Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Validation of Artemis I Aerothermal Design Models Using Developmental Flight Instrumentation

The inaugural flight of the Space Launch System (SLS) Block 1 launch vehicle, Artemis I, occurred on November 16, 2022, and featured a full suite of Developmental Flight Instrumentation (DFI) that provided aerothermodynamic measurements to assess thermal design and substantiate aerothermodynamic models. The Block 1 launch vehicle aerothermal instrumentation consisted of approximately 277 aerothermal gauges mounted throughout the Orion Multi-Purpose Crew Vehicle (MPCV), Integrated Spacecraft and Payload Element (ISPE), Core Stage (CS) and Solid Rocket Boosters (SRB) and an additional 179 thermal gauges on the Orion Crew Module (CM). Instrumentation included calorimeters, radiometers, pressure transducers, gas temperature probes, and thermocouples. Data was collected from lift-off through CS Main Engine Cut-Off (MECO). The flight data was invaluable for determining aerothermal model performance and developing flight-derived aerothermal environments for flight reconstruction thermal analysis and future SLS aerothermal models. The data offered critical insights into the aerothermodynamic conditions experienced during the launch and ascent of the SLS vehicle. This study compares the flight derived environments to pre-existing design models. The aerothermal models were constructed using MINIVER, the aerothermal engineering code which predicts aerodynamic heating and acts as an integration tool for incorporating databases from computational fluid dynamics (CFD) simulations and wind tunnel test data. The comparisons reveal the fidelity of the design models, highlighting areas where the design models accurately predicted flight conditions and instances where deviations were observed. Preliminary results suggest that while the design models largely aligned with the observed flight data, there were unique observations that reflected needed areas of model refinement. Aerothermal flight data from Artemis I for the SLS Block 1 vehicle will be further utilized to enhance the accuracy of Block 1B and Block 2 aerothermal models, ensuring improved safety and performance for subsequent Artemis missions.

aerothermodynamics↗

Analysis of Glint During the Artemis I Mission

Glint occurs when light reflects off a specular (mirror-like) surface. In the context of spacecraft, glinted light can land in places that may cause unintended negative effects. During the Artemis I mission in November and December of 2022, the Orion vehicle was configured intentionally to cause glint to occur to study its effect on the Orion electrical power system (EPS). With the vehicle in a nose-to-sun attitude, light was reflected off the crew module’s reflective skin and onto forward-pointed solar array wings (SAWs), producing more current than would result from direct solar flux alone. Along with this flight test, glint was unexpectedly observed several other times during the mission, primarily due to light reflecting from one SAW to another. The planned glint events helped to anchor the models previously used to study this phenomenon and to understand what parameters have the most significant impact on glinted current generation. With refined models, the SAW-to-SAW glint occurrences were studied with the goal of characterizing its potential impact on vehicle operation.

Photovoltaic↗

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston↗

NASA and ESA Partnership on the Multi-Purpose Crew Vehicle Service Module

(1) ESA decided in its Council Meeting in March 2011 to partially offset the European ISS obligations after 2015 with different means than ATVs; (2) The envisioned approach is based on a barter element(s) that would generate cost avoidance on the NASA side; (3) NASA and ESA considered a number of Barter options, NASA concluded that the provision by ESA of the Service Module for the NASA Multi-Purpose Crew Vehicle (MPCV) was the barter with the most interest;. (4) A joint ESA - NASA working group was established in May 2011 to assess the feasibility of Europe developing this Module based on ATV heritage; (5)The working group was supported by European and US industry namely Astrium, TAS-I and Lockheed-Martin; and (6) The project is currently in phase B1 with the objective to prepare a technical and programmatic proposal for an ESA MPCV-SM development. This proposal will be one element of the package that ESA plans submit to go forward for approval by European Ministers in November 2012.

Schubert, Kathleen E.↗

The Multi-purpose Crew Vehicle European Service Module: a European Contribution to Human Exploration

This paper provides an overview of the system and subsystem configuration of the MPCV European Service Module (ESM) at Preliminary Design Review (PDR) stage as well as its perspectives of utilisation within the global space exploration endeavour. The MPCV ESM is a cylindrical module with a diameter of 4500 mm and a total length - main engine excluded - of 2700 mm. It is fitted with four solar array wings with a span of 18.8 m. Its dry mass is 3.5 metric tons and it can carry 8.6 tons of propellant. The main functions of the European Service Module are to bring the structural continuity between the launcher and the crew module, to provide propulsion to the MPCV, to ensure its thermal control as well as electrical power and to store water, oxygen and nitrogen for the mission. The current agreement foresees the development and production by Europe of one flight model, with an option for a second one. This module will be assembled in Europe and delivered to NASA in 2016. It will be used for a flight of the MPCV Orion in December 2017.

