Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

High Pressure Hydrogen Nozzle Assembly and Dispenser for Heavy Duty Vehicles (Final Technical Report)

Electricore, Inc. along with partners Bennett Pump Company (Bennett), WEH Technologies, Inc. (WEH), National Renewable Energy Laboratory (NREL), and Quong & Associates, Inc. (QAI) have developed a high-pressure hydrogen nozzle assembly and dispenser for heavy-duty (HD) vehicles. The system was installed, tested and demonstrated at NREL’s Hydrogen Infrastructure Testing and Research Facility (HITRF). The system was designed to have a maximum operating pressure of 87.5 MPa and an approximate average flow rate of 10 kg/min over 10 minutes at fuel temperatures of -40°C. To further develop the specifications and design of the system, the team performed an industry survey to ensure the system met the needs of potential users.

08 HYDROGEN↗

Learning high-quality soldering

Soldering techniques for high-reliability electronic equipment are taught in 5 day course at NASA's Jet Propulsion Laboratory. Topic covered include new circuit assembly, printed-wiring board reworking, circuit changes, wire routing, and component installation.

Read, W. S.↗

Adjustable-Angle Drill Block

Adjustable angular drill block accurately transfers hole patterns from mating surfaces not normal to each other. Block applicable to transfer of nonperpendicular holes in mating contoured assemblies in aircraft industry. Also useful in general manufacturing to transfer mating installation holes to irregular and angular surfaces.

Gallimore, F. H.↗

Fixture For Calibrating Pressure Probe

Fixture in form of specially designed clamshell housing enables in situ calibration of pressure transducer mounted in body of pressure probe in wind tunnel. Includes two metal half shells machined with necks and matching cavities, when put together, define larger neck and cavity accommodating probe. Probe secured to bottom half shell by use of clamp before installing top half shell: necessary to follow sequence to protect probe during assembly. Clamshell calibration fixture attached to pressure probe in few minutes, making it possible to calibrate pressure transducer at convenient times. Calibrations performed before and after wind-tunnel runs each day, between runs in event of delays or suspected malfunctions, and essentially any other time, without having to remove probe from wind tunnel.

Ashby, George C., Jr.↗

STS-49 Endeavour/Compiled Video for Editors

Compiled footage includes shots taken of the rollout of Endeavour at Palmdale, CA, the departure and arrival of Endeavour for Kennedy Space Center (KSC), main engine three installation, solid rocket booster (SRB) segment lift and stack at the Vehicle Assembly Building (VAB), external tank mate to SRB, Intelsat rotation at the Vertical Processing Facility (VPF), Endeavour rollover from the Orbiter Processing Facility (OPF) to VAB, rollout to Pad B, and the flight readiness firing (FRF). The crew is seen during the Terminal Countdown and Demonstration Test (TCDT) training activities, at breakfast, suiting up, and exiting the Operations and Checkout (O&C) Building.

Source record↗

Space Station Power Generation in Support of the Beta Gimbal Anomaly Resolution

The International Space Station (ISS) is the largest and most complex spacecraft ever assembled and operated in orbit. The first U.S. photovoltaic (PV) module, containing two solar arrays, was launched, installed, and activated in early December 2000. After the first week of continuously rotating the U.S. solar arrays, engineering personnel in the ISS Mission Evaluation Room (MER) observed higher than expected electrical currents on the drive motor in one of the Beta Gimbal Assemblies (BGA), the mechanism used to maneuver a U.S. solar array. The magnitude of the motor currents continued to increase over time on both BGA's, creating concerns about the ability of the gimbals to continue pointing the solar arrays towards the sun, a function critical for continued assembly of the ISS. A number of engineering disciplines convened in May 2001 to address this on-orbit hardware anomaly. This paper reviews the ISS electrical power system (EPS) analyses performed to develop viable operational workarounds that would minimize BGA use while maintaining sufficient solar array power to continue assembly of the ISS. Additionally, EPS analyses performed in support of on-orbit BGA troubleshooting exercises is reviewed. EPS capability analyses were performed using SPACE, a computer code developed by NASA Glenn Research Center (GRC) for the ISS program office.

