was developed at CIAE. The design of this new source is based on the experience on our previous 10-15 mA H{sup -} ion source and the source at TRIUMF. Major efforts include the study of the virtual filter magnetic field, confining magnetic field, filament shape and location, the vacuum improvement on the extracting area, the extraction optics, new control and interlock system of the power supplies. More than 15 mA of H-beam was obtained for 36 h with stability of {+-}0.5%. The normalized emittance of 0.48{pi} mm mrad (4 rms normalized emittance) were measured with {approx}8 mA dc beam. Further experimental studies are proceeding in an effort to reach 20 mA with reasonable emittance at this moment. More study plans are conducted, e.g., building a longer source body and using cesium injection to get better emittance, which will be presented as a separate paper at this conference.

43 PARTICLE ACCELERATORS↗

National Ignition Facility Control and Information System Operational Tools

The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

42 ENGINEERING↗

ESnet-JLab FPGA Accelerated Transport (control plane) [EJFAT (udplbd2)] v2.0

The ESnet-JLab FPGA Accelerated Transport system is a solution for streaming high-speed scientific measurement data from Data Acquisition Systems (DAQs) to high-performance computing facilties. It is generally compatible with many science workflows, and makes no assumptions about the specifics of any particular experiment. This program (udplbd version 2) implements the control plane for the system. It is responsible for programming network forwarding rules into the data plane (implemented by the hardware designed named udplb, described separately). It also implements the control loop necessary to match up offered workload with available capacity on high-performance compute nodes.

Howard, Derek [Lawrence Berkeley National Laborato↗

AI-Ready Semantic Infrastructure for CEBAF: From CED to PALS Knowledge Graphs

JLab and PNNL are jointly developing an AI-ready data ecosystem that exposes the Continuous Electron Beam Acceleration Facility’s (CEBAF’s) operational configuration, lattice description, and control-system channels to agentic optimization frameworks through a standards-based semantic layer. The effort integrates the existing facility-specific CEBAF Element Database (CED) with extensions of the emerging facility-agnostic Particle Accelerator Lattice Standard (PALS) to produce a knowledge graph (KG) containing coherent, machine-interpretable views of devices, signals, and regions. With this KG, CEBAF’s setpoints, readbacks, and device hierarchies become queryable using a uniform declarative graph query language (e.g., Neo4j Cypher), providing intents and inspectable semantics suitable for agentic control. The resulting graph-backed interfaces will allow autonomous agents to retrieve authoritative machine configurations, reason over device- and signal-level relationships, and execute tuning and diagnostic workflows without bespoke CEBAF-specific logic, thereby delivering a scalable pathway from operational data to trustworthy agentic accelerator tuning frameworks.

Zhang, He [Thomas Jefferson National Accelerator F↗

The National Ignition Facility Data Repository

NIF is the world's largest and most energetic laser experimental system, providing a scientific center to study inertial confinement fusion and matter at extreme energy densities and pressures. This presentation discusses the design, architecture, and implementation of the NIF Data Repository (NDR), which provides for the capture and long-term digital storage of peta-scale datasets produced by conducting experimental campaigns. The NDR is a federated database that provides for the capture of: experimental campaign plans, machine configuration & calibration data, raw experimental results and the processed results produced by scientific workflows. The NDR provides for metadata, pedigree, quality, effectivity, versioning and access control for each of the data categories. A critical capability of the NDR is its extensive data provisioning capabilities and protocols that enable scientists, local and remote alike, to review the results of analysis produced by the NDR's analysis pipeline or to download datasets for offline analysis. The NDR provides for the capture of these locally-produced analysis results to enable both peer review and follow-on automated analysis.

42 ENGINEERING↗

Lattice Commissioning Stretgy Simulation for the B Factory

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

43 PARTICLE ACCELERATORS↗

Multi-Speed Transmission For Commercial Delivery Medium Duty PEDVs

Successful completion of the proposed project will set a course for improving quality of life by overcoming key challenges in the gearbox for commercial-delivery, medium-duty, plug-in electric drive vehicles: It will reduce US dependency on foreign oil through the use of electric driven propulsion instead of fuel driven. It will reduce health risks by replacing tailpipe emissions in densely populated city centers. Finally, it will improve the performance-cost basis to meet or exceed the expectations of the targeted medium duty vehicle fleet owners and the independent customers. The proposed multi-speed transmission will narrow motor operation to the peak efficiency region, thereby increasing the electric powertrain efficiency to help close the range gap. Further, it will enhance customer satisfaction by improving vehicle acceleration, top speed and gradeability over the baseline. The project was conducted in three budget periods: In BP1: Technology Development, High-level vehicle powertrain models were used to optimize candidate transmission architectures and ratios along with a variety of traction motor characteristics for concept selection. The detailed driveline designs and component dynamics were investigated to meet medium-duty EV requirements; In BP2: Technology Development and Prototype Demonstration, The modeling and simulations with multi-speed transmissions were extended to other MD and HD EV platforms. Clean sheet design of a compact, lightweight, flexible, and modular, four-speed transmission was completed. Development of novel shifting and controls strategies were started and procurement of the prototype transmission and the controller hardware was begun; In BP3: Technology Integration, Testing, and Demonstration, Prototyping the four-speed automated mechanical transmission was completed. The transmission controls system and software development and preliminary gearbox dyno tests were done at Eaton. ORNL conducted integrated powertrain HIL tests. One of the prototype units was fully integrated into a Proterra BE35 demonstration electric bus. The shift control strategy was fine-tuned on the integrated vehicle at Eaton Marshall Proving Grounds. NREL tested the vehicle and validated the performance gains. Simulations predicted up to 20% increase in system energy efficiency depending on drive cycles, a top speed of greater than70 mph on flat road, 40% faster acceleration and a doubled gradeability with four-speed transmission as compared to the baseline EVs. Chassis Dyno Tests at NREL verified the simulation results of Eaton team and the HIL test results of ORNL team. The new four-speed EV transmission is efficient, reliable, modular, scalable, light weight, small size, and will be affordable. Furthermore, four-speed transmission enables downsizing of motor, battery and final drive, thereby reducing the total system cost.

33 ADVANCED PROPULSION SYSTEMS↗