Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINEAR ACCELERATOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Efficiency, Power Loss, and Power Factor Measurement of Quadrupole Magnet Power Supplies at the Spallation Neutron Source

The linear accelerator (LINAC) quadrupole magnets are powered by 42 silicon-controlled rectifier (SCR) based power supplies at the Spallation Neutron Source (SNS) facility of Oak Ridge National Laboratory. These 35V, 525A power supplies are bulky, inefficient and require both air and water cooling. The reliability of the SNS facility is impacted due to water leaks internal to power supplies and current readback issues associated with their unique control system interface, resulting in multiple downtime events. Hence, an alternate solution is necessary for the continued reliable operation of the SNS. To mitigate the above-mentioned problems, this paper proposes the use of off-the-shelf Switch Mode Power Supplies (SMPS) rated for 20V, 500A with serial control interface. These SMPS are air-cooled, more efficient and more compact owing to their switching speeds of approximately 160 kHz. The performance enhancements of the SMPS in comparison with the existing SCR power supply are discussed in detail in this paper. The features of the SMPS, along with experimental results for both power supplies, like efficiency, power losses and stability, are presented. Ongoing work is also discussed.

Harave, Sudarshan↗

Study on Electropolishing Conditions for 650 MHz Niobium SRF Cavity

The PIP II linear accelerator includes different types of niobium SRF cavities including 650 MHz elliptical low (0.61) and high (0.92) beta cavities. The elliptical cavity surface is processed with the electropolishing method. The elliptical cavities especially the low-$\beta$ 650 MHz cavities showed a rough equator surface after the EP was per-formed with the standard EP conditions. This work was focused to study the effect of different EP parameters, including cathode surface area, temperature and voltage, and optimize them to improve the cavity surface.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

140,142 Ce Neutron Cross Section Resolved Resonance Region Evaluation [Abstract]

A resolved resonance region evaluation of 140,142 Ce has been carried out by Oak Ridge National Laboratory. Requested by the US Nuclear Criticality Safety Program, this evaluation is based on recent high-resolution transmission and capture high-resolution measurements of nat Ce and 142 Ce conducted at JRC-GEEL at the Geel Linear Accelerator facility, as well as recently measured thermal constants available from the EXFOR database. Starting from the resonance parameters from the ENDF/B-VIII.0 library and following a preliminary R-matrix analysis, an updated set of resonance parameters and corresponding covariance information was derived by the fit of these experimental datasets using the Reich-Moore approximation of the R-matrix theory as implemented in the SAMMY code system. The resolved resonance region upper energy limit for 140 Ce was kept at 200 keV while the 142 Ce resonance region was extended from 13 to 26 keV. This new evaluation was found to be in good agreement not only with several integral quantities of interest to the reactor physics community, but also with the stellar Maxwellian-averaged cross section.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Radiation Shielding Analysis for the PIP-II Linac at Fermilab

The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratory’s experiments. An 800-MeV superconducting linear accelerator—a centerpiece of the project—is currently under construction in Batavia, Illinois (USA). After completion, the superconducting linac will be the starting point for the 1.2 MW (Phase 1) and 2.4-MW (Phase 2) proton beam that is needed for the Long-Baseline Neutrino Facility (LBNF) at Fermilab [2]. Due to unavoidable loss of a fraction of the beam in the accelerator components, a certain level of radiation will be generated in the accelerator tunnel both during normal operation and at accidents. This work deals with radiation shielding design for the accelerator facility.