Delleur, Ann M.↗

Performance of Windows in Walls With Continuous Insulation

Window openings in walls are a significant contributor to poor thermal performance because of thermal bridging through the framing members (e.g., studs, joists, plates, bracing) and because windows lack the thermal properties of insulation. Window installation guidance for walls with continuous insulation (CI) is critical for continued market growth of this energy efficiency technology. This research project offers window manufacturers a starting point and a potential path toward developing installation instructions for windows over CI. The objectives of the research include evaluating the common method for installing windows in walls with CI, as well as establishing acceptance criteria for evaluating the performance of windows installed in walls with and without CI. The research measures: 1. The performance characteristics (e.g., water management, structural integrity) of windows in walls without CI. 2. The performance of different thicknesses and types of CI used in walls. 3. The performance of different types of window assemblies (e.g., double-hung windows, mulled double-hung windows, mulled casement windows, and slider windows) installed over CI. 4. The performance of window flange types (e.g., rigid mounting and less robust flanges) installed over CI. 5. Installing windows over CI using baseline installation instructions versus window manufacturer installation instructions. The project’s sequential testing protocol consists of the following: • A water penetration resistance testing adapted from two ASTM standards: E331 (uniform static air pressure in four steps) and E547 (cyclic static air pressure) • A temperature cycling adapted from ASTM E2264 Method B (convective hot air) • A service condition wind loading test adapted from ASTM E330 • A six-month vertical displacement observation phase prior to the structural performance testing • A final water penetration resistance test after vertical displacement observation • A structural performance test adapted from ASTM E330. Key research findings include: • The criterion for passing a water penetration resistance test is that there is no water overflowing at the interior face of the studs. If there is any bubbling or slight pooling of water at the sill, then it must recede after the pressure is removed. Excessive leakage and/or water leaking to the interior face of the framing around the window constitutes a failure. • All single double-hung windows installed directly to lumber or over oriented strand board passed all test protocols. • For most wall specimens, the test results showed that the use of foam sheathing did not affect the performance of the window for water leakage. • All wall specimens underwent temperature cycling. The results indicated that temperature cycling had little to no effect on windows installed over foam sheathing. • For wall specimens that underwent six-month vertical displacement monitoring, the results showed that windows installed over foam sheathing do not sag over time. • The single-hung and double-hung windows installed using window manufacturer installation instructions passed the structural performance test, compared to failures observed in windows that were installed using generic installation instructions. The generic and manufacturer installation methods differed on the following construction details: type of fasteners, fastening patterns on the flanges, and window shimming details. • Additional testing is required to determine methods to improve structural pressure performance of slider windows. Potential solutions that would require additional testing may include fastener spacing, different types of fasteners, masonry window clips, construction adhesive, foam sealant, stronger window flange material, and/or straps.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

STS-109 Flight Day 5 Highlights

On the fifth day of the STS-109 mission, the crewmembers and Commander Scott Altman of the Columbia Orbiter are shown in their servicing mission to the Hubble Space Telescope (HST). Selected footage is presented of the extravehicular activities (EVA) of Mission Specialists Jim Newman and Mike Massimino, who installed a new port solar array on the HST. Information is presented on the size and power capacity of the array. The reaction wheel assembly, one of four gyroscopic devices used to maneuver the HST, is also shown being replaced by the astronauts. A new insulation blanket panel was also installed at the end of the spacewalk because the astronauts had extra time.

Source record↗

Installation and checkout of the DOE/NASA Mod-1 2000-kW wind turbine generator

The Mod-1 machine was assembled without the blades, tested, and sent to the site at Boone, North Carolina for erection. The blades were transported directly to the site. A series of checkout tests were then conducted to evaluate performance and loads. The results of these tests compared well with the design data.

Puthoff, R. L.↗

Analysis of materials from MSFC LDEF experiments

In preparation for the arrival of the Long Duration Exposure Facility (LDEF) samples, a material testing and handling approach was developed for the evaluation of the materials. A configured lab was made ready for the de-integration of the LDEF experiments. The lab was prepared to clean room specifications and arranged with the appropriate clean benches, tables, lab benches, clean room tools, particulate counter, and calibrated and characterized analytical instrumentation. Clean room procedures were followed. Clean room attire and shoe cleaning equipment were selected and installed for those entering. Upon arrival of the shipping crates they were taken to the lab, logged in, and opened for examination. The sample trays were then opened for inspection and test measurements. The control sample measurements were made prior to placement into handling and transport containers for the flight sample measurements and analysis. Both LDEF flight samples and LDEF type materials were analyzed and tested for future flight candidate material evaluation. Both existing and newly purchased equipment was used for the testing and evaluation. Existing Space Simulation Systems had to be upgraded to incorporate revised test objectives and approaches. Fixtures such as special configured sample holders, water, power and LN2 feed-throughs, temperature measurement and control, front surface mirrors for reflectance and deposition, and UV grade windows had to be designed, fabricated, and installed into systems to achieve the revised requirements. New equipment purchased for LDEF analysis was incorporated into and/or used with existing components and systems. A partial list of this equipment includes a portable monochromator, enhanced UV System, portable helium leak detector for porosity and leak measurements, new turbo pumping system, vacuum coaster assembly, cryopumps, and analytical and data acquisition equipment. A list of materials tested, equipment designed, fabricated and installed, systems used, and analytical research accomplished on both LDEF flight samples and on similar materials which were lab tested for a comparative analysis to the LDEF flight samples is presented.

