Search NASA⌕ Search

SEARCH · Search NASA

Results for “inverter integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Integrative Quantitative-Phase and Airy Light-Sheet Imaging

Light-sheet microscopy enables considerable speed and phototoxicity gains, while quantitative-phase imaging confers label-free organelle recognition and metabolic information that are inaccessible by conventional methods. We report the fusion of these two modalities onto a standard inverted microscope that retains compatibility with microfluidics. We describe the utilization of an accelerating Airy-beam light-sheet yielding identical imaging areas with interferometry, and an application in unmasking the effects of cellular noise on metabolic compartmentalization.

Biological sciences, Biological techniques, Micros↗

Integrated On-Board Charger for Dual Motor Based Electric Vehicle Power Train

This paper presents an integrated on-board charger for dual motor based electric vehicle (EV) power train with silicon carbide semiconductor switch-based traction inverters. The proposed charger architecture reconfigures the traction inverters to be used in the battery charging mode, thereby eliminating several high frequency switches and their accessories. The motor windings are reused as line inductors for the power factor correction (PFC) rectifier stage in the charging mode thereby reducing the requirements of magnetic components. The architectures reduce the cost, weight, and volume of the EV power train. Simulation results are presented to demonstrate the working principle of the proposed architecture.

Mukherjee, Subho [ORNL] (ORCID:0009000672297925)↗

Detection and Diagnosis of Data Integrity Attacks in Solar Farms Based on Multilayer Long Short-Term Memory Network

Photovoltaic (PV) systems are becoming more vulnerable to cyber threats. In response to this emerging concern, developing cyber-secure power electronics converters has received increased attention from the IEEE Power Electronics Society that recently launched a cyber-physical-security initiative. Here this letter proposes a deep sequence learning based diagnosis solution for data integrity attacks on PV systems in smart grids, including dc–dc and dc–ac converters. The multilayer long short-term memory networks are used to leverage time-series electric waveform data from current and voltage sensors in PV systems. The proposed method has been evaluated in a PV smart grid benchmark model with extensive quantitative analysis. As a comparison, we have evaluated classic data-driven methods, including K-nearest neighbor, decision tree, support vector machine, artificial neural network, and convolutional neural network. Comparison results verify performances of the proposed method for detection and diagnosis of various data integrity attacks on PV systems.

42 ENGINEERING↗

Foil Bearing Supported Compressor-Expander

R&D Dynamics Corporation (RDD) is developing a fuel cell system compressor-expander designed for heavy-duty vehicle applications. The system emphasizes high reliability, versatility, long service life, and cost-effective mass production. Its design integrates a high-speed centrifugal compressor/expander, oil-free foil air/gas bearings, a direct current permanent magnet (DCPM) motor, and an inverter utilizing silicon carbide (SiC) switches. Key advantages include high efficiency, compact size and reduced weight, enhanced reliability, and elimination of oil contamination risks. The technology targets multiple sectors such as long-haul semi-trucks, mining and construction equipment, power generation, data centers, marine systems, and other heavy machinery. Evaluation units are ready for shipment, and manufacturing capabilities are currently being developed. Contract Number: DE-EE0009617 (2021).

30 DIRECT ENERGY CONVERSION↗

2022 Component Innovation Awardee: Windurance

Combining battery energy storage with distributed wind energy systems can increase production, ability to meet local electricity demands, interconnection capacity, and potential sales of surplus energy back to the grid, while reducing demand charges and the overall levelized cost of energy (LCOE). Energy storage options for distributed wind energy systems can vary widely in terms of power level and energy storage capacity, and their potential benefits depend on factors including wind resource, turbine design, connection requirements, use patterns, utility rates, and regulations. Windurance received a 2022 Competitiveness Improvement Project (CIP) funding award to add battery energy storage capabilities to the company's bidirectional DC converter. The energy storage component will complete a comprehensive portfolio of power conversion and control electronics that can be seamlessly integrated with distributed wind systems. The company received earlier CIP awards to fund prototype design and construction of wind turbine pitch actuators, inverters, and controllers.

