Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

A simulation of the Fermilab Main Injector dual power amplifier cavities

The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs.

Stevenson, Susanna [Fermilab] (ORCID:0009000891261↗

MADWEC Techno-Economic Analysis: Cooperative Research and Development Final Report

The objective of this project was for the facility to conduct a techno-economic assessment of the Maximal Asymmetric Drag Wave Energy Converter (MADWEC), developed by the University of Massachusetts Dartmouth (UMass Dartmouth), used for powering remote monitoring and AUV charging systems compared to other existing power supply options. The assessment estimates capital expenditures (CapEx), operational expenditures (OpEx), and power performance for 18 scenarios with the purpose of identifying key cost drivers, comparing total system cost, and comparing the power performance of the power supply options in terms of required installed capacity and estimated theoretical annual energy performance. The scenarios include two end-uses: (1) AUV charging and (2) offshore remote monitoring); three power sources: (1) MADWEC), (2) photovoltaic (PV) solar buoy, (3) and traditional battery swapping); and three locations; (1) nearshore, (2) far-offshore, and (3) high-latitude). In addition, other project goals included developing high level installation, operation, and maintenance plans for each scenario.

16 TIDAL AND WAVE POWER↗

A Simulation of the Fermilab Main Injector Cavities

The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs

Stevenson, Susanna M. [Fermilab] (ORCID:0009000891↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Technical Assistance for the Makah Tribe, Washington

The Energy Technology Innovation Partnership Project (ETIPP) worked with the Makah Tribe on strategic energy planning, including scoping future energy needs of relocated facilities, understanding the potential for new energy generation options to support current and future energy demand, and supporting communication and capacity-building goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Urban Services: Program Impact and Business Plan Summary

The Integrated Urban Services (IUS) program, launched in 2021 and funded by the U.S. State Department under the United States-Association of Southeast Asian Nations (US-ASEAN) Smart Cities Partnership, aimed to bolster resilience in ASEAN cities by addressing challenges across food, energy, and water systems. Led by the National Renewable Energy Lab (NREL) with support from Regenerative Impact Ventures, the program focused on demonstrating the socio-economic benefits of integrated urban planning, educating stakeholders on circular economy principles, providing technical assistance to two ASEAN cities, and attracting private sector involvement. The program facilitated peer learning events, engaging public and private sector participants and leveraging knowledge from a group of global experts to inform approaches and best practices. Technical assistance was provided to two pilot cities, Iskandar Malaysia and Cagayan de Oro, Philippines, resulting in the development of market-driven business plans for resilient, circular, and regenerative energy-water-food system projects. The Iskandar Malaysia pilot focused on development of a state-of-the-art AgriTech Innovation Hub and Modern Farming Complex to enhance agricultural productivity and produce enough renewable energy to power the facilities. The Cagayan de Oro project aimed to enhance urban agricultural productivity and waste management through development of an Urban Precision Agricultural Complex featuring aeroponics, hydroponics, aquaponics, agrivoltaics, and a Black Solider Fly Facility for converting municipal solid waste into commodities. The success of the IUS program sets a precedent for replicating integrated urban service models globally, offering valuable insights for cities aiming to enhance their resilience and sustainability.

ASEAN↗

Resilience Valuation and Planning for Solar and Storage on Critical Infrastructure

This case study report documents the City's project evolution and the entrepreneurial ways through which the City approached the questions of how solar and storage could support their resilience efforts and how to value and pay for solar-plus-storage systems. This report documents how and why the City of Reno came to the specific conclusion to integrate solar and storage into their Public Safety Center retrofit project and apply for Federal Emergency Management Agency (FEMA) Building Resilient Infrastructure and Communities (BRIC) funding. (The City of Reno applied for and was awarded FEMA BRIC funding in January 2021; leveraging work that was underway in this project.) This report provides an overview for other local governments to draw inspiration from when considering how to prioritize community values and pursue multi-stakeholder dialogue around resilient energy solutions. The City of Reno's experience can serve as a starting point for other communities interested in valuing the resilience benefits of solar and storage.

14 SOLAR ENERGY↗

Leveraging NREL's ResStock & ComStock Dataset to Evaluate Building Stock Electrification: Preprint

Residential and commercial buildings accounted for 40% of U.S. energy consumption in 2022 and represent a significant opportunity for decarbonization through energy efficiency and electrification, and for grid planning. Building stock energy modeling is a powerful tool that can evaluate what-if scenarios as utilities, municipalities, policymakers, building owners and others work towards equitable building decarbonization and climate goals. This presentation will highlight several high-impact use cases of the National Renewable Energy Laboratory (NREL)'s highly granular, bottom-up building stock energy modeling tools, ResStock and ComStock. These use cases cover a wide range of project scale, from neighborhood electrification analysis and municipality long-term energy planning, to state energy code development and national policy evaluation. This presentation will showcase specific real-world applications for which ResStock and ComStock have been utilized across the country, including California codes and standards cost-effectiveness analysis, New York City affordable housing electrification cost gap analysis, and California targeted electrification and gas decommissioning analysis. For each use case, this presentation will illustrate how ResStock and ComStock played a crucial role in accurately characterizing regional building stocks, providing discrete and aggregated end-use load shapes, and calculating lifecycle consumption, emissions, and costs for a variety of building electrification strategies and scenarios. Finally, this presentation will demonstrate how the data provided by ResStock and ComStock can help unlock significant outcomes for these use cases, including but not limited to, customer bill impact, incentive and program design, and energy equity analyses.

