Search NASA⌕ Search

SEARCH · Search NASA

Results for “Secondary Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Design, Development, and Test of the Advanced Apollo Orbital Assembly System

As spaceflight moves toward commercial solutions for Crew Vehicles and Space Stations, opportunity exists to lower costs with novel designs. Probe and cone docking systems provide a lightweight, low cost, and high-performance docking solution. This work revisits the Apollo probe and cone design and modifies it for the requirements of today’s computer-controlled spacecraft. This new system is called the Advanced Apollo Orbital Assembly (APOA) system, and is intended to support satellite, cargo, and space station assembly missions. A simulation of the APOA was programmed, components were sized, and a design was created by scaling the probe to the size of an EELV Secondary Payload Adapter (ESPA) tunnel. Prototype test hardware was 3D printed using Fused Deposition Modeling (FDM) methods with Polylactic Acid (PLA) material. Testing of the APOA-ESPA was conducted at Marshall Space Flight Center’s (MSFC) Flat Floor, and a test-correlated simulation is used to evaluate a Monte-Carlo of Initial Contact Conditions (ICC’s) to establish baseline performance. The successful development, test, and correlation of the APOA-ESPA proves the design validity and increases Technology Readiness Level (TRL) from 2 to 4. This work opens the door to construction of an APOA-ESPA from flight like materials, and to develop a larger scale prototype APOA. When the full scale APOA is incorporated with the Common Berthing Mechanism (CBM), becomes the Hybrid Berthing System (HBS), which allows for berthing without a robotic arm.

Berthing↗

Final Thermal Design and Thermal Vacuum Testing of the StarBurst Instrument

The StarBurst Multimessenger Pioneer is a small satellite mission serving as a wide-field gamma-ray observatory designed to capture the initial emissions of short gamma-ray bursts, electromagnetic signatures of neutron star mergers. This paper presents the final thermal design and analysis of the StarBurst Instrument, comprising the bus-to-instrument interface plate, control electronics, and twelve crystal detector units, which form the core of the mission’s science capability. The passive thermal control system design requires consideration of restrictive keep-out zones, unknown orbital parameters, and narrow temperature limits of the detectors. Also summarized is the instrument level thermal vacuum cycle test, correlated model refinements, and updated model results. Following successful completion of the instrument test campaign, the hardware was integrated with the spacecraft bus for spacecraft level testing, including additional thermal vacuum testing. The results from the spacecraft level thermal vacuum test will further inform the instrument thermal model, ensuring accurate flight temperature predictions. StarBurst launches as a secondary payload in 2027 and has a mission duration of at least one year.

StarBurst↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

Thermal Design and Thermal Vacuum Testing of the StarBurst Instrument

The StarBurst Multimessenger Pioneer is a small satellite mission serving as a wide-field gamma-ray observatory designed to capture the initial emissions of short gamma-ray bursts, electromagnetic signatures of neutron star mergers. This paper presents the final thermal design and analysis of the StarBurst Instrument, comprising the bus-to-instrument interface plate, control electronics, and twelve crystal detector units, which form the core of the mission’s science capability. The passive thermal control system design requires consideration of restrictive keep-out zones, unknown orbital parameters, and narrow temperature limits of the detectors. Also summarized is the instrument level thermal vacuum cycle test, correlated model refinements, and updated model results. Following successful completion of the instrument test campaign, the hardware was integrated with the spacecraft bus for spacecraft level testing, including additional thermal vacuum testing. The results from the spacecraft level thermal vacuum test will further inform the instrument thermal model, ensuring accurate flight temperature predictions. StarBurst launches as a secondary payload in 2027 and has a mission duration of at least one year.

StarBurst↗

ADEPT, A Mechanically Deployable Re-Entry Vehicle System, Enabling Interplanetary CubeSat and Small Satellite Missions

There is growing interest for utilizing Small Satellites beyond low Earth orbit. A number of secondary CubeSat payload missions are planned at Mars, cis-Lunar Space, near Earth objects, and moons of the Gas Giants. Use of smaller systems may enable utilization of otherwise unused capacity of larger "host" missions. Development of re-entry systems that leverage and accommodate Small Satellite technology will substantially expand the range of mission applications by offering the capability for high speed entry or aerocapture at destinations with atmospheres. Deployable entry vehicles (DEVs) offer benefits over traditional rigid aeroshells including volume, mass and payload form factor. The Adaptive Deployable Entry and Placement Technology (ADEPT) offers such a delivery capability for Small Sat or CubeSat orbiter(s), in-situ elements, or landers. The ADEPT system can package with off the shelf CubeSat deployment systems (1U-16U) to offer a delivery capability for a single CubeSat or constellations. Furthermore, ADEPT can deliver the same science payload to a destination with a stowed diameter a factor of 3-4 times smaller than an equivalent rigid aeroshell, alleviating volumetric constraints on the secondary payload accommodation or primary carrier spacecraft bus. This paper will describe ADEPT's current development status and define various interplanetary mission concepts in order to provide guidelines for potential Small Satellite payload developers and mission implementers.

