Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning and Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Using Residential and Office Building Archetypes for Energy Efficiency Building Solutions in an Urban Scale: A China Case Study

Building energy consumption accounts for 36% of the overall energy end use worldwide and is growing rapidly as developing countries continue to urbanize. Understanding the energy use at urban scale will lay the foundation for identification of energy efficiency opportunities to be deployed at speed. China has almost half of global new constructions and plays an important role in building suitability. However, an open source national building energy consumption database is not available in China. To provide data support for building energy consumptions, this paper used a simulation method to develop an urban building energy consumption database for a pilot city in Wuhan, China. First, residential, small, and large office building archetype energy models were created in EnergyPlus to represent typical building energy consumption in Wuhan. The baseline reference model simulation results were further validated using survey data from the literature. Second, stochastic simulations were conducted to consider different design parameters and occupants’ energy usage intensity scenarios, such as thermal properties of the building envelope, lighting power density, equipment power density, HVAC (heating, ventilation and air conditioning) schedule, etc. A building energy consumption database was generated for typical building archetypes. Third, data-driven regression analysis was conducted to support quick building energy consumption prediction using key high- level building information inputs. Finally, a web-based urban energy platform and an interface were developed to support further third-party application development. The research is expected to provide fast energy efficiency building design solutions for urban planning, new constructions as well as building retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Anomaly Detection in Accelerator Facilities Using Machine Learning

Synchrotron light sources are user facilities and usually run about 5000 hours per year to support many beamlines operations in parallel. Reliability is a key parameter to evaluate machine performance. Even many facilities have achieved >95% beam reliability, there are still many hours of unscheduled downtime and every hour lost is a waste of operation costs along with a big impact on individual scheduled user experiments. Preventive maintenance on subsystems and quick recovery from machine trips are the basic strategies to achieve high reliability, which heavily depends on experts’ dedication. Recently, SLAC, APS, and NSLS-II collaborated to develop machine-learning-based approaches aiming to solve both situations, hardware failure prediction and machine failure diagnosis to find the root sources. In this paper, we report our facility operation status, development progress, and plans.

Accelerator Physics↗

AMPP-4 Metric Dashboard

The AMPP-4 Metric Dashboard is an interactive tool used for visualizing key performance indicators and milestones for the various teams in the Material Recovery & Recycle (AMPP-4) group. This dashboard provides current group data for FY25 tracking purposes. The dashboard is organized by various chapters: 1) AMPP-4 overview, 2) Scheduling, and 3) individual chapters for each team. AMPP-4 supports 7 teams, where the day- and swing-shift aqueous demolition teams are treated as one team for the purpose of metric tracking. The dashboard is used internally to monitor the success and health of the AMPP-4 teams. Additionally, the dashboard can be used externally to support programmatic reporting to sponsors and aid in future milestone and work package planning.

97 MATHEMATICS AND COMPUTING↗

Preliminary Benchmark Uncertainties for Deimos, a HALEU-Fueled and Graphite-Moderated Advanced Reactor Testbed

Many advanced reactor concepts will make use of various uranium fuels with levels of enrichment higher than previously seen in current light water reactors. In particular, High-Assay Low Enriched Uranium (HALEU), that is uranium enriched to 235 U ≈ 20 w/o%, is planned to be used in over ten new reactor concepts. HALEU is attractive for advanced reactors as it enables longer intervals between refueling. Unfortunately, little to no experience with HALEU is available in experimental literature raising concerns for not only licensing advanced re actors but also fabrication and transportation of HALEU fuels. This is where Deimos, a Los Alamos National Laboratory internal project, comes in. Deimos is a new critical experiment scheduled for FY24 at the National Criticality Experiments Research Center (NCERC). Deimos is a graphite moderated, graphite and beryllium reflected critical experiment making use of HALEU TRi-structural ISOtropic (TRISO) fuel from the Compact Nuclear Power System (CNPS). This transaction entails a brief description of efforts to benchmark Deimos for inclusion into the International Criticality Safety

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Notes from the GEM Chair

We certainly live in unusual and quite challenging times, and we hope everyone is healthy and doing well. For the first time in almost 30 years, because of the current COVID-19 crisis, the GEM Steering Committee decided to cancel the in-person GEM Summer Workshop and organize a virtual meeting in its place. The Virtual GEM will occur during the same week as the originally scheduled in-person workshop, July 20-23, with Monday July 20 as the student day. We will try to maintain the original format of GEM as much as possible, with plenary sessions in the morning, Focus Group breakout sessions in the afternoon, and poster sessions in the evening. Please provide your full support to the meeting organizers to help make this first VGEM a great success! As of now, we still plan to hold the GEM 2021 summer workshop in Hawaii from July 26-30, 2021, with a GEM student day on July 25. This workshop will be back-to-back with SHINE (to occur at the same hotel the week after GEM) - please consider attending both!