Design↗

Hypervelocity Impact of Unstressed and Stressed Titanium in a Whipple Configuration in Support of the Orion Crew Exploration Vehicle Service Module Propellant Tanks

Hypervelocity impacts were performed on six unstressed and six stressed titanium coupons with aluminium shielding in order to assess the effects of the partial penetration damage on the post impact micromechanical properties of titanium and on the residual strength after impact. This work is performed in support of the definition of the penetration criteria of the propellant tanks surfaces for the service module of the crew exploration vehicle where such a criterion is based on testing and analyses rather than on historical precedence. The objective of this work is to assess the effects of applied biaxial stress on the damage dynamics and morphology. The crater statistics revealed minute differences between stressed and unstressed coupon damage. The post impact residual stress analyses showed that the titanium strength properties were generally unchanged for the unstressed coupons when compared with undamaged titanium. However, high localized strains were shown near the craters during the tensile tests.

Nahra, Henry K.↗

Hypervelocity Impact of Unstressed and Stressed Titanium in a Whipple Configuration in Support of the Orion Crew Exploration Vehicle Service Module Propellant Tanks

Hypervelocity impacts were performed on six unstressed and six stressed titanium coupons with aluminium: shielding in order to assess the effects of the partial penetration damage on the post impact micromechanical properties of titanium and on the residual strength after impact. This work is performed in support of the defInition of the penetration criteria of the propellant and oxidizer tanks dome surfaces for the service module of the crew exploration vehicle where such a criterion is based on testing and analyses rather than on historical precedence. The objective of this work is to assess the effects of applied biaxial stress on the damage dynamics and morphology. The crater statistics revealed minute differences between stressed and unstressed coupon damage. The post impact residual stress analyses showed that the titanium strength properties were generally unchanged for the unstressed coupons when compared with undamaged titanium. However, high localized strains were shown near the craters during the tensile tests.

Nahra, Henry K.↗

NASA AND ESA Partnership on the Multi-Purpose Crew Vehicle Service Module

In March 2011, NASA and ESA made a decision to partially offset the European obligations deriving from the extension of the ISS Program until the end of 2020 with different means than ATVs, following the ATV-5 mission foreseen in mid-2014. NASA and ESA considered a number of barter options, and concluded that the provision by ESA of the Service Module and Spacecraft Adaptor for the NASA Multi-Purpose Crew Vehicle (MPCV) was the barter element with the most interest. A joint ESA - NASA working group was established to assess the feasibility of Europe developing this Module based on ATV heritage. The working group was supported by European and US industry namely Astrium, TAS-I and Lockheed-Martin. This paper gives an overview of the results of the on-going study as well as its projected utilization for the global space exploration endeavour.

Free, James M.↗

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.↗

Vulnerability of Space Station Freedom Modules: A Study of the Effects of Module Perforation on Crew and Equipment: Analytical Modeling of Internal Debris Cloud Effects - Volume 2

In this part of the report, a first-principles based model is developed to predict the overpressure and temperature effects of a perforating orbital debris particle impact within a pressurized habitable module. While the effects of a perforating debris particles on crew and equipment can be severe, only a limited number of empirical studies focusing on space vehicles have been performed to date. Traditionally, crew loss or incapacitation due to a perforating impact has primarily been of interest to military organizations and as such have focused on military vehicles and systems. The module wall considered in this study is initially assumed to be a standard Whippletype dual-wall system in which the outer wall protects the module and its inhabitants by disrupting impacting particles. The model is developed in a way such that it sequentially characterizes the phenomena comprising the impact event, including the initial impact, the creation and motion of a debris cloud within the dual-wall system, the impact of the debris cloud on the inner wall, the creation and motion of the debris cloud that enters the module interior, and the effects of the debris cloud within the module on module pressure and temperature levels. This is accomplished through the application of elementary shock physics and thermodynamic theory.

