Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Initial Development of A Digital Twin Model for an Electrified Aircraft Propulsion Emulation Rig

In support of aviation fuel burn and emission reduction goals, NASA is pursing high-payoff research investments that promise to transform aviation. This includes investments in Electrified Aircraft Propulsion (EAP), which relies on the generation, storage, transmission, and use of electrical power for producing thrust and optimizing propulsion system efficiency. Multiple technology challenges must be addressed to unlock the full potential of EAP. This includes advances in propulsion controls, which will be vital for ensuring coordinated efficient operation of the complex integrated subsystems that comprise EAP architectures. To support EAP controls research, the NASA Glenn Research Center has developed the Hybrid Propulsion Emulation Rig (HyPER). The HyPER laboratory hardware includes shaft-mounted electric machines, power converters, power supplies, power distribution cables, and an energy storage device that can be reconfigured to represent a variety of EAP architectures. It also includes an integrated real-time computer system that hosts developed EAP control software and turbomachinery simulations. This enables the electrical system and rotating shafts of EAP designs to be implemented in actual hardware and integrated with turbomachinery simulations and system-level EAP control logic implemented in software. In this form, the HyPER laboratory provides a partially simulated, partially hardware-in-the-loop test environment enabling the initial development and evaluation of EAP control technology. A prerequisite for the development of EAP control designs is the availability of a system model that accurately reflects the operation of the electrical system hardware. To support this need, a digital twin model of the HyPER electrical system hardware is under development. This model is being coded in the MATLAB Simulink environment and uses the NASA-developed Electrical Modeling and Thermal Analysis Toolbox (EMTAT) to construct a digital twin framework. EMTAT contains generic electrical component building blocks that are simulated at turbomachinery timescales. Associated inputs and outputs allow the blocks to be combined to model complete electrical systems. The EMTAT blocks also contain adjustable internal maps and parameters that can be set to reflect the operation of a specific electrical component. For the HyPER digital twin, the settings of these EMTAT block internal maps and parameters is determined through machine learning approaches applied to characterization run data collected from the laboratory. During characterization runs the laboratory electrical system hardware is subjected to a full range of torque, speed, and power settings. Acquired data is then used to estimate EMTAT block parameters using a variety of machine learning techniques. The resulting digital twin model is found to match the operation of actual HyPER hardware with an accuracy suitable for control development purposes. It also holds promise for other applications including modeling the performance of HyPER laboratory reconfigurations and model-based anomaly detection. Planned follow-on work to automate post-processing of acquired laboratory data to update the HyPER digital twin model will also be presented and discussed.

Electrified Aircraft Propulsion↗

Distributed performance counters

A plurality of first performance counter modules is coupled to a plurality of processing cores. The plurality of first performance counter modules is operable to collect performance data associated with the plurality of processing cores respectively. A plurality of second performance counter modules are coupled to a plurality of L2 cache units, and the plurality of second performance counter modules are operable to collect performance data associated with the plurality of L2 cache units respectively. A central performance counter module may be operable to coordinate counter data from the plurality of first performance counter modules and the plurality of second performance modules, the a central performance counter module, the plurality of first performance counter modules, and the plurality of second performance counter modules connected by a daisy chain connection.

97 MATHEMATICS AND COMPUTING↗

Central Plateau Cleanup at DOE's Hanford Site - 12504

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Supervisory Control System for Thermal Energy Distribution System

The integrated energy system (IES) refers to the combination of nuclear energy generation with other energy sources to enable the efficiency and reliability of power generations. To create technologically viable and economically competitive systems, supervisory control strategies are critical for optimizing performance and ensuring stability across different energy generation, transportation, and utilization. This work focuses on the control strategies for the thermal energy distribution system (TEDS), which is a cornerstone of the Dynamic Energy Transport and Integration Laboratory at Idaho National Laboratory. TEDS currently relies on operators to coordinate across different components to manage energy storage and ensure efficiency. This work demonstrates the use of model predictive control (MPC) with surrogate models in determining optimal setpoints for major TEDS components. The capability of MPC-based supervisory control system is evaluated by autonomously matching the power outputs from a Dymola-based TEDS with target heat demands.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Hybrid insulation coordination and optimisation for 1 MV operation of pulsed electron accelerator KALI-30GW

