Search NASA⌕ Search

SEARCH · Search NASA

Results for “Estimate at completion”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Thermal Cycling for Development of Hybrid Fuel for a Notional Mars Ascent Vehicle

A Mars Ascent Vehicle (MAV) would be a critical part of a potential Mars sample return campaign. As currently envisioned, the MAV would launch samples from Mars into Mars orbit. Challenging requirements would be placed on a MAV as it would need to be able to survive in the harsh Martian environment which can get as cold as -120°C in the winter. At these cold temperatures, survival heating could be necessary to keep the MAV within the allowable flight temperature range. Estimates for survival heating power show that a fuel capable of operating at low temperature would significantly reduce the total required energy of the MAV. This has led to consideration of a hybrid propulsion system due to its anticipated low temperature capability. A new wax-based fuel, SP7, has been developed for a notional MAV mission. Thermal modeling of the fuel in the Mars environment was completed in order to estimate the temperature response of the fuel during Mars diurnal temperature cycling. Preliminary thermal testing was conducted to determine the max temperature range, radial gradient, and ramp rate the fuel could tolerate without cracking. The modeling and preliminary testing was used to develop a comprehensive, 100-day thermal cycling campaign. A total of 200 cycles are planned that are representative of 200 Martian diurnal cycles, roughly one-third of a Martian year. After 150 cycles, the fuel samples show no signs of cracking that would jeopardize the rocket’s performance. Though not yet complete, this testing is showing that SP7 has the potential to successfully be used on a MAV mission.

Farias, Edgardo↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrow Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.

03 NATURAL GAS↗

Applying a predictive modeling methodology to a radiation transport inverse problem - 25588

In this paper, the predictive modeling of coupled multiphysics systems (PM-CMPS) procedure, developed by Cacuci and embodied in the software package MULTIPRED, has been applied to determine unknown parameters of a radioactive system from its gamma-ray and neutron signature. PM-CMPS has been integrated in two different ways with the inverse transport code INVERSE to determine the parameters. The first uses PM-CMPS in the inverse mode to directly estimate the parameters while the second mode uses a traditional nonlinear optimization routine and has PMCMPS complete a final iteration to estimate the uncertainty in the parameter best estimates. A test problem has been created and used to test both methods for varying numbers and types of responses and parameters. The first method was capable of accurately determining parameters but had a number of drawbacks. The second method functioned well at determining the correct parameter values in cases with limited numbers of parameters. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Refining Lucy Mission Delta-V During Spacecraft Design Using Trajectory Optimization Within High-Fidelity Monte Carlo Maneuver Analysis

Recent advances linking medium-fidelity trajectory optimization and high-fidelity trajectory propagation/maneuver design software with Monte Carlo maneuver analysis and parallel processing enabled realistic statistical delta-V estimation well before launch. Completing this high-confidence, refined statistical maneuver analysis early enabled release of excess delta-V margin for increased dry mass margin for the Lucy Jupiter Trojan flyby mission. By 3.3 years before launch, 16 of 34 TCMs had 1000 re-optimized trajectory design samples, yielding tens of m/s lower 99%-probability delta-V versus targeting maneuvers to one optimal trajectory. One year later, 1000 re-optimized samples of all deterministic maneuvers and subsequent flybys further lowered estimated delta-V.

Trojan↗

ENERGY STAR for Tenants: An Online Energy Estimation Tool for Commercial Office Building Tenants

The commercial building sector consumes over 18% of the total energy in the United States. According to the 2012 Commercial Building Energy Consumption Survey (CBECS), office buildings comprise nearly 16 billion square feet of floor space and consume 253 billion kWh of energy annually. Office buildings represent nearly one-fifth of the energy consumed by commercial buildings, more than any other building type. Therefore, monitoring and reducing energy consumption in office buildings has become an increasingly important focus across the United States. The goal of the ENERGY STAR for Tenants program is to recognize office building tenants who demonstrate commitment to energy efficiency and environmental stewardship. Tenants seeking recognition must complete five major steps: estimate energy use, meter energy use, use efficient lighting, use efficient equipment, and share data. NREL is responsible for the underlying analysis performed for step one, estimating energy use. An online survey was developed for tenants to input information about their office space and its internal loads. NREL performed a parametric analysis across a large parameter space of office buildings. The analysis results were processed to map the user inputs to output energy ranges. The mappings enable the web tool to provide users with instant energy usage estimates based on a limited number of inputs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The VST ATLAS quasar survey I: Catalogue of photometrically selected quasar candidates

