Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Engineering and Integrations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

National Renewable Energy Laboratory's Hydrogen Technologies and Systems Center is Helping to Facilitate the Transition to a New Energy Future

The Hydrogen Technologies and Systems Center (HTSC) at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) uses a systems engineering and integration approach to hydrogen research and development to help the United States make the transition to a new energy future - a future built on diverse and abundant domestic renewable resources and integrated hydrogen systems.Research focuses on renewable hydrogen production, delivery, and storage; fuel cells and fuel cell manufacturing; technology validation; safety, codes, and standards; analysis; education; and market transformation. Hydrogen can be used in fuel cells to power vehicles and to provide electricity and heat for homes and offices. This flexibility, combined with our increasing demand for energy, opensthe door for hydrogen power systems. HTSC collaborates with DOE, other government agencies, industry, communities, universities, national laboratories, and other stakeholders to promote a clean and secure energy future.

08 HYDROGEN↗

The role of optimization in structural model refinement

To evaluate the role that optimization can play in structural model refinement, it is necessary to examine the existing environment for the structural design/structural modification process. The traditional approach to design, analysis, and modification is illustrated. Typically, a cyclical path is followed in evaluating and refining a structural system, with parallel paths existing between the real system and the analytical model of the system. The major failing of the existing approach is the rather weak link of communication between the cycle for the real system and the cycle for the analytical model. Only at the expense of much human effort can data sharing and comparative evaluation be enhanced for the two parallel cycles. Much of the difficulty can be traced to the lack of a user-friendly, rapidly reconfigurable engineering software environment for facilitating data and information exchange. Until this type of software environment becomes readily available to the majority of the engineering community, the role of optimization will not be able to reach its full potential and engineering productivity will continue to suffer. A key issue in current engineering design, analysis, and test is the definition and development of an integrated engineering software support capability. The data and solution flow for this type of integrated engineering analysis/refinement system is shown.

Lehman, L. L.↗

Overview of NASA Gateway Lunar Dust Mitigation and Contamination Modeling and Analysis

The planned NASA Artemis campaign has several lunar surface missions in which the NASA Gateway is the waypoint between lunar orbit and the lunar surface for Human Lander System (HLS). Each of these missions is an opportunity for lunar dust to be introduced into the Gateway environment, post surface mission, potentially causing end of life (EOL) performance degradation due to lunar dust contamination of sensitive hardware and systems on the exterior of Gateway and Visiting Vehicles. The Gateway Systems Engineering and Integration (SE&I) and Induced Environments teams are addressing the challenge of lunar dust with a two-pronged approach. Characterization of the lunar dust induced environment around Gateway and contamination risk is accomplished with a comprehensive physics-based framework, the Gateway On-orbit Lunar Dust Modeling and Analysis Program (GOLDMAP), which is currently in development. Analysis results from GOLDMAP define Gateway-level induced environments requirements and are flowed to elements and subsystems. In parallel, a dust mitigation strategy is being developed with a focus on lunar dust protection, dust mitigation technologies, mitigation and testing guidance, and cross-program coordination and is informed by outputs from GOLDMAP analyses. Activities supporting both components include hardware susceptibility assessments and testing, and scientific experiments on lunar regolith.

Gateway↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Commercial Crew Program and the Safety Technical Review Board

The Commercial Crew Program (CCP) is unique to any other program office at NASA. After the agency suffered devastating budget cuts and the Shuttle Program retired, the U.S. gave up its human spaceflight capabilities. Since 2011 the U.S. has been dependent on Russia to transport American astronauts and cargo to the International Space Station (ISS) and back. NASA adapted and formed CCP, which gives private, domestic, aerospace companies unprecedented reign over America's next ride to space. The program began back in 2010 with 5 companies and is now in the final phase of certification with 2 commercial partners. The Commercial Crew Program is made up of 7 divisions, each working rigorously with the commercial providers to complete the certification phase. One of these 7 divisions is Systems Engineering and Integration (SE&I) which is partly comprised of the Safety Technical Review Board (STRB). The STRB is primarily concerned with mitigating improbable, but catastrophic hazards. It does this by identifying, managing, and tracking these hazards in reports. With the STRB being in SE&I, it significantly contributes to the overall certification of the partners' vehicles. After the partners receive agency certification approval, they will have the capability to provide the U.S. with a reliable, safe, and cost-effective means of human spaceflight and cargo transport to the ISS and back.

crew transportation system↗

Principles of Sociology in Systems Engineering

Systems engineering involves both the integration of the system and the integration of the disciplines which develop and operate the system. Integrating the disciplines is a sociological effort to bring together different groups, often with different terminology, to achieve a common goal, the system. The focus for the systems engineer is information flow through the organization, between the disciplines, to ensure the system is developed and operated with all relevant information informing system decisions. Robert K. Merton studied the sociological principles of the sciences and the sociological principles he developed apply to systems engineering. Concepts such as specification of ignorance, common terminology, opportunity structures, role-sets, and the reclama (reconsideration) process are all important sociological approaches that should be employed by the systems engineer. In bringing the disciplines together, the systems engineer must also be wary of social ambivalence, social anomie, social dysfunction, insider-outsider behavior, unintended consequences, and the self-fulfilling prophecy. These sociological principles provide the systems engineer with key approaches to manage the information flow through the organization as the disciplines are integrated and share their information. This also helps identify key sociological barriers to information flow through the organization. This paper will discuss this theoretical basis for the application of sociological principles to systems engineering.