Johnson, R. Barry↗

A measurement of absolute efficiency of the ARAPUCA photon detector in liquid argon

In the Fall of 2017, two photon detector designs for the Deep Underground Neutrino Experiment (DUNE) Far Detector were installed and tested in the TallBo liquid argon (LAr) cryostat at the Proton Assembly (PAB) facility, Fermilab. The designs include two light bars developed at Indiana University and a photon detector based on the ARAPUCA light trap engineered by Colorado State University and Fermilab. The performance of these devices is determined by analyzing 8 weeks of cosmic ray data. The current paper focuses solely on the ARAPUCA device as the performance of the light bars will be reported separately. The article briefly describes the ARAPUCA concept, the TallBo setup, and focuses on data analysis and results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Theoretical Investigation of Oxidation Efficiency of a Volatile Removal Assembly Reactor Under Microgravity Conditions

Volatile Removal Assembly (VRA) is a subsystem of the Closed Environment Life Support System (CELSS) installed in the International Space Station. It is used for removing contaminants (volatile organics) in the wastewater produced by the space station crews. The major contaminants are formic acid, ethanol, and propylene glycol. The VRA contains a slim packbed reactor (3.5 cm diameter and four 28 cm long tubes in series) to perform catalyst oxidation of wastewater at elevated pressure and temperature under microgravity conditions. In the reactor, the contaminants are burned with oxygen gas (O2) to form water and carbon dioxide (CO2) that dissolves in the water stream. Optimal design of the reactor requires a thorough understanding about how the reactor performs under microgravity conditions. The objective of this study was to develop a mathematical model to interpret experimental data obtained from normal and microgravity conditions, and to predict the performance of VRA reactor under microgravity conditions. Catalyst oxidation kinetics and the total oxygen-water contact area control the efficiency of catalyst oxidation for mass transfer, which depends on oxygen gas holdup and distribution in the reactor. The process involves bubbly flow in porous media with chemical reactions in microgravity environment. This presents a unique problem in fluid dynamics that has not been studied. Guo et al. (2004) developed a mathematical model that predicts oxygen holdup in the VRA reactor. No mathematical model has been found in the literature that can be used to predict the efficiency of catalyst oxidation under microgravity conditions.

Guo, Boyun↗

Going Up. A GPS Receiver Adapts to Space

Current plans for the space station call for the GPS receiver to be installed on the U.S. lab module of the station in early 2001 (ISS Assembly Flight SA), followed by the attachment of the antenna array in late 2001 (Flight 8A). At that point the U.S. ISS guidance and control system will be operational. The flight of SIGI on the space station represents a "coming of age" for GPS technology on spacecraft. For at least a decade, the promise of using GPS receivers to automate spacecraft operations, simplify satellite design, and reduce mission costs has enticed satellite designers. Integration of this technology onto spacecraft has been slower than some originally anticipated. However, given the complexity of the GPS sensor, and the importance of the functions it performs, its incorporation into mainstream satellite design has probably occurred at a very reasonable pace. Going from providing experimental payloads on small, unmanned satellites to performing critical operational functions on manned vehicles has been a major evolution. If all goes as planned in the next few months, GPS receivers will soon provide those critical functions on one of the most complex spacecraft in history, the International Space Station.