building stock modeling↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Energy Technology Innovation Partnership Project

The U.S. Department of Energy's (DOE) Energy Technology Innovation Partnership Project (ETIPP) helps coastal, remote, and island communities increase the affordability, reliability, and security of their energy systems through energy planning and deep-dive technical assistance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Innovation Partnership Project (Bilingual)

The U.S. Department of Energy's (DOE) Energy Technology Innovation Partnership Project (ETIPP) helps coastal, remote, and island communities increase the affordability, reliability, and security of their energy systems through energy planning and deep-dive technical assistance. This is a English and Spanish translation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Roughrider Carbon Storage Hub (Final Report)

The Roughrider Carbon Storage Hub was a 2-year project (October 2023 – September 2025) conducted by the Energy & Environmental Research Center (EERC) focused on advancing the feasibility of a commercial-scale carbon dioxide (CO 2 ) geologic storage hub in McKenzie County, North Dakota. The project’s objective was to investigate the potential that stacked storage complexes (multiple deep saline formations) can safely and economically store at least 50 million tonnes of CO 2 within 30 years. The captured CO 2 would be sourced from industrial emitters including project partner ONEOK, Inc.’s gas-processing plants and a planned gas-to-liquids facility. Drilling of the Roughrider 1 stratigraphic test well (14,979-ft total depth) was completed in November 2024. The wellbore intersected four candidate storage formations: Inyan Kara, Broom Creek, Mission Canyon, and Black Island–Deadwood. Operational challenges, including a stuck drill string, were resolved without long-term impact. A comprehensive logging and coring program was conducted, followed by successful well abandonment and site reclamation. Over 660 ft of 4-in. whole core was retrieved. Core plug samples were processed and analyzed for petrophysical and geochemical properties. Results confirmed promising porosity and permeability in the Inyan Kara and Broom Creek Formations and removal of the Mission Canyon and Black Island–Deadwood horizons from further investigation. Data derived from the logging and coring program were used to improve initial geologic models built from legacy data. CO 2 injection simulations showed that the Inyan Kara alone can feasibly store the target mass of CO 2 . Because of subtle differences in geologic structure and porosity trends between the formations, a stacked storage scenario using the Broom Creek and Inyan Kara Formations resulted in a larger overall plume area than using the Inyan Kara alone. Preliminary CO 2 pipeline routes from the industrial sources were mapped utilizing existing rights of way and evaluated for capacity and cost using U.S. Department of Energy Office of Fossil Energy and Carbon Management/National Energy Technology Laboratory models and U.S. Environmental Protection Agency emissions data. Integrating capture, transport, and storage cost estimates with policy incentives (e.g., 45Q credits) provided a total cost-per-ton analysis. Results indicate that the small scale of the volumes to be transported over the cumulative large distances does not support the project’s financial viability. However, the groundwork laid during this project from geological, regulatory, and social perspectives positions the Roughrider hub site as a promising candidate for commercial carbon storage in North Dakota, especially if the economy of scale is introduced for CO 2 transportation to the hub site.

01 COAL, LIGNITE, AND PEAT↗

NREL in Alaska [Slides]

This publication provides an overview of NREL's active projects in Alaska.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sustainability Criteria for Hydrogen Deployments

This presentation is an update of progress to date on the work done on developing sustainability metrics for hydrogen projects. Here we outline the motivation and objective for the work as well as the process we use to derive a sustainability framework and metrics to be considered when evaluating the sustainability of a hydrogen infrastructure project.

DEIA↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

Storm surges and extreme sea levels: Review, establishment of model intercomparison and coordination of surge climate projection efforts (SurgeMIP).

Coastal flood damage is primarily the result of extreme sea levels. Climate change is expected to drive an increase in these extremes. While proper estimation of changes in storm surges is essential to estimate changes in extreme sea levels, there remains low confidence in future trends of surge contribution to extreme sea levels. Alerting local populations of imminent extreme sea levels is also critical to protecting coastal populations. Both predicting and projecting extreme sea levels require reliable numerical prediction systems. The SurgeMIP (surge model intercomparison) community has been established to tackle such challenges. Efforts to intercompare storm surge prediction systems and coordinate the community 's prediction and projection efforts are introduced. An overview of past and recent advances in storm surge science such as physical processes to consider and the recent development of global forecasting systems are briefly introduced. Selected historical events and drivers behind fast increasing service and knowledge requirements for emergency response to adaptation considerations are also discussed. The community 's initial plans and recent progress are introduced. These include the establishment of an intercomparison project, the identification of research and development gaps, and the introduction of efforts to coordinate projections that span multiple climate scenarios.

54 ENVIRONMENTAL SCIENCES↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