CIP↗

Time-Disciplined Non-PLL Active Synchronization for Grid-Forming Inverters: Preprint

Grid Forming Inverters (GFMIs) are a critical component of the future Grid. One major challenge with GFMIs is synchronization. Currently, most research in GFMI synchronization is focused around specific transition types but this is only a subcategory of the possible events facing GFMIs. In this paper, we propose categorizing all possible synchronization events into four categories: (1) Initial Grid Synchronization, (2) Ride-Through, (3) Blackstart Coordination, (4) Grid Reconnection Coordination. By categorizing events, we can better compare and integrate different control strategies under specific test conditions as demonstrated in simulation. This paper’s framework helps guide GFMI primary-level control design to further research towards the 100% inverter-dominant Grid.

blackstart↗

Time Disciplined Non-PLL Active Synchronization for Grid Forming Inverters

Grid forming inverters (GFMIs) are a critical component of the future grid. One major challenge with GFMIs is synchronization. Currently, most research in GFMI synchronization is focused around specific transition types but this is only a subcategory of the possible events facing GFMIs. In this paper, we propose categorizing all possible synchronization events into four categories: (1) initial grid synchronization, (2) ride-through, (3) blackstart coordination, (4) grid reconnection coordination. By categorizing events, we can better compare and integrate different control strategies under specific test conditions as demonstrated in simulation. This paper's framework helps guide GFMI primary-level control design to further research towards the 100% inverter-dominant grid.

blackstart↗

Battery energy storage control systems and methods for a grid tie inverter coupled to a photovoltaic system

A distributed control system uses a central controller in Internet communication with a local controller to manage grid tie attachment with a battery to form an integrated battery energy storage system (BESS). The BESS is capable of charging or discharging the battery, as well as correcting grid phase with volt amp reactive (VAR) leading or lagging operation modes. Examples shown include simple BESS charging and discharging, BESS integrated with renewable energy sources (here photovoltaic), and direct current fast charge (DCFC) connections with an electric vehicle.

Gadh, Rajit↗

A Digital Twin for an Inverter-Based Resource Power Plant: Real-time data streaming unlocks situation awareness

Here, this study presents the development and successful implementation of a digital twin specifically designed for a grid-connected IBR power plant. By integrating a reduced-order model of the IBR system and dynamically updating the grid impedance with real-time data, the digital twin effectively captures and replicates the behavior of the physical system. Its accuracy and reliability are validated through critical test scenarios, including a three-phase fault and a line-tripping event. The results confirm that the digital twin closely emulates its physical counterpart, demonstrating its strong potential for real-time analysis, system monitoring, and predictive decision making in modern power systems.

Digital twins↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Beyond DERMS: Platform Development, Flexibility, Prediction, and Value Measurements

This report describes the results from the “Beyond DERMS” project that aims to build, deploy, and demonstrate - at megawatt scale with thousands of devices - a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. The results demonstrate how emerging ‘internet of energy’ technologies can be leveraged to simultaneously solve the grid problems of today and prepare for the challenges of tomorrow in a way that goes beyond the capabilities of existing distributed energy resource management systems (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Cyber-attack Detection in Photovoltaic Farms

Here, to address the cyber-physical security in PV farms, a hybrid cyber-attack detection is proposed in this manuscript. To secure PV farms, the proposed method integrates model-based and data-driven methods by fusing the detection score at the device and system levels. First, a model-based cyber-attack detection method is developed for each PV inverter. A residual between the estimation of the Kalman filter and measurement is calculated. By leveraging the calculated residual from all inverters, a squared Mahalanobis distance is developed for device detection score generation. At the system level, a convolutional neural network (CNN) is proposed to detect cyber-attack using the waveform data at the point of common coupling (PCC) in PV farms. To improve the CNN detection accuracy, a set of well-designed features are extracted from the raw waveform data. Finally, a weighted detection score fusion method is proposed to combine device and system detection scores by using their complementary strength. The feasibility and robustness of the proposed method are validated by testing cases and a comparative experiment.

