Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

OctoFAS: A Two-Level Fair Scheduler That Increases Fairness in Network-Based Key-Value Storage

We identified a fairness problem in a network-based key-value storage system using Intel Storage Performance Development Kit (SPDK) in a multitenant environment. In such an environment, each tenant’s I/O service rate is not fairly guaranteed compared to that of other tenants. To address the fairness problem, we propose OctoFAS, a two-level fair scheduler designed to improve overall throughput and fairness among tenants. The two-level scheduler of OctoFAS consists of (i) inter-core scheduling and (ii) intra-core scheduling. Through inter-core scheduling, OctoFAS addresses the load imbalance problem that is inherent in SPDK on the storage server by dynamically migrating I/O requests from overloaded cores to underloaded cores, thereby increasing overall throughput. Intra-core scheduling prioritizes handling requests from starving tenants over well-fed tenants within core-specific event queues to ensure fair I/O services among multiple tenants. OctoFAS is deployed on a Linux cluster with SPDK. Through extensive evaluations, we found that OctoFAS ensures that the total system throughput remains high and balanced, while enhancing fairness by approximately 10% compared to the baseline, when both scheduling levels operate in a hybrid fashion.

97 MATHEMATICS AND COMPUTING↗

Lifting and Dropping VMs to Dynamically Transition Between Time- and Space-sharing for Large-Scale HPC Systems

As HPC environments increasingly integrate with edge based systems, system architectures will need to handle a broader class of workloads and scheduling requirements. One result of this shift will be the need to simultaneously support bulk-synchronous parallel (BSP) and on-demand service based applications on the same infrastructure. This in turn will require that future resource management approaches utilize both space-shared as well as time-shared resource scheduling strategies. In this work we introduce the concept of "VM-lifting'' (and its inverse "VM-Dropping'') which allows dynamically switching an HPC workload between space-shared and time-shared scheduling regimes. Our work targets co-kernel based HPC system software environments, in which multiple specialized OS kernels execute natively on dedicated physical resource partitions inside a single compute node. With VM-lifting, a native co-kernel can be migrated at runtime to and from locally hosted Virtual Machine Environments due to changing scheduling requirements of the node. This allows an HPC node to be dynamically (re-)configured as either a time-shared Infrastructure-as-a-Service (IaaS) resource or a dedicated space shared resource based on the current workload demands. We have implemented this approach in the context of the Hobbes Exascale System Software stack and have demonstrated that a node can be reconfigured with minimal impact on the running applications.

Gordon, Nick↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters’ use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as we are currently keeping credentials active for approximately 15 experiments, each with 1-3 different credentials, and distributing those credentials to 2-20 submit points per experiment, with those numbers steadily increasing. To address these issues, we created and deployed a Managed Tokens service. The service is written in Go, taking advantage of that language’s native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points. When experimenters schedule jobs to be submitted, these distributed vault tokens are used to access a Hashicorp Vault instance (run separately from the Managed Tokens service), and previously-stored refresh tokens there are used to obtain the bearer token that is submitted with the job. We will discuss here the design of the Managed Tokens service, including elaborating on certain choices we made with regards to concurrent operations, configuration, monitoring, and deployment.

Bhat, Shreyas↗

Development of the ITACA Network Loading Analysis Tool's Scheduling Techniques

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by creating analysis capabilities which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. The Integrated Tradespace Analysis of Communications Architectures (ITACA) will provide an all-in-one package for various analysis capabilities that normally require add-ons or multiple tools to complete. The ITACA tool will be responsible for assessing the given network architecture and generating a schedule for the missions as well as the assets. ITACA will allow users to evaluate the quality of service of a given network and determine whether or not the network will satisfy the mission's requirements. ITACA is currently under development, and during the spring of 2018 major development in the tools scheduling techniques were completed. A total of seven different techniques were completed.

space communications↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Intelsat satellite scheduled for launch

The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.

Source record↗

Servicing of spacecraft in the geostationary arc

The possibility of servicing geosynchronous spacecraft in connection with the development of the Space Station and its associated infrastructure is discussed. The proposed servicing infrastructure is presented as well as the design of a serviceable spacecraft, and a servicing scenario for a geostationary earth observation platform. The scenario employs the space based OTV, OMV, remote servicer and remote refueling system. It is shown that servicing geostationary spacecraft provides the largest economic benefit when performed on a scheduled basis.

Russell, Paul K.↗

A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

Heere, Karen R.↗

STS-106 Crew Activities Report/Flight Day 3 Highlights

On this third day of the STS-106 Atlantis mission, the flight crew, Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen as they approach the International Space Station (ISS). Also shown are views of the rendezvous taken from both the Zarya Control Module and the Atlantis spacecraft. Final preparation for the docking includes checking of tools and equipment needed to support the rendezvous and docking, as well as equipment for the scheduled space walk. After docking over Western Kazakhstan, the Zarya and Zvezda Service Module is seen from the external cameras of Atlantis. Also shown is footage of the crew before and during the rendezvous.

