Search NASA⌕ Search

SEARCH · Search NASA

Results for “storage tank”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Experimental Evaluation of Thermal Storage Performance of a Dual-Purpose Underground Thermal Battery

A geothermal heat pump (GHP) system is an energy-efficient building heating and cooling technology with great potential for reducing energy consumption and decarbonization. However, applications of GHP are still limited due to the high cost, of which 30% is related to the cost of installing the conventional vertical bore ground heat exchangers, which are usually installed in boreholes 60 meters deep. A dual-purpose underground thermal battery (DPUTB) has been developed to offer a low-cost ground heat exchanger with a built-in thermal storage capacity. The DPUTB innovatively integrates a shallow-bore ground heat exchanger (the outer tank), which can be installed in a borehole less than 6 m deep, with thermal energy storage (TES) (the inner tank). DPUTB has the potential to reduce the cost of a ground source heat pump system while allowing shifting the electric demand of the building served by the GHP system from peak to off-peak hours of the electric grid by charging and discharging the thermal storage. A lab-scale (1:125 in volume) DPUTB prototype was built. Phase change material (PCM) was added to increase the thermal storage capacity and maintain the supply water temperature from the TES within the desired range for direct cooling operation during the discharge period. As PCMs are critical to the TES performance of the DPUTB, this study compared the influence of different PCMs (including salt hydrate and organic PCMs) on the discharge performance of the DPUTB. The thermal State of Charge (SoC) of the DPUTB was used to compare the performance resulting from using different PCMs. Test results indicate that the organic PCM (Methyl Laurate) outperforms salt-hydrate PCMs due to a lower melting temperature and a narrower melting temperature range during the phase change process. The results of this study provide a guide for PCM selection and the optimal design of DPUTB.

Wang, Lingshi↗

Spent Crystalline Silicotitanate Storage Study—Post AP-105DF Processing

A Tank-Side Cesium Removal (TSCR) system is under development by Washington River Protection Solutions to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. Tank waste supernate will be filtered to remove suspended solids and then Cs will be removed by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable after undetermined storage time. Previous testing with AP-105 simulant showed that rinsing the CST bed with 3 bed volumes (1.4 apparatus volumes [AVs]) of 0.1 M NaOH resulted in a dried bed that maintained flow characteristics indicative of ease of recovery. This study explored the intermediate conditions (between feed dried in place and the 1.4 AVs of 0.1 M NaOH rinse) to evaluate CST bed properties after: 1) stoppage with feed in place; 2) stoppage after draining feed; 3) stoppage after 0.7 AV of 0.1 M NaOH rinse through column; 4) stoppage after 1.5 AVs of 0.1 M NaOH rinse through column. Post processing, each column was heated at 50 °C for 19 days under pseudo-storage conditions to simulate the expected dried and stored CST bed conditions. Testing was conducted at the small scale (12-mL bed volume); actual, Cs-depleted, AP-105 tank waste was used as the feed. Post-dried CST bed physical properties (angle of repose and penetration depth) were measured to evaluate how CST moved and flowed. All process stop-conditions resulted in a solidified CST bed except for the final condition, 1.5 AVs of 0.1 M NaOH rinse. At this small scale, the three CST beds presented an issue for retrievability after the short storage period (19 days at 50 °C). The latter case confirmed the results from simulant testing. The testing was intended to provide a preliminary assessment of issues that may arise from desiccation of CST during storage with the indicated salt solutions in place. Since these were small-scale tests, the processing system did not scale to full scale conditions exactly; however, the tests did provide insight into the impact on the dried and stored CST bed after stopping processing at an earlier step (upset condition) than normal. These results indicate that if an upset condition occurs at TSCR, a dilute hydroxide rinse should be considered before the CST dries from internal heating.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research Highlight - Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

We highlight our work from our previous publication titled "Dispatch Optimization, System Design, and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage" published in MDPI Energies 2022 (doi.org/10.3390/en15103599). Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

97 MATHEMATICS AND COMPUTING↗

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY↗

Spent Crystalline Silicotitanate Storage Study—Post AP-105DF Processing

A Tank-Side Cesium Removal (TSCR) system is under development by Washington River Protection Solutions to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. Tank waste supernate is filtered to remove suspended solids and then Cs is removed by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable after undetermined storage time. Previous testing with AP-105 simulant showed that rinsing the CST bed with 3 bed volumes (1.4 apparatus volumes [AVs]) of 0.1 M NaOH resulted in a dried bed that maintained flow characteristics indicative of ease of recovery. This study explored the intermediate conditions (between feed dried in place and the 1.4 AVs of 0.1 M NaOH rinse) to evaluate CST bed properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heat pump water heater enhanced with phase change materials thermal energy storage: Modeling study