14 SOLAR ENERGY↗

Deep Learning-Based Dynamic Modeling of Three-Phase Voltage Source Inverters

Inverter-based resource (IBR) models are necessary to analyze modern power system stability and create effective control strategies. Modeling IBRs in converter-rich power systems is crucial, yet challenging due to the lack of commercial information on converter topologies and control parameters. This paper proposes novel convolutional neural network (CNN)–based data-driven techniques for modeling IBRs, addressing adaptability and proprietary concerns without requiring internal system physics knowledge. The proposed method is tested using real grid-tied commercial IBR transient data and demonstrates effectiveness and accuracy. Furthermore, the developed modeling approach is integrated and implemented in the open-source power distribution simulation and analysis tool, GridLAB-D, to illustrate the potentiality of dynamic analysis of large-scale power systems with high IBRs.

deep learning, artificial intelligence↗

Feed-Forward Compensation for Model Predictive Control in Tri-port Current-Source Medium-Voltage String Inverters for PV-Plus-Storage Farms

The novel tri-port current-source medium-voltage string inverter (TCS-MVSI) is a promising candidate for large-scale PV-plus-storage (PVS) farms owing to its galvanic isolation, easy storage integration, soft-switching capability across entire load range, controlled low dv/dt and EMI, benign fault tolerance, etc. Due to its low inertia feature, traditional PI-based control cannot manage large transients effectively. Instead, a model-based predictive control (MPC) is proposed to achieve robust and stable operation. As is well known, the control performance of MPC is compromised by the sampling and computational delay during implementation significantly, if not well addressed. This paper analyzed and quantified these delays and then proposes feed-forward compensation (FFC) for the MPC method to compensate the delays and the large parameter variations due to the low-inertia nature. In addition, this method also compensates for the high dc-link ripple within each switching cycle, a unique issue for low-inertia converters. Here, the proposed method requires low computational effort, allowing it to be extended for multiple ports. The effectiveness of the proposed method has been validated in experiments. In 10 kW test, the proposed method decreases the average dc-link current by 17%, leading to ~20% conduction losses and ~0.5% increase in converter efficiency. In addition, the peak dc-link current also decreases by 15%, resulting in reduced transformer size. As a result, an increased power density can be achieved with the proposed method. Similar improvements have been observed across the power range from 2 kW to 10 kW.

30 DIRECT ENERGY CONVERSION↗

Performance Specifications for Grid-Forming Technologies

Standards and specifications for inverter-based resources (IBRs) focus primarily on grid-following (GFL) technologies at present. Therefore, these may generally not be appropriate for application in power systems to ensure acceptable operation with grid-forming (GFM) technologies. In some cases, the direct application of prevailing standards and specifications may not be appropriate for - or may even inadvertently limit the potential of - GFM resources. The Universal Interoperability for Grid- Forming Inverters (UNIFI) Consortium is a U.S. Department of Energy funded effort to advance GFM technology. The UNIFI team brings together academic, industrial, and national-lab researchers as well as industry stakeholders (utilities, system operators, vendors) to collaboratively pursue advances in a broad range of GFM technologies. This paper introduces a set of system- and unit-level specifications driven by consensus across the UNIFI project team. These are intended to seamlessly integrate GFM technologies at any scale into power-systems operation and control in a vendor-agnostic manner. A suite of illustrative simulation results that demonstrate the application of and adherence to the proposed specifications are included.

