Search NASASearch

SEARCH · Search NASA

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

695 records · Page 16

Glenn Research Center Propulsion Systems Laboratory 2026 Customer Guide

This guide describes the Propulsion Systems Laboratory (PSL) at the NASA Glenn Research Center. It was written to help customers understand the various components involved in conducting a test program within the PSL. The PSL complex supports two large-engine test cells that simulate altitude flight conditions for a wide range of research and experimental tests. These test cells operate at altitudes up to 90,000 ft and speeds from subsonic to above supersonic. Test points such as pressure, temperature, and Mach number can be set at the engine or test article inlet based on customer requirements. The facility’s support systems include the heated and cooled combustion air systems; altitude exhaust system; hydraulic system; nitrogen, oxygen, and hydrogen systems; thrust measurement system, which includes the facility’s single- and multi-axis thrust stands; inlet system; and electrical systems. In addition to providing a detailed description of PSL systems and capabilities, this guide discusses the facility’s history and past tests and addresses facility safety procedures, pretest requirements, and test operation standards.

Engine Icing Test Facility

Utility Experience with Inverter Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. It includes a broad review of all challenges that system protection has experienced so far with high penetration of IBRs. Key issues have been identified based on a survey of different utility protection engineers. Finally, fault event recordings are shown to demonstrate some actual cases of mis-operations of relays near IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION

Optimization of the FRIB beam dump: a hybrid genetic algorithm and reinforcement learning approach

The operational envelope of high-power-density systems, such as particle accelerators and advanced nuclear energy systems, is critically constrained by the need to manage extreme thermal loads. To address this, we present a novel hybrid optimization framework combining a genetic algorithm (GA) with a soft actor-critic (SAC) deep reinforcement learning agent. This framework was applied to a practical high-heat-flux problem: redesigning the beam dump at the Facility for Rare Isotope Beams (FRIB) for a power upgrade from 20 kW to 50 kW. The resulting design, validated by three-dimensional conjugate heat transfer simulations, suppresses hazardous hot spots and yields a markedly more uniform temperature distribution. This provides a robust operating margin, increasing the average power-handling capability by 72% relative to the current design, demonstrating the framework’s potential to solve complex thermal management challenges in both accelerator technology and advanced nuclear systems.

Accelerator

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Advanced LiFSI-LiPF6 Electrolyte for Wide-Temperature and Thermally Stable Lithium-Ion Batteries

A new optimized LiFSI–LiPF6 dual-salt controlled-solvation electrolyte (E-DS) is demonstrated to enable practical graphite||LiNi0.8Mn0.1Co0.1O2 cells (˜4.0 mAh cm?²) to achieve exceptional performance and safety under extreme conditions. By optimizing anion coordination with the smaller, more dissociating FSI? anion, the E-DS forms ultrathin, dense, and inorganic-rich electrode/electrolyte interphases that dramatically suppress solvent decomposition, transition-metal dissolution, and surface reconstruction compared to the conventional LiPF6/carbonate electrolyte. Consequently, E-DS cells deliver >78% capacity retention after 300 cycles at 60 °C, retain fast discharging capacity at 30 °C, and operate effectively at -20 °C. Most strikingly, fully charged full cells with E-DS, even under overcharging to 4.8 V, show a lower heat evolution in stable formulations — transforming a traditionally unstable high-voltage/high-temperature configuration into an intrinsically safe state. This work establishes a new benchmark for carbonate-containing electrolytes, simultaneously achieving high energy density, fast-discharging capability, wide-temperature operation (-20 to 60 °C), and outstanding thermal safety in nickel-rich lithium-ion batteries.

electrode/electrolyte interphase

Final Report Document: Microgravity Medical Eyewash B

Senior Capstone Design Team 15 has been commissioned by the National Aeronautics and Space Administration (NASA) to redesign the current microgravity eye wash station. The current design exhibits four primary limitations: single-use operation, excessive mass and volume, operational complexity requiring coordination with external systems, and dependence on frequent Earth resupply missions. Our updated eyewash design will be deployed on long-range space missions that could last multiple years. Based on these and other requirements from our customer, we have developed our updated eyewash design. Our compact, single-eye system uses capillary-driven flow and a free-floating water ball. This design allows us to eliminate pumps and bulky tubing, decreasing the mass and volume of the overall system. The containment eyecup is held to the astronaut's face with a strap, and a silicone seal prevents leakage while improving user comfort. Contaminated water is contained within a disposal bag containing wicking material to pull it back out of the eyecup after washing the eye. This system is reusable, efficient, and easy to activate quickly. We evaluated our design through calculations, microfluidic testing, and user try-on testing to verify our requirements. Our work demonstrated that steady-state flow was capable with our capillary framework, achieving 1.31 L/min. The prototype construction confirmed mass and volume reductions, and try-on-testing evaluated the ability to put on the system quickly. Almost all major design requirements were achieved, and water loss could be validated by testing in microgravity. Our design went through a number of iterations to reach the final solution presented in this report. These changes were driven by our testing and collaboration from each member of the team. Updated models optimized tube placement and geometry of the eyecup to better direct flow as it pools across the eye. Changes to our tubing bends improved capillary efficiency and increased the flow rate we were capable of achieving. And improved bracket placements adjusted the fit, comfort, and seal of the eyecup to the astronaut's face. Our capillary-based eyewash system is technically feasible and has been theoretically validated to operate effectively in microgravity conditions. Testing and analysis indicate that it can meet or exceed the required performance metrics, including flow rate and safety constraints. Overall, the design represents a viable alternative to current ISS-dependent eyewash systems for future space missions.

