Search NASA⌕ Search

SEARCH · Search NASA

Results for “roving vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

280 records · Page 16

Collaborative Host Facility for Lunar Operations

This project establishes a new collaborative simulation connectivity capability for JSC utilizing existing facilities. The principal collaborating organizations are Safety & Mission Assurance (Code NA) and Engineering Directorate (Code EA), but the capability is open for any JSC user. The core of the connectivity resides in Code ER7’s Concept Exploration Laboratory (CEL) and is part of ER7’s Systems Engineering Simulator (SES) complex. NA Subject Matter Experts (SMEs) work proactively in situ with EA and commercial crew counterparts to evaluate Safety Review Panel (SRP) protocols for landers, habitation modules, and lunar roving systems using the same tools, terrain models and data as the designers. NA software initiated under two JSC Center Innovation Fund (CIF) and Innovation Charge account (ICA) funded projects will be used to configure the CEL to function as an EA maintained facility. Collaboration via the CEL with the U.S. Space Force (USSF) provides visibility for USSF. The potential for commercial crew and vehicle suppliers will require IT security and associated security architecture to be implemented in additional CIF based proposals.

Collaborative Simulation Hosting↗

Enhancing In-Flight Structural Health Monitoring of Vertical Lift Vehicles Operating in an Urban Environment

In-situ airframe sensors have long been considered a potential solution for structural health monitoring that could change the design, certification, operation and maintenance paradigms of flight vehicles. In this approach, large networks of sensors covering the entire, or most of, an airframe throughout its operational lifetime would support real-time decisions on airworthiness and obviate the need to overbuild components or perform multiple cycles of structural qualification testing and inspections. This concept would go beyond the current practice of placing select sensors in strategic locations or relying on such sensors only during airframe qualification flights and inspections. For vehicles in the emerging urban air mobility space, reducing weight associated with overbuilds and shortening down-time associated with inspections are critical for improving safety and affordability. In practice, the wide-scale use of in-situ sensors as primary assurance for structural health has not been demonstrated to be feasible or the best solution. A sensor integration testbed was developed as a platform to evaluate the potential of multiple sensor types to enable decision making on airworthiness. We report on the initial runs of this testbed with multiple sensors attached to a common test article. Metal foil strain gauges, eddy current, fiber optic, guided wave (acoustic emission and ultrasonic)and carbon nanotube roving sensors were affixed to the test article. Baseline as well as post damage initiation and fatiguing data are presented and discussed. Despite the relative simplicity of the test article, the interpretation of the as-captured test data was generally not conclusive or did not have wide enough coverage. This result emphasizes the challenges and current limitations both in testing and the practical broad application of embedded sensors as the determinative elements in critical decision making on wide-scale structural health.

Vertical Lift Vehicles↗

Enhancing In-Flight Structural Health Monitoring of Vertical Lift Vehicles Operating in an Urban Environment

In-situ airframe sensors have long been considered a potential solution for structural health monitoring that could change the design, certification, operation, and maintenance paradigms of flight vehicles. In this approach, large networks of sensors covering the entire, or most of, an airframe throughout its operational lifetime would support real-time decisions on airworthiness and obviate the need to overbuild components or perform multiple cycles of structural qualification testing and inspections. This concept would go beyond the current practice of placing select sensors in strategic locations or relying on such sensors only during airframe qualification flights and inspections. For vehicles in the emerging urban air mobility space, reducing weight associated with overbuilds and shortening down-time associated with inspections are critical for improving safety and affordability. In practice, the wide-scale use of in-situ sensors as primary assurance for structural health has not been demonstrated to be feasible or the best solution. A sensor integration testbed was developed as a platform to evaluate the potential of multiple sensor types to enable decision making on airworthiness. We report on the initial runs of this testbed with multiple sensors attached to a common test article. Metal foil strain gauges, eddy current, fiber optic, guided wave (acoustic emission and ultrasonic) and carbon nanotube roving sensors were affixed to the test article. Baseline as well as post damage initiation and fatiguing data are presented and discussed. Despite the relative simplicity of the test article, the interpretation of the as-captured test data was generally not conclusive or did not have wide enough coverage. This result emphasizes the challenges and current limitations both in testing and the practical broad application of embedded sensors as the determinative elements in critical decision making on wide-scale structural health.