grid-forming inverter↗

Rapid 3D nanoscale coherent imaging via physics-aware deep learning

Phase retrieval, the problem of recovering lost phase information from measured intensity alone, is an inverse problem that is widely faced in various imaging modalities ranging from astronomy to nanoscale imaging. The current process of phase recovery is iterative in nature. As a result, the image formation is time consuming and computationally expensive, precluding real-time imaging. Here, we use 3D nanoscale X-ray imaging as a representative example to develop a deep learning model to address this phase retrieval problem. We introduce 3D-CDI-NN, a deep convolutional neural network and differential programing framework trained to predict 3D structure and strain, solely from input 3D X-ray coherent scattering data. Our networks are designed to be “physics-aware” in multiple aspects; in that the physics of the X-ray scattering process is explicitly enforced in the training of the network, and the training data are drawn from atomistic simulations that are representative of the physics of the material. We further refine the neural network prediction through a physics-based optimization procedure to enable maximum accuracy at lowest computational cost. 3D-CDI-NN can invert a 3D coherent diffraction pattern to real-space structure and strain hundreds of times faster than traditional iterative phase retrieval methods. Our integrated machine learning and differential programing solution to the phase retrieval problem is broadly applicable across inverse problems in other application areas.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Synchronous Machine Governor Upgrade

Conventional generation sources play a critical role in the stability and reliability of the electrical grid, particularly as we transition towards more renewable energy sources. To understand and accurately emulate their behavior for optimizing grid operations and ensuring seamless integration with renewable technologies, it is essential to better emulate the grid- and plant-level impacts of conventional generation sources, such as natural gas (NG) driven heat recovery steam generators (HRSGs) and combustion turbines (CTs). Therefore, a governor model is developed in a programmable logic controller (PLC) to investigate the performance of the conventional generator under various dynamic operating conditions and to identify the impact on grid stability in a controlled environment. The governor model aims to enable the hardware-in-the-loop (HIL) based emulation of these conventional generation sources using the existing 2 MVA synchronous machine/generator that is driven by a flexible 2.5 MW variable speed drive. This setup will allow us to replicate the dynamic characteristics and response behaviors of NG-driven HRSGs and CTs. The controls for the emulated conventional plants follow the industry standard and are adjustable, ensuring they accurately reflect the operational capabilities and limitations of real-world systems. These controls include load-following capabilities, ramp rates, startup and shutdown sequences, and emissions characteristics. By incorporating these adjustable controls, we aim to capture the nuanced impacts of conventional generation, such as their ability to provide ancillary services like frequency regulation, voltage support, and spinning reserve. In this report, we simulate two types of dynamic operations: grid-connected and islanding. For each dynamic operation, representative starting sequences are tested, including turbine purge, ignition, speed ramping up, generator excitation and synchronizing, and breaker close. The HIL based tests provides insights for field deployment, specifically the high-fidelity governor model provides results to predict the potential stability and reliability risk and suggest possible integration measures (e.g., generation and load balancing, tuning of governor control parameters). Ultimately, this enhanced emulation capability will be integrated into our Advanced Research on Integrated Energy Systems (ARIES), enabling us to conduct comprehensive studies on the interactions between conventional and renewable energy sources. By better understanding these interactions, we can develop strategies to optimize the overall performance and reliability of the grid. This will support the deployment of advanced grid management techniques, such as demand response, grid-forming inverters, and energy storage systems. The main contributions are summarized as follows: (1) This report introduces a PLC-based governor model for gas turbines. This model accurately simulates the dynamic behavior of conventional generation sources under various operational scenarios; (2) The model is integrated with an HIL testbed that includes a 2.5 MW variable speed drive and a 2 MVA synchronous machine. This setup enables realistic, real-time emulation of conventional power plants, particularly NG driven HRSGs and CTs; (3) The developed model is adaptable to various gas turbine configurations and allows for precise control over parameters such as MW ramp rates. This flexibility makes it a valuable tool for future research and industry collaboration; and (4) By incorporating the model into the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems, the report lays the groundwork for future studies on interactions between conventional and renewable energy sources, enhancing the ability to develop advanced grid management strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