Schonberg, William P.↗

Analysis of Ares Crew Launch Vehicle Transonic Alternating Flow Phenomenon

A transonic wind tunnel test of the Ares I-X Rigid Buffet Model (RBM) identified a Mach number regime where unusually large buffet loads are present. A subsequent investigation identified the cause of these loads to be an alternating flow phenomenon at the Crew Module-Service Module junction. The conical design of the Ares I-X Crew Module and the cylindrical design of the Service Module exposes the vehicle to unsteady pressure loads due to the sudden transition between a subsonic separated and a supersonic attached flow about the cone-cylinder junction as the local flow randomly fluctuates back and forth between the two flow states. These fluctuations produce a square-wave like pattern in the pressure time histories resulting in large amplitude, impulsive buffet loads. Subsequent testing of the Ares I RBM found much lower buffet loads since the evolved Ares I design includes an ogive fairing that covers the Crew Module-Service Module junction, thereby making the vehicle less susceptible to the onset of alternating flow. An analysis of the alternating flow separation and attachment phenomenon indicates that the phenomenon is most severe at low angles of attack and exacerbated by the presence of vehicle protuberances. A launch vehicle may experience either a single or, at most, a few impulsive loads since it is constantly accelerating during ascent rather than dwelling at constant flow conditions in a wind tunnel. A comparison of a windtunnel- test-data-derived impulsive load to flight-test-data-derived load indicates a significant over-prediction in the magnitude and duration of the buffet load. I. Introduction One

Sekula, Martin K.↗

Analysis of a Transonic Alternating Flow Phenomenon Observed During Ares Crew Launch Vehicle Wind Tunnel Tests

A transonic wind tunnel test of the Ares I-X Rigid Buffet Model (RBM) identified a Mach number regime where unusually large buffet loads are present. A subsequent investigation identified the cause of these loads to be an alternating flow phenomenon at the Crew Module-Service Module junction. The conical design of the Ares I-X Crew Module and the cylindrical design of the Service Module exposes the vehicle to unsteady pressure loads due to the sudden transition from separated to attached flow about the cone-cylinder junction with increasing Mach number. For locally transonic conditions at this junction, the flow randomly fluctuates back and forth between a subsonic separated flow and a supersonic attached flow. These fluctuations produce a square-wave like pattern in the pressure time histories which, upon integration result in large amplitude, impulsive buffet loads. Subsequent testing of the Ares I RBM found much lower buffet loads since the evolved Ares I design includes an ogive fairing that covers the Crew Module-Service Module junction, thereby making the vehicle less susceptible to the onset of alternating flow. An analysis of the alternating flow separation and attachment phenomenon indicates that the phenomenon is most severe at low angles of attack and exacerbated by the presence of vehicle protuberances. A launch vehicle may experience either a single or, at most, a few impulsive loads since it is constantly accelerating during ascent rather than dwelling at constant flow conditions in a wind tunnel. A comparison of a wind-tunnel-test-data-derived impulsive load to flight-test-data-derived load indicates a significant over-prediction in the magnitude and duration of the buffet load

Sekula, Martin K.↗

Examination of the Structural Response of the Orion European Service Module to Reverberant and Direct Field Acoustic Testing

The NASA Orion Multi-Purpose Crew Vehicle (MPCV), comprised of the Service Module, the Crew Module, and the Launch Abort System, is the next generation human spacecraft designed and built for deep space exploration. Orion will launch on NASAs new heavy-lift rocket, the Space Launch System. The European Space Agency (ESA) is responsible for providing the propulsion sub-assembly of the Service Module to NASA, called the European Service Module (ESM). The ESM is being designed and built by Airbus Safran Launchers for ESA. Traditionally, NASA has utilized reverberant acoustic testing for qualification of spaceflight hardware. The ESM Structural Test Article (E-STA) was tested at the NASA Plum Brook Stations (PBS) Reverberant Acoustic Test Facility in April-May 2016. However, Orion is evaluating an alternative acoustic test method, using direct field acoustic excitation, for the MPCVs Service Module and Crew Module. Lockheed Martin is responsible for the Orion proof-of-concept direct field acoustic test program. The E-STA was exposed to direct field acoustic testing at NASA PBS in February 2017. This paper compares the dynamic response of the E-STA structure and its components to both the reverberant and direct field acoustic test excitations. Advantages and disadvantages of direct field acoustic test excitation method are discussed.