Vertical Lift Vehicles↗

Optimized Carbon Fiber Intermediate Development to Enable High-Volume Manufacturing of Lightweight Automotive Composites

The ongoing pursuit of improved fuel economy and reduced greenhouse gas emissions has resulted in sustained interest for lightweight materials technologies. In this context, carbon fiber composites have captured the imagination of automotive engineers due to the potential to achieve substantial mass reduction when compared to traditional steel construction. That stated, the use of carbon fiber composites in automotive has been limited for the most part to premium supercars and other derivative platforms. In these cases, manufacturing costs are less of an obstacle to implementation, and the performance benefits of carbon fiber have enabled production of structures offering more than 50% weight savings. In practice, translating these low-volume demonstrations onto high-volume vehicle platforms has remained challenging. This can be attributed to several factors, with the absence of suitable high throughput production methodologies being a key impediment. To date, structural, crash critical components have relied upon manufacturing techniques born out of the aerospace industry. This has created a disconnect between automotive production systems that are accustomed to manufacturing multiple parts per minute and the aerospace technologies that have cycle times in the order of hours. Consequently, the focus of this project is the development of manufacturing process technology for carbon fiber composites that can support a mainstream vehicle program at an assumed throughput of 100,000 vehicles per year. In practice, this translates to a part-to-part cycle time of less than 3 minutes. Project participation included contributions from a broad range of academic, industrial and national lab partners. The primary scope of work, being the development of new carbon fiber epoxy compounds that are stable at room temperature and suited to high throughput automated processing. For project management, the work streams were divided into six key areas, with the lead organization in parentheses. • Carbon fiber/epoxy materials formulation development and scale up (Dow) • Simulation of discontinuous near isotropic meso-structure intermediates (Purdue) • Simulation of mechanical performance of compression molded components (Purdue) • Meso-Scale morphological analysis and correlation with structural performance (UTK) • Paint and adhesion durability analysis (MSU) • Demonstrator part design, prototype production, and validation testing (Ford). The primary goal at the commencement of the project was development of a chopped carbon fiber sheet molding compound (SMC) that offered a three times improvement in tensile modulus over a comparable glass-based SMC. In addition to meeting mechanical performance targets, the resin kinetics were modified to achieve a processing cycle time of less than 3 minutes. Other critical-to-quality (CTQ) specifications were also stipulated to account for a broad range of materials and processing characteristics. To achieve the above, staff scientists at Dow Chemical created an extensive series of new epoxy blends for testing and validation. Throughout this development, a key challenge was attaining material performance goals without impacting processing behavior and paintability of finished components. The latter required a new internal mold release system being developed by Dow that was designed to complement the kinetics of the rapid cure epoxy. As a complement to work studies at the industrial partners, the teams from academia executed a series of analytical and experimental studies to investigate potential factors influencing CF-SMC performance. Unit cell models were developed to capture the meso-scale representations of the fiber matrix architecture. Results of this analysis and subsequent morphological investigations led to the design of a novel composite derivative comprising carbon fiber platelets embedded in an epoxy matrix; the platelet size and aspect ratio playing significant role in final composite properties. This approach was a departure from previous research in CF-SMC development whereby bulk filamentization or disassembly of the carbon fiber rovings had been considered the most effective means of achieving both fiber wet through and wet-out. As the course of the academia studies progressed, the aspect ratio of the fiber constituents was further optimized before finalizing material attributes and processing conditions. For the purposes of technology validation, the Ford team led a work stream devoted to the design, fabrication and testing of demonstration components. The carbon fiber SMC material has the potential to displace numerous stampings and castings on an automotive structure but ultimately vehicle closure applications were selected to showcase the abilities of the CF-SMC to achieve both mass reduction and business case for large complex structures. Using target properties established by the Dow staff scientists, the complete closure system for a full-size sedan decklid and a mid-size wagon liftgate were engineered. Prototypes for both applications were fabricated using production representative processing methods to allow for physical testing and performance validation of the CF-SMC structures. Following completion of a testing program that concluded with a FMVSS301 55 mph offset rear crash, the CF-SMC formulation was declared by the Ford team to have met all engineering requirements. To summarize, the joint development activities during this project led to significant technical breakthroughs and achievement of all milestones. The result was the development of a novel, tack-free carbon fiber molding compound that is suited to automated processing. This combined room temperature stability, fast cure kinetics, and internal mold release system facilitates cycle times that are conducive to high-volume production. The VORAFUSE M6400 successfully passed technology validation at Ford and is now eligible for consideration on future production commercial vehicle programs.