Source record↗

Special Issue: Environmental Barrier Coatings

The global increase in air travel will require commercial vehicles to be more efficient than ever before. Advanced turbine hot section materials are a key technology required to keep fuel consumption and emission to a minimum. Ceramic matrix composites (CMCs) are the most promising material to revolutionize turbine hot section materials because of their excellent high‐temperature properties. Rapid surface recession due to volatilization by water vapor is the Achilles heel of CMCs. Environmental barrier coatings (EBCs), which protect CMCs from water vapor, is an enabling technology for CMCs. The first CMC component entered into service in 2016 in a commercial engine, and more CMC components are scheduled to follow within the next few years. One of the most difficult challenges to CMC components is EBC durability because failure of EBC leads to a rapid reduction in CMC component life. Novel EBC chemistries, creative EBC designs, and robust processes are required to meet EBC durability challenges. Engine-relevant testing, characterization, and lifing methods need to be developed to improve EBC reliability. The aim of this Special Issue is to present recent advances in EBC technology to address current EBC challenges.

EBC, CMC, Oxidation, Volatility, CMAS, Thermomecha↗

Commercial ELV services and the National Aeronautics and Space Administration - Concord or discord?

In implementation of the U.S. policy to foster and encourage the commercial expendable launch vehicle (ELV) industry, tensions have developed between the industry and U.S. Government agencies in two distinct areas: industry use of government facilities and government purchase of commercial ELV services. The reasons for the tensions and discrete legal problems for each area are identified and discussed. Specifically, in the use of government facilities area, issues of insurance and indemnification for third-party liability and government property, concerns over priority and scheduling, and dispute-resolution procedures are discussed. In the area of government purchase of ELV launch services, a comparison is made between a launch service purchase and prior procurement practice. In all areas, the conclusion is reached that while problems still exist, they generally are understood and great progress has been made toward their resolution.

Frankle, Edward A.↗

Vehicle to Grid Frequency Regulation Capacity Optimal Scheduling for Battery Swapping Station Using Deep Q-Network

Battery swapping stations (BSSs) are ideal candidates for fast frequency regulation services (FFRS) due to their large battery stock capacity. In addition, BSSs can precharge batteries for customers and the batteries that are not in charging can provide a stable regulation capacity to the market. However, uncertainties, such as ACE signals and the EV per-hour visit counts, introduce stochastic nonlinear dynamics into the operation of a BSS-based FFRS. Currently, there is no quantification method to ensure its optimal economical operation. To close this gap, in this article, we propose a novel deep Q-learning-based FFRS capacity dynamic scheduling strategy. This method can autonomously schedule the hourly regulation capacity in real time to maximize the BSSx0027;s revenue for providing FFRS. Case studies using real-world data verify the efficacy of the proposed work.

25 ENERGY STORAGE↗

BigData Express: Toward Schedulable, Predictable, and High-Performance Data Transfer

Big Data has emerged as a driving force for scientific discoveries. Large scientific instruments (e.g., colliders, and telescopes) generate exponentially increasing volumes of data. To enable scientific discovery, science data must be collected, indexed, archived, shared, and analyzed, typically in a widely distributed, highly collaborative manner. Data transfer is now an essential function for science discoveries, particularly within big data environments. Although significant improvements have been made in the area of bulk data transfer, the currently available data transfer tools and services can not successfully address the high-performance and time-constraint challenges of data transfer required by extreme-scale science applications for the following reasons: disjoint end-to-end data transfer loops, cross-interference between data transfers, and existing data transfer tools and services are oblivious to user requirements (deadline and QoS requirements). Fermilab has been working on the BigData Express project to address these problems. BigData Express seeks to provide a schedulable, predictable, and high-performance data transfer service for big data science. The BigData Express software is being deployed and evaluated at multiple research institutions, which include UMD, StarLight, FNAL, KISTI, KSTAR, SURFnet, Ciena, and other sites. Meanwhile, the BigData Express research team is collaborating with the StarLight International/National Communications Exchange Facility to deploy BigData Express at various research platforms, including Pacific Research Platform, National Research Platform, and Global Research Platform. It is envisioned that we are working toward building a high-performance data transfer federation for big data science.

