Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

A Causal Approach to Integrate Component Health Data into System Reliability Models

Two of the challenges of current plant reliability approaches are the ability to integrate plant health data, and to support decision making. Condition based data and diagnostic/prognostic information are in fact not considered into plant reliability models to inform system engineers on the most critical components. Currently, the propagation of quantitative health data from the component to the system level is a challenge given the diverse nature/structure of the data. On the other hand, plant reliability methods (which are typically based on fault-trees or reliability block diagrams) can effectively propagate data from the component to the system level, but values of failure rates or failure probabilities are an approximated integral representation of the past industry-wide operational experience, and it neglects the present component health status (e.g., diagnostic and condition-based data) and health projection (when available from prognostic data). Our first claim is that system reliability models should propagate health information from the component to the system/plant level in order to provide a quantitative snapshot of system/plant health and identify the most critical components. Our second claim is that component health should be informed solely by that specific component current and historical performance data and should not be an approximated integral representation of the past industry-wide operational experience. This paper is directly supporting these two claims by proposing a different approach to perform reliability modeling which relies on available component diagnostic, prognostic and condition-based data to measure component health, and it propagates this information through fault tree models. The propagation of health data from the component to the system level is performed not in terms of probability, but in terms of margins where margin is defined as the “distance” between the present actual status and an undesired event (e.g., failure or unacceptable performance). Through a cause-effect lens, while classical reliability models target the effect associated to a component performance, a margin-based approach focuses on the cause of an undesired component performance (i.e., component health). Hence, thinking of reliability in terms of margins implies decision making based on causal reasoning. We will show how fault tree models can be solved using a margin language and how this process can effectively assist system engineers to identify the most critical components.

97 MATHEMATICS AND COMPUTING↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integration of Condition-Based, Diagnostic, Prognostic, And Anomaly Detection Data into Reliability Models to Support a Predictive Maintenance Context

Reliability data employed in plant reliability models are an approximated integral representation of the past industrywide operational experience, and they neglect the present asset health status (available, for example, from online monitoring data and diagnostic assessments) and forecasted health projection (when available from prognostic models). Ideally, in a predictive maintenance context, system reliability models should support decision making by propagating actual health information from the asset to the system level in order to provide a quantitative snapshot of system health and identify the most critical assets. Asset health should be informed solely by that specific asset’s current and historical performance data and should not be an approximated integral representation of the past industrywide operational experience (as currently performed by system reliability models through Bayesian updating processes). This paper proposes a reliability modeling approach that relies on asset diagnostic and prognostic assessments, along with monitoring data to measure asset health. We show how state-of-the art condition-based, diagnostic, prognostic, and anomaly detection models can be linked to system reliability models not in probability terms, but in terms of margin where margin is defined as the “distance” between the present status and an undesired event (e.g., failure or unacceptable performance). Then, we show how the propagation of margin data from the asset to the system level is performed through classical reliability models such as fault trees or reliability block diagrams. The described method is in fact able to propagate heterogenous health data from the asset to the system level in order to analytically assess system health.

97 MATHEMATICS AND COMPUTING↗

A new solid state extractor pulser for the FNAL magnetron ion source

A new solid state extractor pulser has been installed on the Fermi National Accelerator Laboratory (FNAL) magnetron ion source, replacing a vacuum tube style pulser that was used for over 40 years. The required ion source extraction voltage is 35 kV for injection into the radio frequency quadrupole. At this voltage, the old pulser had a rise time of over 150 μs due to the current limit of the vacuum tube. The new solid state pulsers are capable of 50 kV, 100 A peak current pulses and have a rise time of 9 μs when installed in the operational system. This paper will discuss the pulser design and operational experience to date.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An apparatus for studying electrical breakdown in liquid helium at 0.4 K and testing electrode materials for the neutron electric dipole moment experiment at the Spallation Neutron Source

In this study, we have constructed an apparatus to study DC electrical breakdown in liquid helium at temperatures as low as 0.4 K and at pressures between the saturated vapor pressure and ~600 Torr. The apparatus can house a set of electrodes that are 12 cm in diameter with a gap of 1–2 cm between them, and a potential up to ±50 kV can be applied to each electrode. Initial results demonstrated that it is possible to apply fields exceeding 100 kV/cm in a 1 cm gap between two electropolished stainless steel electrodes 12 cm in diameter for a wide range of pressures at 0.4 K. We also measured the current between two electrodes. Our initial results, I < 1 pA at 45 kV, correspond to a lower bound on the effective volume resistivity of liquid helium of ρ V > 5 × 10 18 Ω cm. This lower bound is 5 times larger than the bound previously measured. Finally, we report the design, construction, and operational experience of the apparatus, as well as initial results

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advancing global change biology through experimental manipulations: Where have we been and where might we go?