Jeffrey Allen

Nickel-hydrogen battery state of charge during low rate trickle charging

The NASA AXAF-I program requires high battery state of charge at launch. Traditional approaches to providing high state of charge, during prelaunch operations, require significant battery cooling. The use of active cooling, in the AXAF-I prelaunch environment, was considered and proved to be difficult to implement and very expensive. Accordingly alternate approaches were considered. An approach utilizing adiabatic charging and low rate trickle charge, was investigated and proved successful.

Lurie, C.

NASA aerospace battery system program initiation

Preflight and flight battery system problems in flight programs at NASA created high-level concern and interest in the current battery technology status. As a result, NASA conducted an in-house review of problems experienced both internally and by other government users. The derived issues which encompassed the programmatic scope from cell manufacturing to in-flight operations of the system are discussed. From the identified deficiencies, a modestly scaled battery program was established to alleviate or minimize the risks of future occurrences.

Schulze, Norman R.

Polynomial-time preparation of low-temperature Gibbs states for two-dimensional toric code

In this work, we propose a polynomial-time algorithm for preparing the Gibbs state of the two-dimensional toric code Hamiltonian at any temperature, starting from any initial state, significantly improving upon prior estimates that suggested exponential scaling with inverse temperature. We prove that fast mixing at low temperature for the two-dimensional toric code can be achieved by augmenting local jump operators with simple global jump operators, which enable efficient transitions between logical sectors. To establish tight lower bounds on the spectral gap, we introduce a new reduction method that eventually maps the problem to estimating the spectral gap of a perturbed graph Laplacian on a stair graph. Our proof also shows that the Lindblad dynamics with a digitally implemented low-temperature local Davies generator is able to efficiently drive the quantum state toward the ground state manifold.

97 MATHEMATICS AND COMPUTING

GOES-R Lithium-Ion Battery Life Test & Workhorse Battery Performance

The GOES R series lithium-ion battery life test results are presented for the next-generation GOES R series weather satellites. Lockheed Martin is under contract to NASA Goddard to build and deliver four GOES-R series satellites which are operated by NOAA. In addition, Lockheed Martin is required to build a GOES R series flight battery to flight drawings and processes and perform an accelerated geosynchronous earth-orbiting (GEO) life test consisting of 30 real-time eclipse seasons and 30 accelerated solstice seasons. The GOES R series batteries are designed and built by Saft America, Inc. Space and Defense Division in Cockeysville, MD with Saft VL48E cells. The GOES R series life test battery which has been built to flight drawings and processes has undergone 21 seasons of accelerated GEO testing (which is equivalent to over 10 years on-orbit). This presentation includes a description of the life test and latest test results through season 20. The life test battery capacity measurements prior to cycling and after seasons 4, 10, and 20 which have shown little or no change are summarized. In addition, the performance of the GOES R series workhorse batteries performance are presented. These GOES R series workhorse batteries are used during spacecraft testing and have shown no discernable capacity loss after 7 years of mostly ambient operation and cold storage since activation. An overview of the electrical power subsystem and battery charge is, also, addressed.

Tucker, Jon

Future Aerospace Technology in the Service of the Alliance: Sustained Hypersonic Flight - Volume 3

Sustained Hypersonic Flight capability is envisioned for several future military and civilian applications, such as long range immediate reaction reconnaissance, high speed interception of air targets, long range precision strike against hardened or time critical targets, and access to space. The inherent reduction in time-to-target and low vulnerability will permit new operational tactics. The symposium outlined mission needs and operational scenarios for hypersonic vehicles. Addressed were: Technological issues and challenges in external hypersonic aerodynamics and design, propulsion and engine/airframe integration, military ramjet applications, overall system design including structures and materials development needs, and test facilities. Ground based test facilities cannot provide full simulation at Mach numbers above 5. Therefore, the use of Computational Fluid Dynamics design tools is essential. For routine use of the computational tools in analysis, design and optimization, it is necessary to reduce the time for the entire computational process by two orders of magnitude. Hypersonic boundary layer transition remains a critical design issue because of the important impact on engine drag and on heating, which can affect the choice of materials and thermal protection systems. In addition, reliable prediction of scramjet net thrust is an absolute must in resolving hypersonic air breathing vehicle design issues. Due to current facility and computational shortfalls, the development of future hypersonic flight systems requires research flight tests in the technology areas of boundary layer transition and air-breathing propulsion engine performance. For sustained hypersonic flight beyond Mach 6, the supersonic combustion ramjet (scramjet) engine is the only choice for the near future. Only this air-breathing concept offers a significant promise of large reductions in required propellant fractions, increased payload fractions, and reduced size vehicles, together with a foreseeable technological feasibility. Airframe/engine integration, combustor design and thermal management are the predominant engineering tasks. Fuels, hydrogen or hydrocarbon, must be matched to the operational needs of military or civil use. Experience in existing ramjet propelled missiles capable of speeds up to Mach 4 can support the development effort. The potential mission and cost benefits of sustained hypersonic flight to both military and civil applications are tremendous. From the budget point of view, the possibility of sharing development costs between military and civil programs offers a specific advantage.