Lu, Qiming↗

Coordinated PEV Charging for Distribution System Management

Plug-in electric vehicles (PEVs) can help to reduce worldwide dependence on petroleum and carbon emissions. In the past a few years, PEVs have received considerable attention as an eco-friendly and cost-effective alternative to conventional gasoline vehicles. PEVs consume higher power from the grid during charging compared to conventional residential loads. Therefore, the emerging fleet of PEVs will introduce a considerable amount of additional load on power system. On the other hand, majority of PEVs are parked for more than 90% of the time, making them ideal for providing various services through Electric Vehicle Supply Equipment (EVSE), a.k.a. charging stations which are PEVs’ connection points to the power system. In this project, coordinated PEV charging are developed to provide distribution system services, considering PEV characteristics, realistic travel pattern, charging behaviors, and EVSE power rating and availability. The main efforts and contributions are summarized as follows. • Mobility models and EVSE charging capability/availability are indispensable for evaluating PEV charging coordination strategies and developing PEV charging control. Many existing studies utilize simplified mobility models assuming that the entire vehicle fleet returns home in the evening and is parked at home until the next morning. Some other PEV models better represent diversified home arrival and departure time, but cannot capture varying charging flexibility and capability at different locations, and therefore are not appropriate to study the impacts of public EVSE on PEV load and utilization. In this work, a mobility and charging flexibility model is proposed to better represent the temporal availability and varying charging capability from PEV onboard charger and EVSE. • Based on the mobility model, a generalized optimization method is proposed to evaluate different PEV charging coordination strategies. In existing literature, different algorithms and methods need to be designed to evaluate each charging strategy from both vehicle owners’ and system’s perspective. With the optimization method proposed in this work, different charging control strategies can be studied and compared by only updating objective functions. Moreover, optimization tricks are provided to convert the optimization problems to equivalent linear programming problems, which can be efficiently solved with existing solvers. • An innovative scheduling and control framework is proposed to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of EVSE is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the simplified charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging control can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. • The proposed charging strategy evaluation and smart charging control methods are applied to one of the prototypical feeders developed by the Pacific Northwest National Laboratory (PNNL) for case studies. Detailed trip information extracted from the National Household Travel Survey (NHTS) is used to represent travel and parking patterns. Different scenarios are simulated to evaluate the performance of the proposed methods and understand how PEV mobility and public EVSE availability affect PEV load and potential grid services.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

i-SAIRAS '90; Proceedings of the International Symposium on Artificial Intelligence, Robotics and Automation in Space, Kobe, Japan, Nov. 18-20, 1990

The present conference on artificial intelligence (AI), robotics, and automation in space encompasses robot systems, lunar and planetary robots, advanced processing, expert systems, knowledge bases, issues of operation and management, manipulator control, and on-orbit service. Specific issues addressed include fundamental research in AI at NASA, the FTS dexterous telerobot, a target-capture experiment by a free-flying robot, the NASA Planetary Rover Program, the Katydid system for compiling KEE applications to Ada, and speech recognition for robots. Also addressed are a knowledge base for real-time diagnosis, a pilot-in-the-loop simulation of an orbital docking maneuver, intelligent perturbation algorithms for space scheduling optimization, a fuzzy control method for a space manipulator system, hyperredundant manipulator applications, robotic servicing of EOS instruments, and a summary of astronaut inputs on automation and robotics for the Space Station Freedom.

Source record↗

SatCORPS Global Cloud Composite (GCC): the Design and Delivery of A High Quality, High Resolution, Global Cloud Product Available in Near-Real Time

The NASA Satellite ClOud and Radiation Property retrieval System (SatCORPS) supports the development of an analysis ready and cloud-optimized data transformation pipeline and geospatial service enablement of a global cloud composite (GCC) product derived from global geostationary satellite imagery. This geospatial service will be available at high temporal and spatial resolution via the SatCORPS web mapping application for visualization and analysis as well as direct ingestion to common geospatial software and custom programming. The resulting global cloud composite products from the processing pipeline can then be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. Near real time global observations are created through the composition of five geostationary satellites that provides modelling and forecasting communities with the capability to provide high quality and timely information to start the projection process. The Global Cloud Composite product combines information from geostationary satellites, GOES-16, GOES-17, Himawari-8, Meteosat-11 and Meteosat-9 to create a single global composite netcdf file and images using the different products within the netcdf file. The SatCORPS team, though our Global Cloud Composite (GCC) product and web-based visualization tools including Geographical Information System (GIS) services provide near real time global cloud product information to both automated processes and traditional web users that is timely and high quality derived from geostationary satellites. The Global Cloud Composite product takes advantage of the scalable processing resources provided by the AWS batch service to provide new composites every thirty minutes. Because information from each of the low earth orbiting satellites is available on schedules tuned to the specific satellite, the processing algorithm temporally composites the final dataset as each satellite’s information becomes available. The SatCORPS team has leveraged our experience using Amazon Web Services (AWS) to build a low latency high availability tool that allows end users both human and automated to acquire high quality and high-resolution Geostationary Earth Orbiting (GEO) information at zero cost to the end user. This presentation will describe how we architected and implemented the service as well as lessons learned based on our experiences both developing and operating the system. The lessons learned include how we integrated multiple services including Amazon Batch, Amazon S3 and Amazon Lambda service to create a low cost but high-performance processing system that is capable of identifying and processing the most appropriate satellite overpass information into global cloud composites. We will also describe our web-based tools including our Geographic Information System that can be used for visualization and analysis. The products from the processing can be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. The SatCORPS Global Composite Cloud product provides sophisticated global composited cloud research products with very low latency that we see that as filling a rapidly growing need in the research and modelling community with no up-front nor ongoing costs associated with downloading or using the information.

AWS AMCE SMCE GCC SATCORPS GLOBAL CLOUD COMPOSITE ↗