In a multi-gigawatt pulsed power system like KALI-30 GW, insulation coordination is required to achieve high voltages ranging from 0.3 MV to 1 MV. At the same time optimisation of the insulation parameters is required to minimize the inductance of the system, so that nanoseconds output can be achieved. The KALI-30GW pulse power system utilizes a combination of Perspex, delrin, epoxy, transformer oil, nitrogen/SF{sub 6} gas and vacuum insulation at its various stages in compressing DC high voltage to a nanoseconds pulse. This paper describes the operation and performance of the system from 400 kV to 1030 kV output voltage pulse and insulation parameters utilized for obtaining peak 1 MV output. (author)

43 PARTICLE ACCELERATORS↗

Safety Benefit Analysis of Conformance Monitoring for Situation Awareness in UTM

This work presents an analytical approach to address situations in drone operations when strategic coordination alone cannot ensure safety, requiring support from the Conformance Monitoring for Situation Awareness service and potentially other deconfliction services. This study focuses on evaluating the impact of off-nominal operations on both UA-to-UA collision risk and ground injury risk. It first establishes a relationship between the likelihood of off-nominal flights and the effectiveness of strategic coordination. The analysis then derives operational conditions where strategic coordination alone is insufficient to meet target safety requirements, particularly when the likelihood of off-nominal operations exceeds a certain threshold. The results indicate that higher operational tempo or density requires a lower likelihood of offnominal operations for strategic coordination to remain effective and meet safety targets. These findings provide quantitative operational thresholds for when CMSA services are necessary. This work contributes to the safety case for both strategic coordination and CMSA services, offering analysis on when CMSA should be employed to support strategic coordination in achieving the desired safety levels. It also establishes a framework for incorporating other deconfliction services in future safety case analyses.

Strategic deconfliction↗

Safety Benefit Analysis of Conformance Monitoring for Situation Awareness in UTM

This work presents an analytical approach to address situations in drone operations when strategic coordination alone cannot ensure safety, requiring support from the Conformance Monitoring for Situation Awareness service and potentially other deconfliction services. This study focuses on evaluating the impact of off-nominal operations on both UA-to-UA collision risk and ground injury risk. It first establishes a relationship between the likelihood of off-nominal flights and the effectiveness of strategic coordination. The analysis then derives operational conditions where strategic coordination alone is insufficient to meet target safety requirements, particularly when the likelihood of off-nominal operations exceeds a certain threshold. The results indicate that higher operational tempo or density requires a lower likelihood of offnominal operations for strategic coordination to remain effective and meet safety targets. These findings provide quantitative operational thresholds for when CMSA services are necessary. This work contributes to the safety case for both strategic coordination and CMSA services, offering analysis on when CMSA should be employed to support strategic coordination in achieving the desired safety levels. It also establishes a framework for incorporating other deconfliction services in future safety case analyses.

Strategic deconfliction↗

Efficient Optimization of Large Wind Farms for Real-Time Control: Preprint

Wind turbines in a wind farm typically operate individually to maximize their own performance regardless of the impact of aerodynamic interactions on neighboring turbines. Properly coordinating turbines, by operating some turbines suboptimally, within a wind farm has the potential to improve overall wind farm performance. Computing the optimal control strategy under varying atmospheric conditions can be computationally intense for large wind farms. As wind power farms increase in size and related models become more complex, computationally efficient algorithms are needed to perform real-time optimization and control. This study proposes a distributed optimization framework and computationally efficient wake steering wind farm control strategy that uses the yaw angle of a turbine to alter the behavior of a turbine wake and minimize turbine interactions. This computational efficiency allows the strategy to be feasible for real-time control.

17 WIND ENERGY↗

MaROS Strategic Relay Planning and Coordination Interfaces

The Mars Relay Operations Service (MaROS) is designed to provide planning and analysis tools in support of ongoing Mars Network relay operations. Strategic relay planning requires coordination between lander and orbiter mission ground data system (GDS) teams to schedule and execute relay communications passes. MaROS centralizes this process, correlating all data relevant to relay coordination to provide a cohesive picture of the relay state. Service users interact with the system through thin-layer command line and web user interface client applications. Users provide and utilize data such as lander view periods of orbiters, Deep Space Network (DSN) antenna tracks, and reports of relay pass performance. Users upload and download relevant relay data via formally defined and documented file structures including some described in Extensible Markup Language (XML). Clients interface with the system via an http-based Representational State Transfer (ReST) pattern using Javascript Object Notation (JSON) formats. This paper will provide a general overview of the service architecture and detail the software interfaces and considerations for interface design.