Watson, Michael D.↗

Optical Design of Multi-field Integral Field Unit Spectrograph for the ORCAS Keck Instrument Development II (ORKID II) Instrument

We have designed an Integral Field Unit for the ORCAS Keck Instrument Development II (ORKID II) Instrument. Building on the success of the ORKID camera which achieved 15.2 masec PSF FWHM visible light imaging, ORKID II will add Integral Field Spectroscopy to analyze Active Galactic Nuclei (AGN), supernovae redshift and brightness, and other observations. Several design options have been explored based on image slicers manufactured by the Canon Corporation’s machining process. Field layouts can include up to three disparate spatial sampling, with a lower limit of 6.7 masec. Spectral resolutions are considered from R 100 to R 10,000.

Space Instrumentation↗

Integrated System for Retrieval, Transportation and Consolidated Storage of Used Nuclear Fuel in the US - 13312

The current inventory of used nuclear fuel assemblies (UNFAs) from commercial reactor operations in the United States totals approximately 65,000 metric tons or approximately 232,000 UNFAs primarily stored at the 104 operational reactors in the US and a small number of decommissioned reactors. This inventory is growing at a rate of roughly 2,000 to 2,400 metric tons each year, (Approx. 7,000 UNFAs) as a result of ongoing commercial reactor operations. Assuming an average of 10 metric tons per storage/transportation casks, this inventory of commercial UNFAs represents about 6,500 casks with an additional of about 220 casks every year. In January 2010, the Blue Ribbon Commission (BRC) [1] was directed to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new plan. The BRC issued their final recommendations in January 2012. One of the main recommendations is for the United States to proceed promptly to develop one or more consolidated storage facilities (CSF) as part of an integrated, comprehensive plan for safely managing the back end of the nuclear fuel cycle. Based on its extensive experience in storage and transportation cask design, analysis, licensing, fabrication, and operations including transportation logistics, Transnuclear, Inc. (TN), an AREVA Subsidiary within the Logistics Business Unit, is engineering an integrated system that will address the complete process of commercial UNFA management. The system will deal with UNFAs in their current storage mode in various configurations, the preparation including handling and additional packaging where required and transportation of UNFAs to a CSF site, and subsequent storage, operation and maintenance at the CSF with eventual transportation to a future repository or recycling site. It is essential to proceed by steps to ensure that the system will be the most efficient and serve at best its purpose by defining: the problem to be resolved, the criteria to evaluate the solutions, and the alternative solutions. The complexity of the project is increasing with time (more fuel assemblies, new storage systems, deteriorating logistics infrastructure at some sites, etc.) but with the uncertainty on the final disposal path, flexibility and simplicity will be critical. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

Integrated Advanced Reciprocating Internal Combustion Engine System for Increased Utilization of Gaseous Opportunity Fuels

The project is addressing barriers to or opportunities for increasing distributed generation (DG)/combined heat and power (CHP) use in industrial applications using renewable/opportunity fuels. This project brings together novel gas quality sensor (GQS) technology with engine management for opportunity fuels such as landfill gas, digester gas and coal bed methane. By providing the capability for near real-time monitoring of the composition of these opportunity fuels, the GQS output can be used to improve the performance, increase efficiency, raise system reliability, and provide improved project economics and reduced emissions for engines used in distributed generation and combined heat and power.

42 ENGINEERING↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Integrating system safety into the basic systems engineering process

The basic elements of a systems engineering process are given along with a detailed description of what the safety system requires from the systems engineering process. Also discussed is the safety that the system provides to other subfunctions of systems engineering.

John W. Griswold↗

Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

Source record↗

Space Shuttle Program progress report

A status report devoted to progress of design, manufacturing and test activities for each element of the Space Shuttle is presented. In particular, attention is given to system engineering and integration, the orbiter and its subsystems, the carrier aircraft, the main engine, the external tank, the solid rocket booster, the launch and landing facilities, and ground and orbital flight tests.

Thompson, R. F.↗

Acoustic properties of turbofan inlets

The finite element codes were improved using Hermitian elements and numerical integration of element relations. The question of real variable versus complex variable formulation was resolved and an integrated civil engineering system was implemented on the Georgia Tech Cyber 70/74. Efforts are underway to restructure the program to obtain the most efficient use of array storage.

Zinn, B. T.↗