A promising solution to improve the first hour rating (FHR) of a heat pump water heater (HPWH) involves employing a secondary tank which contains phase change material (PCM) capsules. To better understand the influence of PCM thermal storage on the HPWH operational performance, a dynamic model was developed to simulate and analyze the behavior of a newly developed HPWH technology that incorporates PCM storage into a standard HPWH to optimize key parameters such as the uniform energy factor and FHR. Mathematical models of several key components of the proposed HPWH-PCM integrated thermal energy storage (TES) system, e.g., water heater tank, PCM TES tank, evaporator, compressor, and expansion valve, have been elaborated. Also, a model-based control co-simulation platform was developed to integrate a embed PCM storage HPWH dynamic model with a control model for better supporting control design, analysis, verification, and validation. The model accuracy has been validated through comparing simulation results with lab test results, with a mean average percentage error of <5.5% for most of the selected performance variables. In addition, using the developed co-simulation platform, the demand response control strategy was studied to evaluate the load flexibility of the combined HPWH-PCM storage system by shifting system power usage to outside of the 3.5 h peak load period.

25 ENERGY STORAGE↗

High-performance ammonia oxidation catalysts for anion-exchange membrane direct ammonia fuel cells

Low-temperature direct ammonia fuel cells (DAFCs) use carbon-neutral ammonia as a fuel, which has attracted increasing attention recently due to ammonia's low source-to-tank energy cost, easy transport and storage, and wide availability. However, current DAFC technologies are greatly limited by the kinetically sluggish ammonia oxidation reaction (AOR) at the anode. Herein, we report an AOR catalyst, in which ternary PtIrZn nanoparticles with an average size of 2.3 ± 0.2 nm were highly dispersed on a binary composite support comprising cerium oxide (CeO 2 ) and zeolitic imidazolate framework-8 (ZIF-8)-derived carbon (PtIrZn/CeO 2 -ZIF-8) through a sonochemical-assisted synthesis method. Additionally, the PtIrZn alloy, with the aid of abundant OH ad provided by CeO 2 and uniform particle dispersibility contributed by porous ZIF-8 carbon (surface area: ~600 m 2 g -1 ), has shown highly efficient catalytic activity for the AOR in alkaline media, superior to that of commercial PtIr/C. The rotating disk electrode (RDE) results indicate a lower onset potential (0.35 vs. 0.43 V), relative to the reversible hydrogen electrode at room temperature, and a decreased activation energy (~36.7 vs. 50.8 kJ mol -1 ) relative to the PtIr/C catalyst. Notably, the PtIrZn/CeO 2 -ZIF-8 catalyst was assembled with a high-performance hydroxide anion-exchange membrane to fabricate an alkaline DAFC, reaching a peak power density of 91 mW cm -2 . Unlike in aqueous electrolytes, supports play a critical role in improving uniform ionomer distribution and mass transport in the anode. PtIrZn nanoparticles on silicon dioxide (SiO 2 ) integrated with carboxyl-functionalized carbon nanotubes (CNT–COOH) were further studied as the anode in a DAFC. A significantly enhanced peak power density of 314 mW cm -2 was achieved. Density functional theory calculations elucidated that Zn atoms in the PtIr alloy can reduce the theoretical limiting potential of *NH 2 dehydrogenation to *NH by ~0.1 V, which can be attributed to a Zn-modulated upshift of the Pt–Ir d-band that facilitates the N–H bond breakage.