Lightsey, E. Glenn↗

Apparatus for Testing Flat Specimens of Thermal Insulation

An apparatus has been developed to implement an improved method of testing flat-plate specimens of thermal-insulation materials for cryogenic application. The method includes testing under realistic use conditions that could include vacuum and mechanical loading at a pressure up to 70 psi (=0.48 MPa). The apparatus can accommodate a rigid or flexible specimen having thickness up to 1.25 in. (=3.2 cm) and diameters between 6 and 10 in. (about 15.2 and 25.4 cm, respectively). Typical test conditions include boundary temperatures between 77 K and 373 K and vacuum/interstitial gas filling at a pressure between 10(exp -6) torr (=1.3 x 10(exp -4) Pa) and 760 torr (atmospheric pressure =0.1 MPa). The interstitial gas could be N2, He, CO2, or any other suitable gas to which the insulation is expected to be exposed in use. Relative to prior apparatuses and testing methods, this apparatus and the testing method that it implements offer advantages of relative simplicity and ease of use. The basic principle of operation of the apparatus is that of boil-off calorimetry, using liquid nitrogen or any other suitable liquid that boils at a desired temperature below ambient temperature. Comparative rates of flow of heat through the thicknesses of the specimens (heat-leak rates) and apparent-thermal-conductivity values are obtained from tests of specimens. Absolute values of heat-leak rates and apparent thermal conductivities are computed from a combination of (1) the aforementioned comparative values and (2) calibration factors obtained by testing reference specimens of materials that have known thermal-insulation properties. The apparatus includes a full complement of temperature sensors, a vacuum pump and chamber, a monitoring and control system, and tools and fixtures that enable rapid and reliable installation and removal of specimens. A specimen is installed at the bottom of the vacuum chamber, and a cold-mass assembly that includes a tank is lowered into position above and around the specimen (see figure). A spring-based compensating fixture helps to ensure adequate thermal contact with possibly irregular specimen surfaces. For a high-compression test, the springs can be replaced with spacers. A flat circular load cell at the bottom of the chamber measures the compressive load on the specimen. Once the desired compressive-load, temperature, and vacuum/gas-filling conditions are established, testing begins. During a test, all measurements are recorded by use of a portable data-acquisition system and a computer. The total heat-leak rate is measured and calculated as the boil-off flow rate multiplied by the latent heat of vaporization. The parasitic heat leak (to the side of the specimen and to the top and side of the cold-mass tank) is reduced to a small fraction of the total heat leak by use of a combination of multilayer-insulation (MLI) shield rings, reflective film, a fiberglass/epoxy centering ring, and a bulk fill of aerogel beads. This combination eliminates the need for a cryogenic guard chamber used in a typical prior apparatus to reduce the parasitic heat leak.

Fesmire, James E.↗

International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the space environment forecast input to the ISS charging model indicates floating potentials (FP) within specified limits. These recommendations were based on the persistence of conditions in the space environment due to the current low solar cycle and belief in the accuracy and completeness of the ISS charging model. Subsequently, a Noncompliance Report (NCR), ISS-NCR-232G, Lack of Two-fault Tolerance to EVA Crew Shock in the Low Earth Orbit Plasma Environment, was signed in September 2013 specifying new guidelines for the use of shock hazard controls based on a forecast of the space environment from ISS plasma measurements taken prior to the EVA [ISS-EVA-312-AC, 2012]. This NESC assessment re-evaluates EVA charging hazards through a process that is based on over 14 years of ISS operations, charging measurements, laboratory tests, EMU studies and modifications, and safety reports. The assessment seeks an objective review of the plasma charging hazards associated with EVA operations to determine if any of the present hazard controls can safely change the PCU utilization plan to allow more flexibility in ISS operations during EVA preparation and execution.

Hernandez-Pellerano, Amri↗

Mars 2020 Maxon Commercial Motor Development from COTS to Flight Qualified Motors, Gearbox, and Detent Brake: Issues Overcome and Lessons Learned

Building on previous collaborations, maxon and the Jet Propulsion Laboratory (JPL) established a partnership to modify Ø20mm & Ø32mm Commerical-Off-The-Shelf (COTS) BrushLess Direct Current (BLDC) flat motors and a Ø22mm planetary gearbox.The commercial design was modified to meet the requirements for the Mars2020 rover, a Class B [1], Martian surface environment, interplanetary mission, whilst maintain as much of the industrial heritage as possible. Despite numerous problems encountered during the development, these were all overcome and qualification of the design and acceptance testing for the 10 Flight Model (FM) actuators that were installed on the Mars2020 rover was completed on-time for the rover assembly schedule.

Loschiavo, Michael↗

Development of a machine vision system for automated structural assembly

Research is being conducted at the LaRC to develop a telerobotic assembly system designed to construct large space truss structures. This research program was initiated within the past several years, and a ground-based test-bed was developed to evaluate and expand the state of the art. Test-bed operations currently use predetermined ('taught') points for truss structural assembly. Total dependence on the use of taught points for joint receptacle capture and strut installation is neither robust nor reliable enough for space operations. Therefore, a machine vision sensor guidance system is being developed to locate and guide the robot to a passive target mounted on the truss joint receptacle. The vision system hardware includes a miniature video camera, passive targets mounted on the joint receptacles, target illumination hardware, and an image processing system. Discrimination of the target from background clutter is accomplished through standard digital processing techniques. Once the target is identified, a pose estimation algorithm is invoked to determine the location, in three-dimensional space, of the target relative to the robots end-effector. Preliminary test results of the vision system in the Automated Structural Assembly Laboratory with a range of lighting and background conditions indicate that it is fully capable of successfully identifying joint receptacle targets throughout the required operational range. Controlled optical bench test results indicate that the system can also provide the pose estimation accuracy to define the target position.

Sydow, P. Daniel↗