54 ENVIRONMENTAL SCIENCES↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extreme-scale stochastic optimization and simulation via learning-enhanced decomposition and parallelization (Final Technical Report)

Stochastic optimization and simulation models ubiquitously arise in designing and operating complex service/engineering systems. They can be extreme in scale due to high-dimensional data and decisions, and can also involve decisions made sequentially in response to newly revealed data, both causing significant computational challenge. The objective of this research is to explore a unified framework that integrates machine learning with discrete optimization and risk-averse modeling, to improve the efficiency of decomposition paradigms for stochastic optimization and simulations at extreme scale. The models we consider represent a broad class of complex decision-making problems, where 0-1 or continuous decisions are made before and/or after knowing multiple sources of uncertainties that could be correlated. We will employ machine learning methods to dynamically decide and prioritize computational procedures, including cut generation, branching, and bounding of the optimal objective. Furthermore, the research will shed new lights on the traditional decomposition algorithms for extreme-scale computing. Deliverables of the research include new modeling and computational methods for advancing the state-of-the-art research in optimization and simulation, bringing many relevant risk-averse, data-driven optimization problems in practice within the range of tractability. Examples include distributed computing server scheduling and sensor deployment for monitoring critical infrastructures. Success in this effort will enable progress in solving multiple extreme-scale problems in the complex system design and operations arising from DoE missions in energy, environment, and national security.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Procurement Analysis Tool (PAT) Informational Webinar

This is a slide deck for the public PAT Informational Webinar scheduled for July 22, 2025. This the first webinar for PAT after the new tool was launched on nrel.gov on June 16, 2025.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Application of Site Controllers for Electrification of Commercial Fleet Vehicles

Electrification of transportation fleets presents a significant challenge for commercial customers. These challenges can be specific to region, weather, operating schedule, charging infrastructure, and other factors. This paper presents the value of integrating a site controller to monitor the health of assets and co-optimize the operation of commercial sites with multiple distributed energy resource technologies and electric vehicle fleets. The tests demonstrate smart-charging and vehicle-to-building uses compared to business-as-usual cases. The secondary objectives of power management for the customer vehicle are optimized by a planning tool (REopt) and integrated using the site controller. Any deviations from the planned dispatch are addressed by the real-time controllers offering tertiary controls, such as energy management, and limiting the reverse power flow (back into the grid). The results indicate that site controllers offer an efficient solution to manage the health of the connected assets and a scalable means to optimize the operations of a commercial customer with electrified transportation fleets.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Evaluation of Autonomous Vehicle Sensing and Compute Load on a Chassis Dynamometer

The sensing and compute load auxiliary energy consumption in autonomous vehicles may be significant due to the large number of sensors and the high compute load from sensor processing and route planning. To understand this issue, this study investigates the top-down energy usage of an electric 2015 Kia Soul fully instrumented with state sensors and a state-specific computer for path planning and sensor processing. A chassis dynamometer was then used to evaluate the cases of (1) no sensors or computation, (2) only sensors operating, and (3) sensors plus compute load. The vehicle was operated autonomously on the dynamometer using a PolySync drive-kit with drive-by-wire longitudinal control. The DynoJet model 224xLC was used to adapt the eddy current dynamometer's road load parameters to comply with an Environmental Protection Agency drive schedule and to evaluate performance against the Argonne National Laboratory Digital Dynamometer Dataset. On the UDDS-HWFET combined driving cycle, the stock battery's range was reduced by 5.6% for sensors alone and 12.2% for sensors and compute load. These results show that the added sensing and compute auxiliary load from automated and autonomous systems is significant and that research efforts need to be spent investigating new energy efficient systems.

Brown, Nicholas E.↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CESER I-Corps (Final Report)

Energy I-Corps is a U.S. Department of Energy (DOE) sponsored entrepreneurial training program for laboratory researchers aimed at accelerating the commercialization of lab-developed technologies. The program, developed and managed by DOE's Office of Technology Commercialization (OTC) in partnership with the National Laboratory of the Rockies (NLR), uses a customized curriculum built on the Lean Launch Methodology and delivers a rigorous 10- to 12-week training program to selected laboratory-based teams. The Energy I-Corps team at NLR worked with the DOE's OTC and Office of Cybersecurity, Energy Security, and Emergency Response (CESER) to develop and implement commercialization programming for awardees of the CESER Cybersecurity for Distributed Energy Resources Research, Development, and Demonstration Research Call, funded under Provision 40125(b) of the Infrastructure Investment and Jobs Act (IIJA). 40125(b) Projects were overseen by a technical monitor at the National Energy Technology Laboratory (NETL). The CESER Energy I-Corps Program is considered an Energy I-Corps "lite" or "mini" program, with a lighter lift to accommodate scheduling and funding per participant. This final report describes the CESER I-Corps program and provides recommendations on behalf of OTC to CESER to consider if CESER were to run an I-Corps program in future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of BISON Milestones: NEAMS FY2020 Report

This summary report contains an overview of work performed under the work package entitled "FY2020 NEAMS Advanced Fuels Performance'', which is focused on the development and support of the fuel performance code BISON. The second chapter lists FY20 milestones titles, completion schedule, and milestone level. Subsequent chapters summarize and demonstrate completion of the milestones. The last chapter outlines FY21 proposed future work. In FY20, the NEAMS program emphasized development of BISON for its application to advanced reactors. While there are a variety of advanced fuel concepts, based on interaction with industry and the Nuclear Regulatory Commission, the fuel types we chose to develop were metallic fast reactor, UN/UC and particle fuels. The last chapter of this report documents proposed work for FY21. We plan to continue work on metallic and particle fuel in terms of developing/calibrating models and to begin rigorous validation/assessment for both fuel types. Due to the merger of the NEAMS and CASL programs, FY21 will see a return to light water reactor model development and simulation; this time focused on advanced technology fuels. Additionally, we seek to improve BISON, fundamentally. As such, we plan improvements to BISON and MOOSE in terms of algorithmic robustness, performance, ease-of-use, and quality assurance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