Search NASA⌕ Search

SEARCH · Search NASA

Results for “MANAGEMENT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distribution System Plan Template and Guide for Electric Utilities for Adaptation by States and Utilities [Slides]

LBNL researchers developed a template and companion guide for structuring distribution system plans. The template covers 10 key sections in utility distribution system plans and underlying topics: -Executive Summary -Planning Objectives -Current Distribution System -Planning Approach -Asst Management, Reliability and Resilience -O&M Expenses -Capacity Expansion Planning -Solution Identification -Cost-effectiveness -Implementation For each section in the template, the companion guide provides: a description of the topics covered and their importance; the type of content to include in the plan; an example utility approach; and references to other utility plans that serve as models for the topic.

24 POWER TRANSMISSION AND DISTRIBUTION↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Model Future Typical Meteorological (fTMY) Weather Files for nearly every US County

Exploring climate-induced impacts on building energy consumption can provide valuable insights for sustainable energy planning and environmental management in the face of a changing climate. By utilizing future weather data statistically downscaled from the Intergovernmental Panel on Climate Change (IPCC) General Circulation Models (GCMs) from 2020-2100, this paper presents a broadening industry-consensus approach for generating future Typical Meteorological Year (fTMY) weather files through a combination of statistical downscaling and high-performance computing that generalizes across decades, multiple locations for a region, and varying climate models. Furthermore, these fTMY files have been generated for 3,128 US counties for capturing potential weather on a 20-year basis.

Building↗

FY23 Status Report of the Activated Materials Laboratory at the Advanced Photon Source

The Activated Materials Laboratory (AML) is a new radiological facility located at the Advanced Photon Source (APS) in Argonne National Laboratory (ANL), adjacent to the high-energy x-ray microscopy (HEXM) beamline in the long beamline building (LBB) constructed under the APS-upgrade (APS-U) project. The AML is a centralized facility to facilitate the safe conduct of experiments on activated materials at the APS. This report provides an overview of the status of the AML as a Nuclear Science User Facilities (NSUF) partner user facility in preparation for the general user access in 2024 upon the commissioning of the APS-U beamlines. Specifically, details are provided regarding the laboratory's scope, functionality, components, operational blueprint, and data management approach. The plans on augmenting the instrumentation, refining operational procedures and developing a robust data management strategy for FY24 and beyond are also discussed.

43 PARTICLE ACCELERATORS↗

Farm Practice Typologies as a Strategy for Management-Relevant Land Use and Land Cover Mapping in the Great Lakes Region (Version 1) [Dataset]

Dataset overview and development This dataset provides spatially explicit agricultural land-use and land-management typologies developed for the Great Lakes Region (GLR) at the farm-parcel level. The typologies were designed to characterize not only the land-use and land-cover (LULC) associated with individual agricultural farm parcels, but also the land-management practices (LMPs), including irrigation, tile drainage, and conservation easements, occurring within those parcels and how these characteristics change through time. The dataset contains four related typology products: Annual integrated typology – describes the combined LULC and land-management characteristics for each farm parcel for individual years. LULC transition typology – describes the temporal pattern of LULC change for each farm parcel across the study period (2008-2023). LMP trend typology – describes the temporal pattern in the occurrence of LMPs for each farm parcel across the study period. Multi-year integrated typology – combines the LULC transition typology and LMP trend typology to provide an integrated characterization of long-term land-use and management patterns. Purpose of the dataset The purpose of these products is to provide a management-relevant integrated and consistent framework for evaluating the spatial and temporal organization of agricultural landscapes across the GLR. The resulting typologies can: support landscape-scale environmental and land-use analysis; provide spatial information relevant to land-management strategies, conservation planning, policy development, and program evaluation; characterize spatial patterns of agricultural land use and management; examine changes in agricultural landscapes through time; and identify persistent, transitional, and changing agricultural systems. Please refer to the README file provided in Files for more details.