Allard, Daniel A.↗

FLISR in the Presence of DERs ADMS Test Bed Use Case

Fault location, isolation, and restoration (FLISR) is one of the distribution automation applications that utilities are most interested in. It operates groups of switches on distribution feeders to improve the reliability of power delivery after localizing outages. FLISR is an essential function for enabling a self-healing grid, and it directly affects grid reliability and resilience. The presence of DERs brings both new opportunities and challenges for FLISR applications. For instance, some DERs can work as backup generation sources and help energize local networks so more switching options can be achieved with the coordination of FLISR operations; however, the existence of DERs also brings new challenges. The bidirectional power flow resulting from DERs might require dynamic changes to protective devices' fault current settings, and thus the FLISR application will need to dynamically adjust its operations in coordination with the dynamic protection settings. Also, some FLISR applications make their service restoration decisions and close tie-switches based on predefined rules; however, the presence of DERs and their impact on altering net loads on the local feeder network are not considered. For this use case, the project team is using the FLISR application of the Survalent ADMS operating on a real-time simulation of a feeder from Central Georgia EMC, a cooperative electric utility. The performance of the FLISR application is being evaluated for different locations and combinations of DERs, including grid-forming battery energy storage systems.

ADMS↗

Coordination Between Sectors in Shared Airspace Operations

Recent studies have shown that a more efficient use of airspace may involve shared airspace operations, i.e., temporal as well as spatial separation of arrival and departure flows [1][2]. Temporal separation would permit a departure aircraft to fly through an arrival flow, depending on an available gap. This would necessitate careful and precise coordination between controllers in different sectors. Three methods of coordination which permit the penetration of a controller's airspace by another controller's aircraft are described: point out, look-and-go, and prearranged coordination procedure. Requirements of each method are given, along with associated problems that have surfaced in the field as described by Aviation Safety and Reporting System (ASRS) and other reports. A Human-in-the-Loop simulation was designed to compare two of the methods: point out and prearranged coordination procedures. In prearranged coordination procedures (P-ACP), the controllers control an aircraft in another controller's airspace according to specified prearranged procedures, without coordinating each individual aircraft with another controller, as is done with point outs. In the simulation, three experienced controllers rotated through two arrival sectors and a non-involved arrival sector of a Terminal Radar Approach Control (TRACON) airspace. Results of eighteen one-hour simulation runs (nine in each of the two conditions) showed no impact of the coordination method on separation violations nor on arrival times for 208 departing aircraft crossing an arrival stream. Participant assessment indicated that although both coordination conditions were acceptable, the prearranged coordination procedure condition was slightly safer, more efficient, timely, and overall, worked better operationally. Problems arose in the point out condition regarding controllers noticing acceptance of point outs. Also, in about half of the point-out runs, time pressure was felt to have had an impact on when and if the departures could cross an arrival stream. An additional problem with point outs may be confusion in the field about which controller has responsibility for separating point-out aircraft from other aircraft.

Parke, Bonny↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Distributed gradient descent for solving optimal power flow in radial networks

Node controllers and power distribution networks in accordance with embodiments of the invention enable distributed power control. One embodiment includes a node controller comprising a memory containing: a plurality of node operating parameters; and a plurality of node operating parameters describing operating parameters for a set of at least one node selected from the group consisting of at least one downstream node and at least one upstream node; wherein the processor is configured by the node controller application to: receive and store in memory a plurality of coordinator parameters describing operating parameters of a node coordinator by the network interface; and calculate updated node operating parameters using an iterative gradient projection process to determine updated node parameters using node operating parameters that describe operating parameters of node and operating parameters of the set of at least one node, where each iteration is determined by the coordinator parameters.

Gan, Lingwen↗

Operational air traffic control requirements for the new Voice Switching and Control System

Final user requirements defined for the Voice Switching and Control System (VSCS) to be implemented for ATC functions as part of the Area Control Facility (ACF) concept for the National Airspace System (NAS) are described. The VSCS will be communications equipment at operational stations, supervisory positions, and support systems, the switching system itself, and interfaces between the VSCS and other systems. Supervisory users will include the Area Manager, Traffic Management Coordinator, a Military Operations Specialists, a Weather Coordinator, a NAS manager, Maintenance, and a flight Data Communications Specialist. The VSCS will supply computerized communications capability within and among ATC centers. Details of the efforts used to define the system requirements are recounted, noting the heavy reliance on recommendations from active ATC personnel.

Leon, N.↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