Rakhno, Igor↗

E-Beam Irradiation Beamline at Jefferson Lab for Wastewater Treatment

Electron beam (e-beam) irradiation is an advanced method for removing the emerging organic contaminants in wastewater, such as 1,4-dioxane, and per- and polyfluoroalkyl sub?stances (PFAS), which have the potential to be regulated in the near future but are difficult to degrade by conventional treatment methods. This dissertation was based on a collabo?rating study between Jefferson Lab (Jlab) and Hampton Roads Sanitation District (HRSD) to evaluate the impacts of e-beam irradiation on the degradation of 1,4-dioxane and PFAS. It presents the detailed design of an e-beam irradiation beamline, the beamline simulation using general particle tracer (GPT), the installation, and the successful commissioning. The beamline is an extended section to the Upgraded Injector Test Facility (UITF) at Jlab, which is a continuous wave (CW), superconducting radio frequency (SRF) linear accelerator with an energy up to 10 MeV. To let the sample volume receive a significant and uniform dose distribution, the sample target was designed by investigating the dose distribution simulated with a Monte-Carlo code, FLUKA. The optimized beam energy was 8 MeV and the beam current for irradiation was ? 100 nA. With the use of a solenoid and a raster, the electron beam was expanded to the optimized size, 1? ? 15 mm, at the sample target. This dis?sertation also presents the irradiation experiments for 64 1,4-dioxane samples and 48 PFAS samples in different water matrices, including real wastewater, which were prepared and an?alyzed by HRSD. The absorbed doses of samples were obtained by designing a new method that combines the FLUKA simulation and dose mapping experiments. The irradiation re?sults showed that around 95% of 1,4-dioxane was removed at a low dose of ? 2 kGy, and PFAS was possibly removed at a lower dose compared to similar research. This work is a first implementation of SRF technology for wastewater irradiation. It pro?vides a valuable new research platform for wastewater remediation. This will be in support of future industrial applications of advanced SRF technologies and better understanding of the effect of e-beam irradiation on wastewater or water treatment.

Li, Xi↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

Beam Loss Monitoring with Fixed and Translating Scintillation Detectors Along the Fermilab Drift-tube Linac

The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac (DTL), which in its current state, suffers from a lack of instrumentation along its length. As a result, operational staff do not have access to the diagnostic information needed to tune the critical components of this accelerator, such as the quadrupole magnets within the drift tubes. This work presents an effort to utilize both fixed and translating scintillation detectors to investigate beam loss along the first two cavities of the DTL.

43 PARTICLE ACCELERATORS↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

43 PARTICLE ACCELERATORS↗

Exploring the Dynamics of Transverse Inter-planar Coupling in the Superconducting Section of the PIP-II LINAC

This study investigates the crucial role that an accurate understanding of inter-planar coupling in the transverse plane plays in regulating charged particle dynamics in a high intensity linear accelerator and minimizing foil/septum impacts during injection from the linac to a ring. We performed an in-depth analysis for the emergence and evolution of trans verse inter-planar coupling through multiple active lattice elements, taking into account space charge and field nonlinearities in the superconducting section of the PIP-II linac. The article compares various analytical, numerical, and experimental techniques for measuring transverse coupling using beam and lattice matrices and provides insight into effective strategies for its mitigation prior to ring injection.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Simulation of the Photoionization of H- Together with the Subsequent Tracking of the Liberated Electrons

The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection into the existing Booster ring. Measurements of the profile of the beam along the LINAC must be done by non-intercepting methods due to the superconducting cavities. The method chosen is photoionization of a small number of H- by a focused infrared laser, aka laserwire. The number of ionized electrons is measured as a function of laser position within the H- beam. To aid in the design of the collection mechanism, a simulation was written in MATLAB with input from the commercial electromagnetic simulation, CST. This simulation calculates the number and positions of the liberated electrons and tracks them through the magnetic collection and H- beam fields to the collection point. Results from this simulation for various points along the LINAC will be shown.

43 PARTICLE ACCELERATORS↗

Final Physics Design of Proton Improvement Plan-II At Fermilab

This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice design, specifically targeting collective effects, parametric resonances, and space charge nonlinearities that impact beam stability and emittance control. The strategies implemented effectively mitigate space charge complexities, resulting in significant improvements in beam quality -- evidenced by reduced emittance growth, lower beam halo, decreased loss, and better energy spread management. This comprehensive study is pivotal for the PIP-II project's success, providing valuable insights and approaches for future accelerator designs, especially in managing nonlinearities and enhancing beam dynamics.

43 PARTICLE ACCELERATORS↗

Warm Unit Stand Analysis for Proton Improvement Project II

The Proton Improvement Project II, commonly referred to as PIP II, is a linear accelerator overhaul at Fermilab to eventually double the output of its existing proton beam to continue to be the leading force in high energy physics. The proton beam is created through a series of high frequency cryomodules that must be connected utilizing a combination of magnets and vacuum pumps to ensure the beam is properly aligned. A housing mechanism for the magnets and vacuum pumps (Warm Units) will be placed between the cryomodules for realignment and require multiple stages of 6 degree-of-freedom adjustment options, to ensure that the beam alignment can fit all realistic requirements. Extensive testing and design modifications on the Warm Unit stand was completed to confirm not only the strength of the unit in nominal configuration, but also at each possible adjustment orientation for each 6 degree-of-freedom option. Structural analysis was also completed for various unique loading conditions i ncluding transportation loading and confirming the unit satisfies international building code. Simultaneously, testing and design modifications were done to confirm that the frequency modes of the system resided outside of concern ranges, which is determined by Fermilab safety codes and is set to exceed 15 Hz. Design changes that simultaneously stiffen the system to raise the lowest frequency modes while expanding access for technicians and allow for easier fabrication were developed and implemented into the Warm Unit stand. Various relationships between the design changes and the overall vibrational patterns were also developed for future use and study as the rest of PIP II matures.