36 MATERIALS SCIENCE↗

Challenges, Considerations, and Opportunities for Exercise and Medical Accommodation Inside a Small Pressurized Rover

Pressurized Rovers (PR) can enable crew to explore away from a lander or surface habitat at distances not possible on foot or even in unpressurized rovers. Sustaining crew for multiple days, they can rove for weeks, independent of other surface elements. Because these are essentially mobile habitats, it is critical that they provide sufficient volume to accommodate the exercise and medical systems to maintain human health in remote, low gravity environments such as the Moon and Mars. This is an area of extensive unknowns as requirements have not yet been developed for exercise or medical systems in pressurized rovers. Yet they must be considered in vehicle sizing studies as they are significant volume drivers, requiring allocation for stowed and deployed hardware inside the rover cabin. Previously flown spacecraft have allocated varying amounts of volume based on the expected crew mission and the state of the art in these systems. NASA-STD-3001 provides high-level requirements for standards of medical care and exercise capabilities. Crew injuries are possible both inside the cabin and on extravehicular activities (EVA), therefore requiring medical capability. Exercise countermeasures are needed to counteract the debilitating effects of lowered gravity. This may include both reconditioning following a lengthy microgravity transit as well as ongoing countermeasures against the effect of low surface gravity. The NASA reference concept for the PR dates back to the Constellation Program and prototypes have been extensively tested in NASA’s Desert Research and Technology Studies (DRATS) program as well as at the NASA Johnson Space Center. The PR cabin is designed to accommodate two crewmembers and is subdivided into a forward cockpit area and a main body for crew habitation. EVAs are accomplished by transitioning through suit ports in the aft bulkhead into spacesuits. While no exercise devices have been developed for the PR, some have been prototyped and demonstrated in DRATS analog missions. A cycle ergometer performed reasonably well in DRATS testing as an aerobic exercise device and recent analysis work has theorized that a combination aerobic and resistive device could be packaged into a form factor similar to the DRATS ergometer. It is therefore suitable for use as an initial volumetric placeholder. No sensorimotor devices have been considered for the PR to aid in adaptation to surface gravity. However, there are commercially available treadmills that at minimum represent examples of the type of exercise system that could potentially be used for such a purpose. A combination of field test data, analysis, and CAD modeling will be used to perform a first pass assessment of whether these exercise devices can be stowed and deployed within the PR. Medical inventories from the International Space Station will be used as a volume placeholder for the PR medical system. A configuration will be discussed for medical deployment, including positioning of caregiver, patient, and medical equipment / supplies.