We present the VST ATLAS Quasar Survey, consisting of ~1229 000 quasar (QSO) candidates with 16 < g < 22.5 over ~4700 deg 2 . The catalogue is based on VST ATLAS+NEOWISE imaging surveys and aims to reach a QSO sky density of 130 deg –2 for $z$ < 2.2 and ~30 deg –2 for $z$ > 2.2. To guide our selection, we use X-ray/UV/optical/MIR data in the extended William Herschel Deep Field (WHDF) where we find a g < 22.5 broad-line QSO density of 269 ± 67 deg –2 , roughly consistent with the expected ~196 deg –2 . We find that ~25 per cent of our QSOs are morphologically classed as optically extended. Overall, we find that in these deep data, MIR, UV, and X-ray selections are ~70–90 per cent complete while X-ray suffers less contamination than MIR and UV. MIR is however more sensitive than X-ray or UV to $z$ > 2.2 QSOs at g < 22.5 and the S X (0.5 – 10 keV) > 1 X 10 -14 ergs cm –2 s –1 limit of eROSITA. We adjust the selection criteria from our previous 2QDES pilot survey and prioritize VST ATLAS candidates that show both UV and MIR excess, also selecting candidates initially classified as extended. We test our selections using data from DESI (which will be released in DR1) and 2dF to estimate the efficiency and completeness, and we use ANNz2 to determine photometric redshifts. Applying over the ~4700 deg 2 ATLAS area gives us ~ 917 000 $z$ < 2.2 QSO candidates of which 472 000 are likely to be $z$ < 2.2 QSOs, implying a sky density of ~100 deg –2 , which our WHDF analysis suggests will rise to at least 130 deg –2 when eROSITA X-ray candidates are included. At $z$ > 2.2, we find ~310() 000 candidates, of which 169 000 are likely to be QSOs for a sky density of ~36 deg –2 .

79 ASTRONOMY AND ASTROPHYSICS↗

THE GHOSTS SURVEY. I. HUBBLE SPACE TELESCOPE ADVANCED CAMERA FOR SURVEYS DATA

We present an overview of the GHOSTS survey, the largest study to date of the resolved stellar populations in the outskirts of disk galaxies. The sample consists of 14 disk galaxies within 17 Mpc, whose outer disks and halos are imaged with the Hubble Space Telescope Advanced Camera for Surveys (ACS). In the first paper of this series, we describe the sample, explore the benefits of using resolved stellar populations, and discuss our ACS F606W and F814W photometry. We use artificial star tests to assess completeness and use overlapping regions to estimate photometric uncertainties. The median depth of the survey at 50% completeness is 2.7 mag below the tip of the red giant branch (TRGB). We comprehensively explore and parameterize contamination from unresolved background galaxies and foreground stars using archival fields of high-redshift ACS observations. Left uncorrected, these would account for 10{sup 0.65xF814W-19.0} detections per mag per arcsec{sup 2}. We therefore identify several selection criteria that typically remove 95% of the contaminants. Even with these culls, background galaxies are a significant limitation to the surface brightness detection limit which, for this survey, is typically V {approx} 30 mag arcsec{sup -2}. The resulting photometric catalogs are publicly available and contain some 3.1 million stars across 76 ACS fields, predominantly of low extinction. The uniform magnitudes of TRGB stars in these fields enable galaxy distance estimates with 2%-7% accuracy.

79 ASTRONOMY AND ASTROPHYSICS↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Parametric study of potential early commercial power plants Task 3-A MHD cost analysis

The development of costs for an MHD Power Plant and the comparison of these costs to a conventional coal fired power plant are reported. The program is divided into three activities: (1) code of accounts review; (2) MHD pulverized coal power plant cost comparison; (3) operating and maintenance cost estimates. The scope of each NASA code of account item was defined to assure that the recently completed Task 3 capital cost estimates are consistent with the code of account scope. Improvement confidence in MHD plant capital cost estimates by identifying comparability with conventional pulverized coal fired (PCF) power plant systems is undertaken. The basis for estimating the MHD plant operating and maintenance costs of electricity is verified.

Source record↗

Morphology of buried craters: Lava thickness estimates by simulated flooding

Partially and completely buried craters on planetary surfaces are used as probes to determine the thickness and extent of the overlying material as well as the composition of underlying terrain units. Rims of craters protruding through mare basalts on the Moon have been used extensively by DeHon (1977, 1979) to develop isopach maps of both the circular and irregular maria. Such estimates are possible because of Apollo topographic data and the extensive coverage by Lunar Orbiter photographs at various sun angles. On planetary surfaces without such data, however, shadow measurements can only be made by pixel listings with appropriate assumptions concerning support data. In addition, high resolution geochemical data is not available to determine whether the exposed crater rim is composed of material dissimilar from the lavas. Because of the need for lava thickness data, flooding of lunar mare and highland craters was simulated in order to determine empirical relationships between dimensions observed in orbital images and the thickness of the lava.