Adaptive Deployable Entry and Placement Technology↗

ADEPT for Interplanetary Small Satellite Missions

There is growing interest for utilizing Small Satellites beyond low Earth orbit. A number of secondary CubeSat payload missions are planned at Mars, cis-Lunar Space, near Earth objects, and moons of the Gas Giants. Use of smaller systems may enable utilization of otherwise unused capacity of larger "host" missions. Development of re-entry systems that leverage and accommodate Small Satellite technology will substantially expand the range of mission applications by offering the capability for high speed entry or aerocapture at destinations with atmospheres. Deployable entry vehicles (DEVs) offer benefits over traditional rigid aeroshells including volume, mass and payload form factor. The Adaptive Deployable Entry and Placement Technology (ADEPT) offers such a delivery capability for Small Sat or CubeSat orbiter(s), in-situ elements, or landers. The ADEPT system can package with off the shelf CubeSat deployment systems (1U-16U) to offer a delivery capability for a single CubeSat or constellations. Furthermore, ADEPT can deliver the same science payload to a destination with a stowed diameter a factor of 3-4 times smaller than an equivalent rigid aeroshell, alleviating volumetric constraints on the secondary payload accommodation or primary carrier spacecraft bus. This paper will describe ADEPT's current development status and define various interplanetary mission concepts in order to provide guidelines for potential Small Satellite payload developers and mission implementers.

Cassell, Alan↗

STS-50 Space Shuttle mission report

The STS-50 Space Shuttle Program Mission Report contains a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the forty-eighth flight of the Space Shuttle Program, and the twelfth flight of the Orbiter vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of the following: an ET which was designated ET-50 (LUT-43); three SSME's which were serial numbers 2019, 2031, and 2011 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-051. The lightweight/redesigned RSRM's installed in each SRB were designated 360L024A for the left RSRM and 360M024B for the right RSRM. The primary objective of the STS-50 flight was to successfully perform the planned operations of the United States Microgravity Laboratory (USML-1) payload. The secondary objectives of this flight were to perform the operations required by the Investigations into Polymer Membrane Processing (IPMP), and the Shuttle Amateur Radio Experiment 2 (SAREX-2) payloads. An additional secondary objective was to meet the requirements of the Ultraviolet Plume Instrument (UVPI), which was flown as a payload of opportunity.

Fricke, Robert W.↗

The Development of Small-Payload Rideshare Capabilities: A 2000-2008 Summary

This paper summarizes the development from 200 to the present of rideshare capabilities by various Government agencies and Organizations. This development will allow acceptable, low cost access to space for small satellites and payloads. The paper reviews the needs for such capabilities and provides an overview of the development and status of the enabling technologies, hardware, etc. required to achieve the desired capability. It reviews the development and status of each principal element necessary in developing an acceptable, low cost, access to space capability for small satellites and payloads.

secondary payloads↗

FASTSAT a Mini-Satellite Mission...A Way Ahead

The Fast Affordable Science and Technology Spacecraft (FASTSAT) is a mini-satellite weighing less than 150 kg. FASTSAT was developed as government-industry collaborative research and development flight project targeting rapid access to space to provide an alternative, low cost platform for a variety of scientific, research, and technology payloads. The initial spacecraft was designed to carry six instruments and launch as a secondary rideshare payload. This design approach greatly reduced overall mission costs while maximizing the on-board payload accommodations. FASTSAT was designed from the ground up to meet a challenging short schedule using modular components with a flexible, configurable layout to enable a broad range of payloads at a lower cost and shorter timeline than scaling down a more complex spacecraft. The integrated spacecraft along with its payloads were readied for launch 15 months from authority to proceed. As an ESPA-class spacecraft, FASTSAT is compatible with many different launch vehicles, including Minotaur I, Minotaur IV, Delta IV, Atlas V, Pegasus, Falcon 1/1e, and Falcon 9. These vehicles offer an array of options for launch sites and provide for a variety of rideshare possibilities.