25 ENERGY STORAGE↗

Validation and Verification for INL Modelica-based TEDS models Via Experimental Results

This report provides an overview on the verification and validation (V&V) of the Thermal Energy Distribution System (TEDS) model developed in the Modelica process modeling ecosystem using experimental data. Model development has led to the creation of a dynamic process model of the experimental TEDS facility housed within the Energy Systems Laboratory (ESL) at Idaho National Laboratory (INL). The model was then used during the preconstruction phase of the experimental effort to inform experimental design (e.g., insulation requirements, bypass line placement, expected performance of components) and to test innovative control schemes prior to the initial operation. The TEDS model developed in Modelica includes the primary components of the TEDS experimental unit: a 200kW Chromalox heater; a single-tank packed-bed thermal energy storage system filled with 0.125-inch alumina (Al2O3) beads; an ethylene-glycol-to-Therminol-66 heat exchanger; system piping; five control valves; and all associated temperature, pressure, and volumetric flow sensors. Using the Institute of Electrical and Electronics Engineers (IEEE) V&V methodologies, considered the gold standard in the engineering field, the model was verified using a combination of static analysis, spatial convergence, and regression tests. Then using dynamic time warping (DTW) initial runs to validate and tune the TEDS model versus the experiment were conducted. This tuning method was accomplished using the INL Risk Analysis Virtual ENvironment (RAVEN) software package. Tuning is required to account for physical phenomena that are less understood within the empirical heat transfer correlations. Through the commencement of this work, a systems-level model of TEDS with associated control systems, sensors, piping diameters, and component capabilities has been created. This model was utilized in the pre-experimental phase to inform system design, insulation thicknesses, and potential control schemes to operate the system effectively and safely. Then, initial experimental startup and operational data were used to demonstrate the validation and tuning methodology. This process demonstrates the classical two-step approach of a model informing experimental design followed by the experiment validation and tuning the model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental Comparison of Hydrogen Refueling with Directly Pressurized vs. Cascade Method

This paper presents a comparative analysis of two hydrogen station configurations during the refueling process: the conventional “directly pressurized refueling process” and the innovative “cascade refueling process.” The objective of the cascade process is to refuel vehicles without the need for booster compressors. The experiments were conducted at the Hydrogen Research and Fueling Facility located at California State University, Los Angeles. In the cascade refueling process, the facility buffer tanks were utilized as high-pressure storage, enabling the refueling operation. Three different scenarios were tested: one involving the cascade refueling process and two involving compressor-driven refueling processes. On average, each refueling event delivered 1.6 kg of hydrogen. Although the cascade refueling process using the high-pressure buffer tanks did not achieve the pressure target, it resulted in a notable improvement in the nozzle outlet temperature trend, reducing it by approximately 8 °C. Moreover, the overall hydrogen chiller load for the two directly pressurized refuelings was 66 Wh/kg and 62 Wh/kg, respectively, whereas the cascading process only required 55 Wh/kg. This represents a 20% and 12% reduction in energy consumption compared to the scenarios involving booster compressors during fueling. The observed refueling range of 150–350 bar showed that the cascade process consistently required 12–20% less energy for hydrogen chilling. Additionally, the nozzle outlet temperature demonstrated an approximate 8 °C improvement within this pressure range. These findings indicate that further improvements can be expected in the high-pressure region, specifically above 350 bar. This research suggests the potential for significant improvements in the high-pressure range, emphasizing the viability of the cascade refueling process as a promising alternative to the direct compression approach.

08 HYDROGEN↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Hypothesis of Hot Tank Failure

Work has begun on a Design Basis Document / Owner’s Technical Specification for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. A principal topic of recent interest is the failures of the hot salt tanks in central receiver projects. The paper outlines a hypothesis for the source of the failures, and discusses a range of possible solutions.

14 SOLAR ENERGY↗

Alternative Treatment of Defense Waste Processing Facility Recycle via Reuse of Existing Liquid Waste Facilities - 20097

The Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) has been immobilizing high level waste since 1996. The chemical process within DWPF generates a large volume of condensate, which is recycled to the SRS H-Area Tank Farm. The recycle stream includes a small quantity of sludge solids, as well as soluble cesium that is volatilized during melter operation. The recycle waste is currently received into a large, underground waste tank that separates insoluble solids via decanting. The supernate is treated by an evaporator with a concentrate stream that is stored for future processing. The evaporator overheads are collected and sent to the Effluent Treatment Project (ETP) for final polishing and testing prior to discharge to local surface water. Recycle storage and treatment as described above complicates the overall mission within the tank farms, which are primarily engaged in waste retrieval and preparation activities that support sludge and salt disposition, as well as tank characterization and closure. The need to devote a portion of available storage space to recycle treatment limits operational flexibility, and ultimately the DWPF recycle stream must be diverted to fully close all the SRS waste tanks. An alternative treatment process is being explored to decouple the recycle stream from the tank farm. The proposed treatment process will accomplish solids separation via crossflow filtration and will utilize a wiped film evaporator to volume-reduce the filtrate stream. Evaporator overheads will continue to be further processed in ETP while the solids stream and evaporator concentrate stream will be returned for reprocessing with the DWPF and Salt Waste Processing Facility (SWPF). This process will utilize existing facilities within DWPF and the tank farm that were previously dedicated to Interim Salt Disposition (ISD), but no longer have an identified mission with the startup of SWPF. The reuse of these facilities will remove several constraints from the current Liquid Waste (LW) System Plan without expanding the current footprint of Department of Energy Environmental Management (EM) infrastructure within LW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARC-100 Reactor Security-by-Design Summary