Agriculture↗

PSIP For HDF5 Pilot Project (Final Report)

Productivity and Sustainability Improvement Planning (PSIP) is a lightweight, incremental and iterative approach (much in the same spirit as Agile methodologies) for making routine software process improvements in software projects. It is designed to be easily applied in existing development workflows. Quoting from a November 2019 workshop paper describing PSIP. PSIP breaks from classic software process improvement approaches such as CMM(I), SPICE, ISO 9000 or Six Sigma, in that it trades comprehensive standards and certification-driven assessment for self-defined, internally driven goals. It does, however, carry forward such ideas as having staged models of improvement (like CMM(I)) in the form of progress tracking cards. Additionally, PSIP is more aligned with lean and agile methods; it adopts their emphasis on iterative improvement and continuous learning. At its core, PSIP is an instantiation of the Plan-Do-Check-Act management cycle (PDCA, also known as Plan-Do-Study-Adjust) which provides the foundation for much of the modern software process improvement literature. This situates PSIP within a constellation of bottom-up, inductive software process improvement methods. PSIP is designed around the notion that already overburdened teams can define and carry out a series of small, incremental steps of progression towards improvement goals without significant (there will be some, but the goal is to avoid significant) disruption to ongoing development activities. A key enabling tool in PSIP is the use of Progress Tracking Cards (PTCs) which define the steps of progression towards a given improvement goal. This is the theory of PSIP. The PSIP for HDF5 project was aimed at putting PSIP into practice with the purpose of evaluating its effectiveness in planning and facilitating quality and process improvements in a scientific software project as well as its associated artifacts. The HDF5 project was chosen as a use case to evaluate PSIP for several reasons. First, NNSA labs and LLNL in particular have a keen interest in how HDF5 quality impacts its uptake and sustainability as a community adopted and supported code. Next, HDF5 is a foundational library, a key substrate in the HPC/CSE software stack, and any improvements there realized through this contract will have benefits to many DOE applications depending on it. HDF5 also represents an older, legacy code with technical debts to pay down. These characteristics are similar to many NNSA and even some ECP code projects. But, because HDF5 is an I/O library, it represents a simpler use case within which to study PSIP than a full-fledged and significantly more complex PDE simulation code. We believe these attributes make HDF5 an ideal use case for evaluating PSIP.

97 MATHEMATICS AND COMPUTING↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Municipal Fleet Action Plan Guide

This action plan template and guide have been designed to support light-duty or medium-duty municipal fleet managers as they plan to adopt electric vehicles. The resource is an adaptation of content created by the National Laboratory of the Rockies (NLR), with support from World Resources Institute (WRI), for participants in the U.S. Department of Energy's Energy to Communities peer-learning cohort, Charting a Path to Municipal Fleet Electrification. Fifteen participating municipalities joined monthly cohort workshops from July through December 2024 to learn and plan for their own fleet electrification. Clean Cities and Communities coalitions supported participating municipalities throughout the cohort series by conducting fleet analysis and planning activities on their behalf. This template is an adapted version of cohort activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES↗

Are better combinations of DERs more profitable?: Combinatorial optimization for aggregation of DERs in wholesale electricity markets

Recently, regulatory changes in various countries have enabled the participation of small-scale distributed energy resources (DERs) aggregated in virtual power plants (VPPs) in wholesale electricity markets. The inherent uncertainty and variability of resources comprising VPPs can lead to imbalances between forecasted and metered outputs, potentially resulting in the deficient settlement of generation under imbalance settlement rules. To address this challenge, it is essential to manage variability in the planning phase and uncertainty in the operation phase. Most current research focuses on managing forecasting errors in the operational phase, with insufficient attention given to the planning phase. Here, to bridge this gap, this paper proposes an optimal combination strategy for DERs to maximize the market participation revenue of VPPs by proactively managing variability in the planning phase. To estimate the expected revenue, we conducted analyses for homogeneous and heterogeneous DERs using Monte Carlo simulations and genetic algorithms. Remarkably, the proposed method demonstrated approximately 8 % higher revenue compared to the neighboring group case when considering diversity in DER set configuration with equal proportions of photovoltaics and wind.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16; Addendum Part I for Delineating BH-056