Boudreaux, Mark↗

CSCP: A new Get Away Special (GAS) project

The Get Away Special (GAS) program has instituted a new project called Complex Self Contained Payloads (CSCP) designed to support GAS type payloads that are beyond the scope of the GAS program. These payloads may be supported by GAS personnel and hardware and will fly as primary or secondary shuttle payloads. The definition, requirements and basic support package for CSCP's are discussed.

Gottlieb, Jack J.↗

STS-40 Space Shuttle mission report

The STS-40 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-first flight of the Space Shuttle and the eleventh flight of the Orbiter Vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of an External Tank (ET) designated as ET-41 (LWT-34), three Space Shuttle main engines (SSME's) (serial numbers 2015, 2022, and 2027 in positions 1, 2, and 3, respectively), and two Solid Rocket Boosters (SRB's) designated as BI-044. The primary objective of the STS-40 flight was to successfully perform the planned operations of the Spacelab Life Sciences-1 (SLS-1) payload. The secondary objectives of this flight were to perform the operations required by the Getaway Special (GAS) payloads and the Middeck O-Gravity Dynamics Experiment (MODE) payload.

Fricke, Robert W.↗

STS-63 Space Shuttle report

The STS-63 Space Shuttle Program Mission Report summarizes the Payload activities and provides detailed data on the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME) systems performance during this sixty-seventh flight of the Space Shuttle Program, the forty-second since the return to flight, and twentieth flight of the Orbiter vehicle Discovery (OV-103). In addition to the OV-103 Orbiter vehicle, the flight vehicle consisted of an ET that was designated ET-68; three SSME's that were designated 2035, 2109, and 2029 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-070. The RSRM's that were an integral part of the SRB's were designated 360Q042A for the left SRB and 360L042B for the right SRB. The STS-63 mission was planned as an 8-day duration mission with two contingency days available for weather avoidance or Orbiter contingency operations. The primary objectives of the STS-63 mission were to perform the Mir rendezvous operations, accomplish the Spacehab-3 experiments, and deploy and retrieve the Shuttle Pointed Autonomous Research Tool for Astronomy-204 (SPARTAN-204) payload. The secondary objectives were to perform the Cryogenic Systems Experiment (CSE)/Shuttle Glo-2 Experiment (GLO-2) Payload (CGP)/Orbital Debris Radar Calibration Spheres (ODERACS-2) (CGP/ODERACS-2) payload objectives, the Solid Surface Combustion Experiment (SSCE), and the Air Force Maui Optical Site Calibration Tests (AMOS). The objectives of the Mir rendezvous/flyby were to verify flight techniques, communication and navigation-aid sensor interfaces, and engineering analyses associated with Shuttle/Mir proximity operations in preparation for the STS-71 docking mission.

Fricke, Robert W., Jr.↗

STS-53 Space Shuttle mission report

The STS-53 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle Main Engine (SSME) subsystems performance during the fifty-second flight of the Space Shuttle Program, and the fifteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET, which was designated as ET-49/LWT-42; three SSME's, which were serial numbers 2024, 2012, and 2017 in positions 1, 2, and 3, respectively; and two SRB's, which were designated BI-055. The lightweight RSRM's that were installed in each SRB were designated 360L028A for the left SRB, and 360L028B for the right SRB. The primary objective of this flight was to successfully deploy the Department of Defense 1 (DOD-1) payload. The secondary objectives of this flight were to perform the operations required by the Glow Experiment/Cryogenic Heat Pipe Experiment Payload (GCP); the Hand-Held, Earth-Oriented, Real-Time, Cooperative, User-Friendly, Location-Targeting and Environmental System (HERCULES); the Space Tissue Loss (STL); the Battlefield Laser Acquisition Sensor Test (BLAST); the Radiation Monitoring Equipment-III (RME-III); the Microcapsules in Space-1 (MIS-1); the Visual Function Tester-2 (VFT-2); the Cosmic Radiation Effects and Activation Monitor (CREAM); the Clouds Logic to Optimize Use of Defense Systems-1A (CLOUDS-1A); the Fluids Acquisition and Resupply Experiment (FARE); and the Orbital Debris Radar Calibration Spheres (ODERACS). In addition to presenting a summary of subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. Listed in the discussion of each anomaly is the officially assigned tracking number as published by each Project Office in their respective Problem Tracking List. All times given in this report are in Greenwich mean time (G.m.t.) as well as mission elapsed time (MET).