This report applies the security-by-design methodology developed in a previous National Nuclear Security Administration–sponsored work to the Advanced Reactor Concepts 100 (ARC-100) sodium-cooled fast reactor (SFR) design. The report contains no proprietary information specific to the ARC 100 reactor. The insights developed in this report are high-level, and generally applicable to other sodium fast reactor designs. The information presented here is the result of a qualitative safety-based analysis and would not inform any potential adversary beyond what would be found in a docketed safety analysis report. The scope of this present report covers ARC-100’s reactor core, used fuel storage, and used fuel assembly wash station. These systems are also compared to a generic SFR design assumed in the previous study. The security assessment results show changes in structures, systems, and components (SSCs) safety importance relative to the generic SFR SSCs. However, the consequence assessment results are the similar to a previously assessed generic SFR. Several SSCs have higher importance rankings than others, and it is recommended that protection efforts are prioritized for these SSCs. This work will continue in the Fiscal Year 2025 for the remaining ARC-100 systems, including cesium trap, sodium cold trap, noble gas decay tanks (dewar bottles), and used fuel dry storage facility, to provide safety-and-security-by-design insights and recommendations on non-core systems. Results from this work will furnish a technical justification for the feasibility of these solutions for the ARC reactor's design and, where applicable, identify any regulatory benefits conferred by the proactive design aspect within a risk management framework. This initiative will contribute to a more secure design of the ARC reactor and support its licensing process.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Slow Strain Rate Testing of A537 Tank Wall Material

At Savannah River Site (SRS), High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion and/or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate will increase, while the hydroxide and nitrite concentration of the interstitial liquid will deplete and become insufficient to prevent the onset of corrosion attack. Tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite. However, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processing. This testing program was designed to examine the risk of SCC associated with utilizing the pitting factor (PF) and nitrite/nitrate (NO 2 - /NO 3 - ) ratio limits for handling dissolved salt solutions at an elevated temperature in the carbon steel waste tanks. The previously identified limits are a PF of 1.2 and an NO 2 - /NO 3 - ratio of 0.15. The results indicate that as long as the NO 2 - /NO 3 - ratio exceeds 0.1 and the PF is above approximately 0.8, there is a discernible safety margin between the open circuit potential (OCP) and the critical cracking potential (CCP) observed during applied potential testing. However, this margin, defined by the difference between the OCP and CCP, is relatively narrow, ranging from 0.1 to 0.25 volts. This small margin raises concerns about potential shifts in OCP during waste retrieval operations, which could inadvertently increase the risk of SCC if the OCP approaches or exceeds the CCP. These results confirm that dissolved salt solutions provide a potent chemistry that, under certain conditions, makes carbon steel susceptible to SCC. The next question to consider is the influence these results have on decisions for storage and retrieval of waste from the tanks. For Type III/IIIA waste tanks, the risk of SCC remains very low. First, and most importantly, the post-weld stress relief of the tanks has reduced the residual stress near the welds. Thus, without the stress component, SCC risk is minimized. The material of construction (A537 Carbon steel) for the Type III/IIIA tanks is superior to the steel in its resistance to SCC than the steel that was utilized for the Type I, II, and IV tanks (A285 carbon steel). From a chemistry control standpoint for a Type III/IIIA tank directly involved with handling dissolved salt solutions, the PF and NO 2 - /NO 3 - ratio limits may be utilized wherein chemistry control provides an extra layer of defense against SCC. Chemistry control for a Type III/IIIA tank minimizes the risk for a tank that may receive the dissolved salt solution, particularly if that tank is a Type I, II, or IV waste tank. On the other hand, if the dissolved salt solution is handled by a Type I, II, or IV waste tank the risk of SCC is real. The potent chemistry, absence of stress relief, and inferior material result in a condition that is conducive to cracking. Efforts should be made to either avoid transferring waste that may not meet the PF and NO 2 - /NO 3 - ratio criteria to one of these tanks or if it is unavoidable, take measures to minimize the consequences of a leak. As shown by these tests, even if the PF and NO 2 - /NO 3 - ratio criteria are met, there is a risk that the tank potential may be disturbed in the positive direction and the risk of SCC increase.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System-Level Comparison of Sodium and Salt Systems in Support of the Gen3 Liquids Pathway