Abstract This commentary summarizes the publication history of Global Change Biology for works on experimental manipulations over the past 25 years and highlights a number of key publications. The retrospective summary is then followed by some thoughts on the future of experimental work as it relates to mechanistic understanding and methodological needs. Experiments for elevated CO 2 atmospheres and anticipated warming scenarios which take us beyond historical analogs are suggested as future priorities. Disturbance is also highlighted as a key agent of global change. Because experiments are demanding of both personnel effort and limited fiscal resources, the allocation of experimental investments across Earth's biomes should be done in ecosystems of key importance. Uncertainty analysis and broad community consultation should be used to identify research questions and target biomes that will yield substantial gains in predictive confidence and societal relevance. A full range of methodological approaches covering small to large spatial scales will continue to be justified as a source of mechanistic understanding. Nevertheless, experiments operating at larger spatial scales encompassing organismal, edaphic, and environmental diversity of target ecosystems are favored, as they allow for the assessment of long‐term biogeochemical feedbacks enabling a full range of questions to be addressed. Such studies must also include adequate investment in measurements of key interacting variables (e.g., water and nutrient availability and budgets) to enable mechanistic understanding of responses and to interpret context dependency. Integration of ecosystem‐scale manipulations with focused process‐based manipulations, networks, and large‐scale observations will aid more complete understanding of ecosystem responses, context dependence, and the extrapolation of results. From the outset, these studies must be informed by and integrated with ecosystem models that provide quantitative predictions from their embedded mechanistic hypotheses. A true two‐way interaction between experiments and models will simultaneously increase the rate and robustness of Global Change research.

Hanson, Paul J.↗

Solutions for management of defective fuel assemblies - 15318

Defective fuel management is a major challenge for nuclear operators when the time comes for finding a long-term solution for their used (or spent) fuel assemblies. This question of defective fuel management can be raised in several cases: - For optimizing the remaining operating costs of shutdown reactors, the spent fuel pools must be emptied as soon as possible; a solution needs therefore to be found for evacuating all the spent fuel assemblies, defective fuel assemblies and in particular defective fuel rods included; - Some utilities are today facing a saturation of their reactor spent fuel pool; evacuating the defective fuel assemblies and extracted defective fuel rods allows optimizing the space in the pool. Whereas the solutions for managing intact used fuel assemblies are well-known, a specific technical solution must be implemented for managing the defective spent fuel assemblies as well. The purpose of this paper is to describe the existing solutions for the management of all types of defective fuel assemblies. Interim Dry Storage Solution Interim dry storage of defective spent fuel assemblies is being implemented for decades in the USA. Specific operations are performed for preparing the defective fuel assemblies for interim dry storage and they are then stored with intact used fuel assemblies in the dry storage cask. The advantage of such a solution is its short-term cost effectiveness. The paper presents the existing dry interim storage solutions for defective used fuel rods, the way they are implemented, the associated operational experience. Long-term Dry Storage Solution A long-term dry storage solution for defective fuel assemblies is being developed, compliant with direct disposal requirements. The solution is based on the encapsulation of each defective fuel rod into a fuel rod capsule and an associated specific dry storage licensing approach: this is the best available technology regarding long term storage safety requirements. The paper presents this unique capsule technology, the transport and storage casks that can be used for transportation of defective fuel rods to the storage facility, and the associated transport licensing approach currently used in Europe. Treatment Solution. The most definitive way to get rid of defective fuel assemblies is their treatment (or reprocessing) in a treatment plant. There is then no need to assess the behaviour of these specific used fuel assemblies as for an interim storage facility or a final repository. The advantage of such a solution is its sustainable approach. The paper presents the existing transport and treatment solutions, the way they are implemented, the associated operational experience. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation of argon response and light detection in the DarkSide-50 dual phase TPC

A Geant4-based Monte Carlo package named G4DS has been developed to simulate the response of DarkSide-50, an experiment operating since 2013 at LNGS, designed to detect WIMP interactions in liquid argon. In the process of WIMP searches, DarkSide-50 has achieved two fundamental milestones: the rejection of electron recoil background with a power of ~10 7 , using the pulse shape discrimination technique, and the measurement of the residual 39 Ar contamination in underground argon, ~3 orders of magnitude lower with respect to atmospheric argon. These results rely on the accurate simulation of the detector response to the liquid argon scintillation, its ionization, and electron-ion recombination processes. This work provides a complete overview of the DarkSide Monte Carlo and of its performance, with a particular focus on PARIS, the custom-made liquid argon response model.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