Fricke, Robert W., Jr.↗

Low-Cost Approaches to Deep Space Missions

The past decade has brought about a radical transformation in NASA's planetary exploration program. At the beginning of this decade, NASA was focused on the Cassini mission to Saturn. Following on the heels of the successful Voyager and Galileo missions, Cassini represents the culmination of an evolution towards successively larger, more complex, and more expensive spacecraft. The Cassini spacecraft weighs in at over 5 metric tons, and carries an entry probe and a sophisticated suite of sensors supporting 27 different science investigations enabling a comprehensive scientific investigation of Saturn with a single spacecraft. The cost of this spacecraft exceeded $2B, including the cost of the large Titan IV launch vehicle. During Cassini development, NASA realized that it could no longer afford these "flagship" missions, and the agency moved aggressively towards a "faster, better, cheaper" design philosophy of focused science goals and simpler, rapidly-developed spacecraft, allowing much more frequent launches of smaller, lower-cost missions. The Mars Global Surveyor, launched in November 1996, is an example of this new paradigm. Developed in less than 3-years, MGS is only one-fifth the mass of Cassini, and only cost on the order of $220M. The reduced spacecraft mass allows use of the smaller, lower cost Delta launch vehicle. Currently in orbit about Mars, MGS carries a focused suite of six science instruments that are currently returning high-resolution remote sensing of the Martian surface. The future calls for continued even more aggressive mass and cost targets. Examples of these next-generation goals are embodied in the Mars Micromission spacecraft concept, targeted for launch in 2003. With a mass of only 200kg, this lightweight bus can be tailored to carry a variety of payloads to Mars or other inner-planet destinations. The design of the Micromission spacecraft enable them to be launched at extremely low cost as a secondary "piggyback" payload.

Squibb, G. F.↗

STS-45 Space Shuttle mission report

The STS-45 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-sixth flight of the Space Shuttle Program and the eleventh flight of the Orbiter Vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-44 (LWT-37); three Space Shuttle main engines (SSME's), which were serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively; and two Solid Rocket Boosters (SRB's) designated as BI-049. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each of the SRB's were designated as 360L021A for the left SRM and 360W021B for the right SRM. The primary objective of this mission was to successfully perform the planned operations of the Atmospheric Laboratory for Applications and Science-1 (ATLAS-1) and the Shuttle Solar Backscatter Ultraviolet Instrument (SSBUV) payloads. The secondary objectives were to successfully perform all operations necessary to support the requirements of the following: the Space Tissue Loss-01 (STL-01) experiment; the Radiation Monitoring Equipment-3 (RME-3) experiment; the Visual Function Tester-2 (VFT-2) experiment; the Cloud Logic to Optimize use of Defense System (CLOUDS-1A) experiment; the Shuttle Amateur Radio Experiment 2 (SAREX-2) Configuration B; the Investigation into Polymer Membranes Processing experiment; and the Get-Away Special (GAS) payload G-229. The Ultraviolet Plume Instrument (UVPI) was a payload of opportunity that required no special maneuvers. In addition to the primary and secondary objectives, the crew was tasked to perform as many as 10 Development Test Objectives (DTO'S) and 14 Detailed Supplementary Objectives (DSO's).

Fricke, Robert W.↗

STS-64 Space Shuttle mission report

The STS-64 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixty-fourth flight of the Space Shuttle Program and the nineteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-66; three SSMEs that were designated as serial numbers 2031, 2109, and 2029 in positions 1, 2, and 3, respectively; and two SRB's that were designated Bl-068. The RSRM's that were installed in each SRB were designated as 360L041 A for the left SRB, and 360L041 B for the right SRB. The primary objective of this flight was to successfully perform the planned operations of the Lidar In-Space Technology Experiment (LITE), and to deploy the Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) -201 payload. The secondary objectives were to perform the planned activities of the Robot Operated Materials Processing System (ROMPS), the Shuttle Amateur Radio Experiment - 2 (SAREX-2), the Solid Surface Combustion Experiment (SSCE), the Biological Research in Canisters (BRIC) experiment, the Radiation Monitoring Equipment-3 (RME-3) payload, the Military Application of Ship Tracks (MAST) experiment, and the Air Force Maui Optical Site Calibration Test (AMOS) payload.

Fricke, Robert W., Jr.↗