This paper presents the comparison of the annual performance and the Levelised Cost of Energy (LCOE) of two high- temperature solar power tower configurations using a 565MWth chloride salt receiver and a 540 MWth liquid sodium receiver. Each power tower consists of a sodium or salt receiver, a 175 m high concrete tower, and a two-tank chloride salt system for thermal energy storage (TES). The power plants were simulated using SolarTherm to estimate their energy per year, capacity factor, and LCOE. The simulation was verified against the System Advisor Model (SAM), showing that the LCOE calculation differences are within ±1.0%. Results showed that the sodium-receiver system yields 69.60 USD/MWh real LCOE, versus 78.55 USD/MWh for the chloride salt system. Results also showed that sodium wins here due to a smaller and more efficient receiver, enabled by higher flux limits and reduced field size, leading to less mirror reflective area and site improvement cost.

capacity factor↗

Evaluating Liquid Waste Transfers and their Impacts to the SRS Tank Farm to Support Operations and Closure

The Liquid Waste (LW) contractor at the Savannah River Site, Savannah River Mission Completion (SRMC), supports the storage, processing, and safe disposition of legacy, radioactive liquid waste. The LW Tank Farms contain approximately 127 million liters (33.5 million gallons) of liquid waste within 43 active, underground waste tanks. To meet mission critical milestones for the closure of waste tanks and processing of 34 million liters (9 million gallons) of salt waste per year by the LW Salt Waste Processing Facility (SWPF), an increase in Tank Farm operations, including waste tank transfers, is required. Waste is compiled in salt and sludge batches in the Tank Farms and transferred to SWPF and the Defense Waste Processing Facility (DWPF) for treatment. All waste tank transfers, such as waste removal and batch compilation transfers, must be pre-evaluated to ensure Documented Safety Analysis (DSA) requirements are met via Evaluated Transfer Approval Forms (ETAFs). Facility conditions and configurations may change as a result of a waste transfer. These changes must be reflected in the Tank Farms Emergency Response Datasheet (ERD), which contains data utilized for operation and emergency situations.

Peterson, Shelby R.↗

Oxidation of Glycolate in the Defense Waste Processing Facility (DWPF) Recycle Collection Tank - 20305