Acoustics↗

Examination of the Structural Response of the Orion European Service Module to Reverberant and Direct Field Acoustic Testing

The NASA Orion Multi-Purpose Crew Vehicle (MPCV), comprised of the Service Module, the Crew Module, and the Launch Abort System, is the next generation human spacecraft designed and built for deep space exploration. Orion will launch on NASAs new heavy-lift rocket, the Space Launch System. The European Space Agency (ESA) is responsible for providing the propulsion sub-assembly of the Service Module to NASA, called the European Service Module (ESM). The ESM is being designed and built by Airbus Safran Launchers for ESA. Traditionally, NASA has utilized reverberant acoustic testing for qualification of spaceflight hardware. The ESM Structural Test Article (E-STA) was tested at the NASA Plum Brook Stations (PBS) Reverberant Acoustic Test Facility in April-May 2016. However, Orion is evaluating an alternative acoustic test method, using direct field acoustic excitation, for the MPCVs Service Module and Crew Module. Lockheed Martin is responsible for the Orion proof-of-concept direct field acoustic test program. The E-STA was exposed to direct field acoustic testing at NASA PBS in February 2017. This paper compares the dynamic response of the E-STA structure and its components to both the reverberant and direct field acoustic test excitations. Advantages and disadvantages of direct field acoustic test excitation method are discussed.

Acoustics↗

Lightning Instrumentation System

A new comprehensive lightning instrumentation system has been designed for the Mobile Launcher 1 (ML-1) at the Kennedy Space Center, Florida. This new instrumentation system includes the synchronized recording of three B-dot, 3-axis measurement stations, one D-dot sensor and eighteen vehicle measurement channels. Each vehicle measurement channel is comprised of two currents and one voltage measurements. The instrumentation system is composed of centralized transient recorders and digitizers, connected to the transient recorders via fiber optic cables. The transient recorders are triggered by the B-dot or D-dot sensors. When the Space Launch System (SLS) vehicle is present at the ML-1, the transient recorders record data on a dual sampling rate mode, continuous slow 5 kilo-samples per second (per channel) and event driven fast 100 mega-samples per second (per channel). Without the presence of the vehicle at the ML-1, the instrumentation system operates only as an event driven fast 100 mega-samples per second (per channel). In the absence of the vehicle, the only measurements recorded are the B-dot and D-dot stations. Additionally, a portable Lightning Monitoring System (LMS) is temporarily installed inside the Orion Crew Capsule module monitoring one portable B-dot, 3-axis measurement station, and 2 Crew Capsule BUS voltages. The portable LMS has a transient recorder independent of the ML-1 transient recorders, that is triggered by the portable B-dot sensor or transients on the vehicle BUS voltages. This portable instrumentation is removed while performing close out operations before the vehicle launch. For the ML-1 lightning instrumentation system, new custom B-dot and D-dot sensors were designed and prototypes were tested at the International Center for Lightning Research and Testing (ICLRT) at Camp Blanding, Florida. The Ground Special Power (GSP) vehicle measurement channels monitoring on the ML-1 is done via 1) Commercial off-the-shelf (COTS) current shunts and 2) custom Voltage Dividers. The new ML-1 lightning instrumentation system was designed, fabricated, deployed, and tested prior to the summer of 2019, in preparation for the first NASA's SLS mission to be launched from the Launch Complex 39B (LC-39B). The ML-1 lightning instrumentation was designed to complement the LC-39B lightning instrumentation system providing electromagnetic measurements closer to the vehicle, at different heights and inside the Crew capsule module.

Angel G Mata↗

STS-101: Crew Activity Report / Flight Day 5

The primary mission objective for STS-101 was to deliver supplies to the International Space Station, perform a space walk, and reboost the station from 230 statute miles to 250 statute miles. The commander of this mission was, James D. Haslsell. The crew was Scott J. Horowitz, the pilot, and mission specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. This videotape shows the activities of the fifth day of the mission. The day's activities started with the opening of the hatch to the space station. Helms and Usachev then opened the hatch to the station's Unity Connecting Module. The crew also placed ducting throughout the Zarya Control Module to improve air circulation and prevent problems with stale air. Helms and Usachev are shown replacing two of six batteries to be replaced in this mission in the Zarya module. The crew began moving supplies into the space station. There are several shots of the interior of the space station.

Source record↗