Maxwell, T. A.↗

Performance of internal covariance estimators for cosmic shear correlation functions

Data re-sampling methods such as the delete-one jackknife are a common tool for estimating the covariance of large scale structure probes. In this paper we investigate the concepts of internal covariance estimation in the context of cosmic shear two-point statistics. We demonstrate how to use log-normal simulations of the convergence field and the corresponding shear field to carry out realistic tests of internal covariance estimators and find that most estimators such as jackknife or sub-sample covariance can reach a satisfactory compromise between bias and variance of the estimated covariance. In a forecast for the complete, 5-year DES survey we show that internally estimated covariance matrices can provide a large fraction of the true uncertainties on cosmological parameters in a 2D cosmic shear analysis. The volume inside contours of constant likelihood in the $\Omega_m$-$\sigma_8$ plane as measured with internally estimated covariance matrices is on average $\gtrsim 85\%$ of the volume derived from the true covariance matrix. The uncertainty on the parameter combination $\Sigma_8 \sim \sigma_8 \Omega_m^{0.5}$ derived from internally estimated covariances is $\sim 90\%$ of the true uncertainty.

79 ASTRONOMY AND ASTROPHYSICS↗

RSMASS: A simple model for estimating reactor/shield masses

A comparison was completed of the reactor/shield masses obtained from detailed calculations by the proposers of space power reactors. This comparison included a variety of liquid metal cooled, gas cooled and thermionic reactors. An initial goal for agreement between RSMASS (reactor/shield mass model) calculated masses and the masses obtained from detailed calculations was chosen to be a factor of 2. The preliminary comparison demonstrated that the reactor/shield masses estimated by RSMASS agree with the masses obtained from detailed calculations within 50 percent. It can be concluded that RSMASS can provide good estimates of reactor/shield masses for a broad variety of reactor concepts proposed for MMW space power applications. RSMASS is being used to compare the masses of various reactor types and is providing some insights into the mass advantages and disadvantages for the various concepts as a function of operating conditions and reactor or shield parameters. Some mass estimates obtained with RSMASS are presented.

Marshall, Albert C.↗

Fine tuning GPS clock estimation in the MCS

With the completion of a 24 operational satellite constellation, GPS is fast approaching the critical milestone, Full Operational Capability (FOC). Although GPS is well capable of providing the timing accuracy and stability figures required by system specifications, the GPS community will continue to strive for further improvements in performance. The GPS Master Control Station (MCS) recently demonstrated that timing improvements are always composite Clock, and hence, Kalman Filter state estimation, providing a small improvement to user accuracy.

Hutsell, Steven T.↗

Determination of the structure and bond energies of NiO2 and CuO2

On the basis of extensive ab initio calculations, we estimate the metal-O2 binding energies of NiO2 and CuO2 to be 48 +/- 7 and 18 +/- 4 kcal/mol, respectively. We feel that the experimental estimate of 57 +/- 10 kcal/mol for the binding energy of NiO2 is slightly too large, while we are in complete agreement with the experimental estimate of 15 +10/-5 kcal/mol for CuO2. While the 1A1 ground state of NiO2 definitely has a side-on C(2v) structure, matrix isolation studies suggest that CuO2 has an end-on C(s) structure. Calculations at the coupled-cluster singles plus doubles level with a perturbational estimate of triple excitations, CCSD(T), produce a 2A2 state with C(2v) as a global minimum. However, the entire 2A-double prime ground-state surface is exceedingly flat, precluding a reliable determination of the gas-phase equilibrium structure.

Bauschlicher, Charles W., Jr.↗

An a posteriori residual-based spatial discretization error estimator for S N neutron transport

The “residual source estimator”, an implicit residual-based spatial discretization error estimator for S N neutron transport methods, is introduced. The estimator uses an approximation of the residual as a fixed source for an analogous transport problem whose solution is the error estimate, using the same transport operator as the original numerical solution. The complete derivation of the residual source estimator, the approximation of the residual, and higher-order derivatives is included. The performance of the residual source estimator for 0-order DGFEM is tested against reference solutions. For problems with true solutions discontinuous in the first derivative across the singular characteristics, the residual source estimator is generally accurate, precise, and computationally affordable compared to similar estimators. It suffers in problems where solutions are discontinuous, particularly when the discontinuity inflicts significant inaccuracies on the discrete solution; however, compared to other estimators, which suffer similarly, it remains a competitive option.

42 ENGINEERING↗

Time-resolved spray characterization via unified optical flow and binarization technique

This work leverages an unsupervised machine learning and advanced image processing techniques to characterize the breakup of fuel sprays in a small-scale combustor under reacting conditions, providing valuable insights into near-nozzle flow phenomenology. The proposed methodology integrates an improved optical flow model on a convolutional neural network to extract flow vectors with a binarization technique to assess droplets’ size and shape across the region of interest. The velocimetry approach demonstrates superior performance compared to a state-of-the-art optical flow model when applied to high-speed X-ray phase contrast spray images, achieving more accurate and reliable flow predictions. Moreover, breakup processes are quantified by breakup length and sphericity in accordance with velocity estimations, allowing a more complete characterization of the flow. This study establishes a robust methodology for analyzing spray morphology and primary breakup in compact combustors, contributing valuable means of understanding and optimizing fuel spray behavior in advanced combustion systems.

42 ENGINEERING↗