The Savannah River Site's Defense Waste Processing Facility (DWPF) operations are being upgraded with the introduction of the Nitric-Glycolic Flowsheet. Glycolic acid has been shown superior to formic acid as the reducing acid used during chemical processing. The new flowsheet improves or maintains necessary parameters such as 1) reduction of mercury, 2) adjustment of feed rheology and 3) adjustment of melter oxidation/reduction potential. Further, the potential for catalytic hydrogen generation in DWPF processing is virtually eliminated. DWPF process condensates are collected and returned to the SRS Concentration, Storage and Transfer Facilities (CSTF). The Recycle Collection Tank (RCT) collects off-gas condensate during chemical processing, vitrification, and other unit operations performed in DWPF and is the singular return vessel delivering recycle effluent back to CSTF. Each batch of recycle may contain a small amount of glycolate from chemical processing and melter off-gas condensates. To avoid potential flammability issues due to thermolysis of glycolate in the CSTF, chemical oxidation within the RCT has been investigated as an option for mitigating the transfer of glycolate. Sodium permanganate has been down-selected as the best option for oxidation of glycolate. Testing was performed using both 2-L and 22-L reactors (16,800:1 and 1,530:1 scale by volume) with non-radioactive waste simulants to approximate the expected RCT compositions. RCT simulants were evaluated at various process pH and temperature conditions. Also, RCT operations, namely the sequence of addition of corrosion inhibitors (NaOH and NaNO{sub 2}) versus a permanganate strike, were evaluated. Glycolate was introduced via a sludge simulant to mimic both expected entrainment and abnormal process foam-over conditions - the range being between 68 and 5100 mg/kg glycolate. Glycolate destruction was monitored by ion chromatography (IC). The corresponding manganese behavior was monitored in real-time using in situ ultraviolet-visible (UV-Vis) spectroscopy. RCT glycolate content can be reduced to below the IC detection limit within 90 minutes for all concentrations investigated. Ion Chromatography analysis revealed that under alkaline conditions, glycolate is primarily oxidized to oxalate with no significant formation of CO{sub 2} or carbonate, and nitrite is not oxidized to nitrate. Initially, complete oxidation of organics species and nitrite was assumed. Determination of the mechanistic chemical reaction has allowed the required amount of permanganate to be more accurately predicted and the total addition to be significantly reduced. UV-Vis measurements reveal that permanganate (Mn{sup 7+}) is reduced to manganate (Mn{sup 6+}) in the RCT. The oxidant stoichiometry is defined by using the initial permanganate to glycolate (P/G) molar ratio. At low initial glycolate concentration (68 and 140 mg/kg), the minimum required initial permanganate to glycolate (P/G) molar ratio was found to be 5-6. With high initial glycolate concentrations (5100 mg/kg) a lower (P/G) molar ratio of ∼2.5 was needed. The final portion of this effort supporting the nitric/glycolic flowsheet will be to test actual (fully radioactive) RCT samples as per the above simulant tests. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Techno-Economic Analysis of Green Hydrogen Energy Storage in a Cryogenic Flux Capacitor

Abstract The Cryogenic Flux Capacitor (CFC) is a cold, dense energy storage core that is being studied in the cryo-compressed, about 300 bar and 80K, region of gaseous hydrogen (GH2) storage and liquid hydrogen (LH2) region near the normal boiling point. Hydrogen storage is improved by physically bonding the molecules within the nanoscale pores of the aerogel composite blanket material. The process of bonding or debonding is governed by principles of physical adsorption (physisorption) and thermodynamics. The large surface area afforded by the nanoporous aerogel (∼1,000 m2/g) allows its storage performance to easily exceed capacities of high-pressure GH2 storage for an equivalent volume. With the integrated aerogel, subscale tests have shown that storage is increased by about 36% over a simple tank filled with GH2 at the same operating temperature and pressure. For LH2 conditions, the CFC is shown to operate at improved densities, but testing is ongoing. For the techno-economic analysis (TEA), the source of hydrogen is compared between onsite steam methane reforming (SMR) and onsite solar photovoltaic (PV) panels providing power to electrolyzers to produce green GH2. The TEA compares pure hydrogen produced at a small scale for a 25 MW power system and at a large scale in a 500 MW power system. The system allowed for hydrogen imports and exports at a set price with a tank sized for 10 hours of power production. The two power producing technologies are a combined cycle gas turbine (CCGT) and hydrogen fuel cells. The SMR system uses natural gas as an input and includes a carbon capture and storage (CCS) system. The levelized cost of electricity (LCOE), levelized cost of hydrogen (LCOH), and levelized cost of storage (LCOS) are developed based on the capital cost and operating cost of the systems. The results are shown for current costs using a 2021 benchmark and DOE projections for cost improvements by 2030. The TEA showed that onsite hydrogen generation from SMR has an LCOH of about 1.4 to 2 USD per kg over the life of the plant and the PV hydrogen production LCOH is about 5.2 to 5.5 USD per kg. The LCOS of conventional GH2 systems is estimated to be $210/MWh and cost of storage for LH2 systems is $205/MWh for fuel cell systems and $249/MWh for CCGT systems. CFC improved the LCOS of all these systems to $198/MWh, $191/MWh and $233/MWh respectively. The LCOE also improved with conventional systems between $171/MWh and $228/MWh improved by CFC to between $167/MWh and $212/MWh. Using projections for improvement in costs following DOE’s goals by 2030, green hydrogen improved to as low as $78/MWh LCOS and LCOE for conventional cases. CFC improved over conventional storage with the lowest LCOS being $62/MWh and the lowest LCOE being $73/MWh. These results correspond to an LCOH of $2/kg. Finally, the TEA shows how LCOE is improved for hydrogen conditioning and storage over conventional systems and caverns in the 10 to 50 hour range.

08 HYDROGEN↗