Pressurized Rover↗

6.26 Low Cost Basalt Fiber for Automotive Applications

Vehicle lightweighting is an essential component to the automotive industry to improve fuel economy of internal combustion engine (ICE) vehicles to meet ever improving emission standards and to improve the range of electric vehicles (EV). Composite materials offer high specific modulus and specific strength, which makes them appealing for these light weighting efforts. Sheet molding compounds (SMC) are particularly interesting from an automotive perspective because of the relatively low cost and high volume of producing SMC parts. Traditionally, composite materials for automotive application are glass fiber reinforced because of the attractive price - performance ratio, but basalt fibers are a cost and recycling competitive reinforcement alternative in this market. The aim of this project was to examine the feasibility of utilizing basalt fiber for automotive applications. More specifically, an effort was made to examine different fiber sizings on basalt fiber combined with vinyl-ester (VE) resin, and their performance as part of an SMC process. In addition to offering vehicle lightweighting with fiber reinforced polymer composites, basalt fiber is a fully recyclable material and thus supports the IACMI technical goal of: Demonstrate that the technology is capable at a sufficient scale for >80% recyclability or reuse of fiber reinforced polymer composites in five years into useful components with projected cost and quality at commercial scale competitive with virgin materials on a pathway to 95% recyclability or reuse starting in ten years. Three different fiber sizings were applied to a continuous roving of basalt fiber and compared to a traditional Electrical/Chemical Resistance (E-CR) glass fiber that is typically used in these types of applications. Fiber tows were examined for Loss on Ignition percentage (LOI%), Tex, and tow strength. Some sizings clearly outperformed others, and the ability to process these fibers on a pilot scale SMC line was demonstrated. A test plan for the manufacturing and mechanical testing of SMC panels was developed. This work continues outside the time frame allocated for this project. When this work is completed, it will be added to this report and posted as Appendix C. Glass fiber reinforced SMC materials have already proven feasible as a light weighting method for traditionally steel parts like the Volkswagen (VW) Atlas lift-gate (Figure 1); this project team is seeking the feasibility of basalt fiber as a drop-in replacement for glass fiber reinforced SMC. Sizing development for basalt fibers has proven that the mechanical properties are better than E-glass and closer to S-glass, which makes it an interesting material for SMC applications. Better mechanical properties translate to less material needed to achieve load case requirement for target applications. The business case has already been demonstrated for 100,000 parts per year of glass fiber reinforced SMC Atlas lift-gates compared to traditional steel manufacturing processes. Reduced overhead and assembly costs are offset by glass fiber SMC higher cost per kg beyond 100,000 parts per year, which is still a relatively low volume for the automotive industry. For basalt fiber reinforced SMC to become feasible for automotive applications, the price-performance ratio has to be precisely determined. Based on the mechanical performance it is possible to establish a range of applications and technical solutions in which the potential of basalt SMC can be utilized, while the price of the material can be used to compile the business case for such applications. Based on these business cases and the sustainability indicators, glass fiber reinforcement (or other) materials can be directly substituted. Volkswagen’s commitment to reducing carbon emissions cannot be understated. Basalt fiber shows promise of reducing the carbon footprint in SMC materials, especially if sizing optimizations can be made with thermoplastic based SMC. To fully realize the value of basalt fiber reinforced materials, a lifecycle cost analysis should be performed on basalt’s production and recycling, and then compared against E-glass. From this assessment, a true judgement can be made on the commercialization potential of this material. Figure 1. Example of Fiber Reinforced Polymer Composite Liftgate As a conclusion, we can state that Mafic basalt fiber is not a direct replacement for E-glass or E-CR glass based on price, but should be considered a technical solution when E-glass does not provide adequate performance in a composite design and S-glass, aramid and carbon fibers are too costly. Mafic basalt fiber can be placed on the high-performance fiber spectrum next to S-glass for performance but at one third the price. It should be considered for more technically challenging structural designs wherein the performance can demonstrate 20-25% performance enhancement over E-glass to elicit more strength or a weight reduction. Both Michelman and Mafic produce thermoplastic sizings which, in combination with Nylon and polypropylene resin and fibers, can further advance high speed composite implementations while maintaining an eco-friendly manufacturing process.