Combustion chambers

Geosynchronous Performance of a Lithium-titanium Disulfide Battery

An ambient temperature rechargeable Lithium-Titanium disulfide (Li-TiS2) five cell battery has completed the first orbital year of accelerated synchronous orbit testing. A novel charge/discharge, state of charge (SOC) control scheme is utilized, together with taper current charge backup to overcome deleterious effects associated with high end of charge and low end of discharge voltages. It is indicated that 10 orbital years of simulated synchronous operation may be achieved. Preliminary findings associated with cell matching and battery performance are identified.

Otzinger, B.

Selecting an Encapsulant for an Aerospace Superconducting Machine

Achieving larger benefits from electrified propulsion in single aisle aircraft (the largest commercial aircraft market segment) necessitates that a significant fraction of their 20 MW or greater propulsion system be electrified. These aircraft would require up to 10-20 of today’s state-of-the art machines, which have been demonstrated up to 2.5 MW for aerospace use, and could benefit further from 5 MW+ designs. However, when conventionally cooled, high power density machines still produce a significant amount of waste heat, translating into heavy thermal management and detracting from system benefits. Highly efficient fully superconducting electric machines (or those with a cryogenically cooled, high purity copper or aluminum stator) are a possible solution but have multiple barriers to overcome. One such barrier is the durability of superconducting windings. Superconductors are typically brittle, and encapsulants used to hold windings in place are a significant source of stress due to mismatches in coefficient of thermally induced contraction between ambient and operational temperatures (20 to 77 K). Lack of compliance between the materials at operational temperatures also adds significant stress. These encapsulants also form a thermal barrier that can be detrimental to cooling the superconductors. This work describes an initial study of commercially available encapsulants as it relates to superconducting machine applications, along with initial modeling of thermal stress in superconducting windings for a superconducting or cryogenically cooled stator in a 5 MW electric machine.

encapsulant

Update of the IUE battery in-flight performance

The in-flight performance data of two 17-cell, 6-ampere-hour nickel cadmium spacecraft batteries are presented covering 22 months of operation. Fluctuations in the battery voltage and the battery temperature are presented for spacecraft movement throughout a beta range of 0 to 130 deg. The battery discharge voltages during the peak eclipse seasons, daily seasons, and daily eclipse periods are noted. Finally, the spacecraft data are compared to data from a 6-ampere-hour test pack and test flight data.

Tiller, S. E.

Correlating Impacts of Injected Fuels on Carbon Emissions in Blast Furnace with Computational Fluid Dynamics Modeling

A major challenge for steelmaking is the reduction of CO 2 emissions. In this regard, the blast furnace (BF) is critical due to the high associated CO 2 levels. This investigation assesses the impact of tuyere‐injected fuels on BF CO 2 emissions. Specifically, computational fluid dynamics results obtained previously at Purdue University Northwest are analyzed to obtain CO 2 emissions when natural gas (NG), syngas, hydrogen, or hydrogen/NG are injected. CO 2 emissions are compared with those produced when 95 kg of NG/thm is injected. Among these scenarios, the largest CO 2 reduction occurs when 102 kg of syngas/thm (COG feedstock #1) is injected at 973 K, reducing CO 2 by 190.6 kg thm −1 . The largest CO 2 reduction obtained with NG occurs when 130 kg thm −1 is injected at 600 K, reducing emissions by 65 kg thm −1 . H 2 injection also reduces CO 2 , but requires careful adjusting to reach stable operation. For instance, injecting 35 kg of H 2 /thm reduces CO 2 by 52 kg thm −1 . Increasing gaseous injection rates can significantly reduce CO 2 emissions, with fuel preheating providing an addendum, but high injection rates can lead to unstable operation. Furthermore, results show a correlation between CO 2 emissions and average temperature of shaft region for multiple fuels and injection conditions.

Metallurgy & Metallurgical Engineering

Challenge of Fielding Experiments at the Annular Core Research Reactor

Conference is the annual Test, Research &Training Reactors (TRTR) meeting. Typically attended by dozens of research reactor operators, educators, trainers, maintenance & service contractors Also, members of the Nuclear Regulatory Commission (NRC) attend. Presentation highlights ACRRs capability and the process used to submit and approve experimental activities. This presentation is adapted from my previous presentation to the Material Test and Research conference, SAND2025-1775526.

Martin, Lonnie E. [Sandia National Laboratories (S