On July 11, 2022, Sandia National Laboratories in California (SNL/CA) submitted a Response to Regional Water Quality Control Board Comments on Soil Sampling Results for Closure of a Portion of SWMU #16 in response to the February 16,2022 San Francisco Bay Regional Water Quality Control Board’s (SFRWQCB) letter requesting supporting information for the recommended closure of 7,700 linear feet of abandoned sewer lines. On August 18, 2022, SFRWQCB further requested a Sampling and Analysis Plan (SAP) for additional “step-out” sampling to delineate the potential presence of benzidine near borehole BH-056, which is located near the former sewer line. SNL/CA is in the process of contracting Weiss Associates (Weiss) to perform and oversee the boring, sampling, analysis, and report development to determine the potential presence and extent of benzidine. This document outlines the work that is anticipated, including the development of the SAP, to complete the investigation and submit a final report to the SFRWQCB. The work proposed by Weiss provides an estimated schedule for completing the investigation and developing the addendum Part II SAP for the project. In addition, Weiss provided a preliminary estimate of the sample locations (see Attachment A) which serve as addendum Part I of the SAP requested by the SFRWQCB. The contractor will submit the addendum Part II SAP, to satisfy the SFRWQCB requirement, before proceeding with any work.

54 ENVIRONMENTAL SCIENCES↗

LLNL ES&H Analytical Services and Instrumentation Analytical Laboratory (ALAB) (CY2022 Management Review Report)

"An annual review shall be conducted of the analytical activities to ensure continuing suitability, adequacy, and effectiveness." (ALAB-01 Rev 6 ALQAP section 6.11.2) "The laboratory management shall review its management system at planned intervals, in order to ensure its continuing suitability, adequacy and effectiveness..."(ISO/IEC 17025:2017 Section 8.9.1) "In accordance with a predetermined schedule and procedure, the laboratory's top management shall periodically conduct a review of the laboratory's management system and testing and/or calibration activities to ensure their continuing suitability and effectiveness, and to introduce necessary changes or improvements. "(TNI Standard EL-V1M2-2016-Rev2.1:Quality Systems General Requirements)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗

Community Energy Planning: Best Practices and Lessons Learned in NREL's Work with Communities

Whether driven by local goals and actions, external market forces, or both, the clean energy transition is accelerating. The associated increase in clean energy deployment occurs on the ground in communities. As a result, communities increasingly need technical expertise and assistance in planning for and managing the energy transition. Building on decades of work with state, local, and tribal jurisdictions, NREL's work providing modeling, analysis, and technical expertise to enable more data-driven community energy planning is expanding. To inform and enhance NREL's capabilities in community energy planning and provide a resource for others working in this space, NREL developed this best-practices document through interviews with seasoned NREL practitioners and a review of the literature on equitable community planning. Findings include five best practices for community energy planning that NREL practitioners can apply to increase the impact of their work.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution System Planning for Growth in Residential Electric Vehicle Adoption

Anticipated growth in Electric Vehicles (EV) adoption could stress distribution system circuits beyond their original design limits. Uncertainties related to when households will begin buying EVs in large numbers challenges existing distribution system planning approaches and complicates efforts to assess grid impacts. Anticipated location, timing, and demand for EV charging is critical information for distribution system planners as it guides investment strategies for infrastructure upgrades to ensure continued reliability. This research makes two significant contributions: an EV adoption model that uses socioeconomic data to forecast location and year-specific adoption patterns through a bottoms-up approach, and an EV hosting capacity assessment methodology that offers improvements to current utility planning and asset management practices for infrastructure investments. Both contributions are applied to a Southern California Edison feeder in 7 adoption years from 2025 to 2050, with the results indicating that they are likely valuable additions to distribution systems planning capabilities.

Sridhar, Siddharth↗