36 MATERIALS SCIENCE↗

Low-Cost Preform and Molding Processes

The entry cost for prototyping a composite component for manufacture using automated, high rate processes is prohibitively expensive in many cases, especially for small business, where tooling costs may be several $100k. Discussions with industry also indicate that many small companies, tier 1 and 2 suppliers, have an interest to mold composite parts but do not want to deal with the capital cost, material handling issues, and labor associated with dry fiber preforming operations. While the molders may locate near the end user for logistics reasons, it may be more cost effective for the performer to remain regional and invest in capital equipment to support preform automation, thus keeping costs to a minimum. This project was designed to explore and demonstrate several options to meet these industry needs. Dry fiber preforming approaches were evaluated which allow for low pressure resin infusion, single sided tooling options such a vacuum assisted resin transfer molding (VARTM) or low pressure resin transfer molding (RTM-light). Unlike sheet molding compound, SMC compression molding where typical molding pressures of 1000 psi are required to push material into the desired location; positioning of a dry fiber preform into the desired location on the tool allows for low molding pressures of 10-50 psi. Lower molding pressures allow for use of low cost, additive fabrication of polymeric tooling. Polymeric tooling is suitable for rapid part prototyping and limited production. Dry fiber preforming approaches evaluated included use of commercial chopped strand mat, robotic chopper gun deposition, and continuous fiber preform augmentation using tailored fiber placement (TFP). Use of chopped strand mat does not require a robotic deposition method, however a cutting table is generally required and there is typically 20-30% scrap generation. While various fiber areal weights are available, the preform is not readily optimized for minimal fiber use or weight savings. In contrast, a robotic chopper gun approach allows for localized deposition where fiber is required to meet structural requirements. The robotic method is highly automated and minimizes fiber scrap, however the capital cost of the equipment and engineering labor for programming can result in higher preform cost compared to chopped strand mat in certain cases depending on preform complexity. Dry fiber preforming using the robotic chopper gun method allows for creation of three dimensional forms. This approach may be ideal for molding in-house, or if the preforms stack together densely to allow for efficient shipping. Applications evaluated for this program considered trade-off between fabrication of a fully 3D preform versus production of a flat preform which is designed to readily drape into the final desired shape. Such a preform design greatly simplifies robotic programming and requires no specialized tooling. The flat preforms are easily stacked and shipped to the final molding location. Flat preforms are much easier to augment with TFP continuous fiber to provide local reinforcement. The demonstration and evaluation of these preforming and tooling methods were completed on three component applications. The first application was a battery box cover for an electric vehicle which was highly three dimensional. The second demonstrator article was comprised of complex contours and was used to demonstrate the use of TFP and RTM-light molding process. The third demonstration article was the roof of an operator’s cab for large construction equipment. The roof is relatively flat however it is comprised of complex changes in thickness which clearly demonstrate the advantage of robotic chopper gun approach as compared to using numerous preform layers of chopped strand mat. The cost trades for the various preforming methods are summarized to help guide the reader as to preforming method considerations. Finally, these demonstrations all used glass fiber roving. A fourth, exploratory task was added to evaluate the ability to make preforms using Zoltek’s carbon fiber split tow roving. We were able to adapt the chopper gun to make flat preforms for laminate testing, but further development effort would be required to make suitable preforms.

36 MATERIALS SCIENCE↗

NASA's Desert RATS Science Backroom: Remotely Supporting Planetary Exploration

NASA's Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests designed to exercise planetary surface hardware and operations in conditions where long-distance, multi-day roving is achievable. In recent years, a D-RATS science backroom has conducted science operations and tested specific operational approaches. Approaches from the Apollo, Mars Exploration Rovers and Phoenix missions were merged to become the baseline for these tests. In 2010, six days of lunar-analog traverse operations were conducted during each week of the 2-week test, with three traverse days each week conducted with voice and data communications continuously available, and three traverse days conducted with only two 1-hour communications periods per day. In 2011, a variety of exploration science scenarios that tested operations for a near-earth asteroid using several small exploration vehicles and a single habitat. Communications between the ground and the crew in the field used a 50-second one-way delay, while communications between crewmembers in the exploration vehicles and the habitat were instantaneous. Within these frameworks, the team evaluated integrated science operations management using real-time science operations to oversee daily crew activities, and strategic level evaluations of science data and daily traverse results. Exploration scenarios for Mars may include architectural similarities such as crew in a habitat communicating with crew in a vehicle, but significantly more autonomy will have to be given to the crew rather than step-by-step interaction with a science backroom on Earth.

Cohen, Barbara A.↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