43 PARTICLE ACCELERATORS↗

Warm Unit Stand Assembly and Testing for Proton Improvement Plan - II

The Proton Improvement Project II (PIP II), situated at Fermilab, signifies a critical advancement in the realm of high-energy physics. PIP II, a linear accelerator renovation endeavor, aspires to double the output of the existing proton beam, reinforcing Fermilab’ s position as a vanguard in this field. The proton beam's creation involves a series of high-frequency cryomodules, necessitating environmental temperature arrays of magnets and vacuum pumps henceforth described as ‘Warm Units.’ The Warm Units include design features of : 1. insertion between the cryomodules, 2. multi-stage adjustments in six degrees of freedom to ensure precise beam alignment; 3. Natural frequency modes that avoid specified ranges. In adherence to Fermilab’ s stringent safety standards, comprehensive testing procedures are slated to validate the Warm Units' capacity to simultaneously achieve local alignment adjustments while averting low-frequency oscillation less than 15 Hertz. The testing regimen will scrutinize the Warm Units' alignment adjustment capabilities and their resilience against low-frequency oscillations, with an overarching objective of satisfying the Final Design Review criteria specific to the PIP II initiative. This project works to furnish technicians responsible for the assembly of Warm Units with a comprehensive guide for successful installation, concurrently documenting any requisite design modifications essential for achieving a real-world configuration.

43 PARTICLE ACCELERATORS↗

Isotope Production Education and Research via a Systematic Study of Photo-nuclear Reaction Yields and Excitation Functions

A new collaboration between the New Mexico Institute of Mining and Technology, Idaho State University, and Idaho National Laboratory builds the domestic workforce in isotope production and related science and technologies by conducting research and education programs related to photo-nuclear reactions. Workforce development was identified by the Department of Energy’s Office of Science in the Reaching a New Energy Sciences Workforce (RENEW) program that seeks to engage underrepresented university students in isotope production activities. This collaboration includes coursework development, student training, and isotope production research utilizing photo-nuclear reactions at electron linear accelerators. Bremsstrahlung-weighted excitation functions and cross-sections will be measured and the use of nanomaterials to exploit kinematic recoil reactions will be investigated. Students will be hosted at the Idaho National Laboratory where mentors will provide opportunities to explore careers in nuclear science and technology. This presentation regards the ongoing progress of the research and education objectives of the collaboration that was performed under the Office of Science Isotopes Program under award number D000-22-2765.

07 ISOTOPE AND RADIATION SOURCES↗

Third-integer Resonant Extraction Regulation System for Mu2e

A third-integer resonant slow extraction system is being developed for Fermilab's Delivery Ring to deliver protons to the upcoming Mu2e experiment. The timescale of the extraction (or spill) duration is 43 milliseconds, which is extremely short and unprecedented. Additionally, the experiment's strict and challenging requirements on the quality of the spill at this time scale has led to the development of a new Spill Regulation System (SRS) design. The SRS primarily consists of three components - slow regulation, fast regulation, and harmonic content suppressor. Contributions to the first two components of the SRS, i.e., Slow Regulation and Fast Regulation subsystems, will be presented in which new adaptive learning algorithm schemes for the slow regulation of the spill -- validated using particle tracking simulations -- shall be described. In addition to these novel methods for the enhancement of the spill regulation system, results of employing Machine Learning in enhancing the performance of the resonant extraction are also presented. At the forefront of applying ML techniques to solve non-linear accelerator control problems, this work includes optimizing the PID gains as well as the replacement of the traditional PID controller using Recurrent Neural Networks and Gated Recurrent Unit (GRU) ML models to achieve efficiencies greater than a PID controller. Cutting-edge on-going Reinforcement Learning efforts, including an actor-critic family of learning algorithms, to regulate the spill rate will be reviewed, as well as present analytical calculations pertaining the transit time of particles in a third-integer resonant extraction. Detailed numerical investigations and validations of such calculations, the model of which could be exported and reliably used in future analytical modeling of any resonant extraction, are discussed.

43 PARTICLE ACCELERATORS↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign, an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real-time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB650 CM.

Yoon, S. [Fermilab]↗

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]↗