Objectives-driven↗

APPLICATION OF OBJECTIVES-DRIVEN ASSURANCE CASES TO SYSTEM DEVELOPMENT IN AN EVOLVING ACQUISITION MODEL

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

Mark-18A Target Material Recovery Program: Initial Hot Startup

The Savannah River National Laboratory (SRNL) has been tasked by the National Nuclear Security Administration to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The Mk-18A targets were manufactured with Pu-242 then irradiated under high neutron flux in K-Reactor at the SRS from 1968 to 1978. The sixty-five Mk-18A targets are currently stored in the SRS L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The original targets were manufactured with varying quantities of Pu-242, ranging from 5.2 grams to 121.5 grams. Taking a graded approach to process start up, the lowest loaded target (FT-80-03) was selected as the first target to be received and processed at SRNL. As operational experience and knowledge is gained from processing targets, higher loaded targets will be selected for processing to increase the quantities of valuable isotopes recovered. Due to dose concerns, the receipt and processing of the Mk-18A targets is performed in the SRNL Shielded Cells Facility. The targets are stored in a double J-can confinement in the L-Area Basin. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets are loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 length) are then processed one at a time through the following processes: caustic dissolution and filtration, acidic dissolution and filtration, elutable Reillex anion exchange, diglycolamide (DGA) resin extraction, and DGA calcination. This processing results in two product streams. The first is an aqueous plutonium solution which is removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide product containing the Am and Cm as well as other lanthanide fission products which is removed from the shielded cells using a bagless transfer system. Both materials are packaged for shipment to Oak Ridge National Laboratory (ORNL). This paper will discuss the operating experience, lessons learned, and results from initial process hot startup.

Armstrong, Christopher [Savannah River National La↗

Light Scalars at FASER

FASER, the ForwArd Search ExpeRiment, is a currently operating experiment at the Large Hadron Collider (LHC) that can detect light long-lived particles produced in the forward region of the LHC interacting point. In this paper, we study the prospect of detecting light CP-even and CP-odd scalars at FASER and FASER 2. Considering a model-independent framework describing the most general interactions between a CP-even or CP-odd scalar and SM particles using the notation of coupling modifiers in the effective Lagrangian, we develop the general formalism for the scalar production and decay. We then analyze the FASER and FASER 2 reaches of light scalars in the large tan β region of the Type-I two Higgs double model as a case study, in which light scalars with relatively long lifetime could be accommodated. In the two benchmark scenarios we considered, the light (pseudo)scalar decay length varies in (10 –8 , 10 5 ) meters. Both FASER and FASER 2 can probe a large part of the parameter space in the large tan β region up to 10 7 , extending beyond the constraints of the other existing experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Lepton-flavor-violating ALP signals with TeV-scale muon beams

We explore the feasibility of using TeV-energy muons to probe lepton-flavor-violating (LFV) processes mediated by an axion-like particle (ALP) a with mass O(10 GeV). We focus on µτ LFV interactions and assume that the ALP is coupled to a dark state χ, which can be either less or more massive than a. Such a setup is demonstrated to be consistent with χ being a candidate for dark matter, in the experimentally relevant regime of parameters. We consider the currently operating NA64-µ experiment and proposed FASERν2 detector as both the target and the detector for the process µA → τA a, where A is the target nucleus. We also show that a possible future active muon fixed-target experiment operating at a 3 TeV muon collider or in its preparatory phase can provide an impressive reach for the LFV process considered, with future FASERν2 data providing a pilot study towards that goal. The implications of the muon anomalous magnetic moment (g - 2) µ measurements for the underlying model, in case of a positive signal, are also examined, and a sample UV completion is outlined.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Final results of an experiment in operational forecasting of sea breeze thunderstorms using a mesoscale numerical model

Sea breeze thunderstorms during quiescent synoptic conductions account for 40 percent of Florida rainfall, and are the dominant feature of April-October weather at the Kennedy Space Center (KSC). An effort is presently made to assess the feasibility of a mesoscale numerical model in improving the point-specific thunderstorm forecasting accuracy at the KSC, in the 2-12 hour time frame. Attention is given to the Applied Regional Atmospheric Modeling System.

Lyons, Walter A.↗